Investor presentation - Resources Rising Stars Conference
Released
Released
Announcement PDF
Registered Offices – Trek Metals Limited – ARBN 124 462 826
Australia
Suite 5/2 Centro Avenue
Subiaco Western
Australia 6008
Bermuda
Vallis Building, 4th Floor
58 Par-la-Ville Road
Hamilton HM 11
Postal
PO Box 1696
Subiaco
WA 6904
Phone
08 6383 7844
Email
info@trekmetals.com.au
9 SEPTEMBER 2026
TREK METALS TO PRESENT AT RESOURCES RISING
STARS INVESTOR CONFERENCE
Trek Metals Limited (ASX:TKM) is pleased to advise shareholders and investors that its Chief
Executive Officer, Derek Marshall will be presenting at the Resources Rising Stars Gold Coast
Investor Conference, being held on Wednesday 9th September and Thursday 10th September
2026.
Mr Marshall will provide an update on the Company’s activities and outlook.
The conference will be live-streamed and shareholders and investors can attend either in-
person or virtually via the livestream. There is no charge to attend either the live-stream or
in-person event for investors, however registration is essential.
Venue: RACV Royal Pines Resort, Ross St, Benowa QLD 4217
Register: RRS Investor
It is recommended that online investors pre-register prior to the commencement of the
presentation.
A full Conference program can be downloaded from here.
Authorised for release by the Board.
ENDS
For further information contact:
INVESTORS: MEDIA:
Derek Marshall Nicholas Read
dmarshall@trekmetals.com.au info@trekmetals.com.au 0419 929 046
JOIN TKM’S INTERACTIVE INVESTOR HUB
https://trekmetals.com.au/auth/signup
Interact with Trek Metal’s announcements and updates by asking
questions and comments which our team can respond to where possible
https://trekmetals.com.au/link/PdVbke
ASX: TKM
An Emerging New
Manganese District
in Western Australia?
Christmas Creek, Western Australia
Investor Presentation | RRS Gold Coast | Sept 2026
2
56.7% Mn
Sample ID OS0063065
59.65% Mn
Sample ID OS0063031
3
10m @ 42.3% Mn from 13m
in 26XCRC020
4
Maiden Drilling at Kuro
Chargeability (IP) Targets
72 Drill Holes completed in Phase 1
for 4,638m
Best results to date target Induced
Polarisation (IP) chargeability highs
Standout intersection
10m @ 42.3% Mn from 13m in 26XCRC020
https://trekmetals.com.au/announcements/7724003
* Visual estimates of mineral abundance should never be considered a
proxy or substitute for laboratory analyses where concentrations or grades
are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
The visually observed manganese mineralisation is not representative of
the entire Kuro Prospect, with drilling currently on-going to further assess
the distribution of manganese.
Representative drill samples are being routinely collected from the drill rig
and will be analysed at ALS laboratories and reported in due course (first
batch reported, second batch expected early September, final batch from
Phase 1 expected mid-late September).
Refer ASX announcements 29/06/2026 & 23/07/2026 for additional
detailed information regarding visual estimates.
5
Maiden Drilling at Kuro
10m @ 42.3% Mn from 13m
Recent holes targeting
undercover has returned
greatest thickness of Mn*
Mn intersections* appear
to show thickening
adjacent to interpreted
faults (similar to Woodie
Woodie)
Mn mineralisation* open
to the SE, trending into
Trek’s EL application
E80/6010
*Mixed laboratory and visual observations. Third batch of
Phase 1 laboratory assays are still pending. Down-hole
intervals do not necessarily represent true widths
https://trekmetals.com.au/announcements/7724003
6
Maiden Drilling at Kuro
Best Mn* Undercover
Recent holes targeting
undercover has returned
greatest thickness of Mn*
Mn intersections* appear
to show thickening
adjacent to interpreted
faults (similar to Woodie
Woodie)
Mn mineralisation* open
to the SE, trending into
Trek’s EL application
E80/6010
*Mixed laboratory and visual observations. Two thirds of
Phase 1 laboratory assays are still pending. Down-hole
intervals do not necessarily represent true widths
https://trekmetals.com.au/announcements/7724003
7
Kuro Phase 2 Drilling – In Progress
Targeting New Zones
Induced Polarisation (IP) surveying
completed over the immediate
Kuro extensions
New drill targets identified based
on chargeability, conductivity &
gravity
2,500m Phase 2 RC drilling
recently commenced, targeting
scale potential
https://trekmetals.com.au/announcements/7689981
8
Regional Upside Potential
Interpreted Prospective Basin
30km interpreted extension to the
host basin for Kuro Mn discovery
Significant search space to explore
for additional accumulations of
manganese
Main trend extending to the SE into
Trek EL Application E80/6010
https://trekmetals.com.au/announcements/7689981
9
Regional Upside Potential
A New Manganese District?
5,608km² of newly
pegged belt-scale
exploration tenure
First-mover position in
under-explored
Proterozoic basin
margins
Trek’s total exploration
landholding in the
district now 7,040km²
https://trekmetals.com.au/announcements/7399456
10
Location
Kimberley Region
◆ Kuro sits 50km south of the Great
Northern Highway
◆ Three ports with bulk handling facilities
nearby (Derby, Wyndham & Broome)
◆ 5,608km² new tenement applications
Distances
Kuro → Highway 50km
Kuro → Derby 480km
Kuro → Wyndham 563km
Kuro → Broome 622km
11
Activity Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26
Kuro Mn heritage survey (complete)
IP geophysical surveys (complete)
Ground gravity geophysical surveys (complete)
Kuro Mn exploration drilling Phase 1 (complete)
Regional exploration drilling (complete)
Kuro Mn exploration drilling Phase 1 results
Martin Au SAM geophysical surveying (complete)
Kuro Mn + Martin Au follow-up drilling
Magnetic & radiometric survey (complete)
Planned regional recon / mapping
Planned Kuro Mn metallurgical drilling
Activity Timeline
12
8.33%
CORPORATE SUMMARY
Strong Balance Sheet, Leveraged to Success
Capital Structure
ASX Code TKM.ASX
Share Price (31 Aug 2026) $0.057
Ordinary Shares 731.17m
Unlisted Options ($0.225 exp 24 Feb 2028) 7.86m
Performance Rights 82.2m
Market Cap (undiluted) $41.67m
Cash and cash equivalents (31 Aug 2026 - unaudited) $11.66m
Debt nil
Enterprise Value $30.01m
Board & Management
65.04%
Top 100 Holders
Share Price and Volume
0.0 M
2.0 M
4.0 M
6.0 M
8.0 M
10.0 M
12.0 M
14.0 M
16.0 M
18.0 M
$0.00
$0.05
$0.10
$0.15
$0.20
$0.25
Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26
Volume
Closing
Share
Price
(A$/share)
Volume Close
13
Emerging Manganese Exploration Opportunity
High-grade
Rock chips ~50% Mn, up to 60.1% Mn
Drilling 10m @ 42% Mn from 13m
Premium manganese (>44% Mn)
is rare and drives value
Large, under-explored system
Extensive >1,200km² package of highly
prospective, under-explored ground
Potential for multiple manganese
positions
Clear near-term catalysts
Manganese drilling and geophysical
targeting on-going
Designed to test grade, width and depth
& provide metallurgical samples
Scale potential
750m of high-grade manganese at
surface & more undercover
Unexplored 30km interpreted sub-basin
hosting the known Mn at Kuro
https://trekmetals.com.au/announcements/7326226
trekmetals.com.au
15
Disclaimer
This presentation prepared by Trek Metals Limited (“Company”) does not purport to contain all the information that a prospective investor may require in connection with any potential investment in the Company.
You should not treat the contents of this presentation, or any information provided in connection with it, as financial advice, financial product advice or advice relating to legal, taxation or investment matters. No
representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. This presentation is
provided expressly on the basis that you will carry out your own independent inquiries into the matters contained in the presentation and make your own independent decisions about the affairs, financial position
or prospects of the Company. The Company reserves the right to update, amend or supplement the information at any time in its absolute discretion (without incurring any obligation to do so). To the maximum
extent permitted by law, none of the Company its directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on
the part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. This presentation is not an offer, invitation, solicitation or
other recommendation with respect to the subscription for, purchase or sale of any security, and neither this presentation nor anything in it shall form the basis of any contract or commitment whatsoever.
Forward Looking Statements
This presentation may contain forward looking statements that are subject to risk factors associated with mineral exploration, mining and production businesses. It is believed that the expectations reflected in
these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited
to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and
regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. This presentation also contains
reference to certain intentions, expectations, future plans, strategy and prospects of the Company. Those intentions, expectations, future plans, strategy and prospects may or may not be achieved. They are
based on certain assumptions, which may not be met or on which views may differ and may be affected by known and unknown risks. The performance and operations of the Company may be influenced by a
number of factors, many of which are outside the control of the Company. No representation or warranty, express or implied, is made by the Company, or any of its directors, officers, employees, advisers or
agents that any intentions, expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved. Given the risks and uncertainties that may cause the Company’s
actual future results, performance or achievements to be materially different from those expected, planned or intended, recipients should not place undue reliance on these intentions, expectations, future plans,
strategy and prospects. The Company does not warrant or represent that the actual results, performance or achievements will be as expected, planned or intended. These forward-looking statements are
expressed in good faith and believed to have a reasonable basis. These statements reflect current expectations, intentions or strategies regarding the future and assumptions based on currently available
information. Should one or more risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this
announcement. The forward-looking statements are made as at the date of this announcement and the Company disclaims any intent or obligation to update publicly such forward looking statements, whether as
the result of new information, future events or results or otherwise.
Competent Person’s Statement - Exploration Results
The information in this presentation relating to Exploration Results is based on information compiled by the Company’s Chief Executive Officer, Mr Derek Marshall, a competent person, who is a Member of the
Australian Institute of Geoscientists. Mr Marshall has sufficient experience relevant to the style of mineralisation and to the type of activity described to qualify as a competent person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.” Mr Marshall holds or controls share and Performance Rights in the Company. The Company
confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement which can be found at https://trekmetals.com.au/announcements
Mr Marshall consents to the inclusion in this announcement of the matters based on his information in the form and content in which it appears.
Cautionary Statement: * Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. The visually observed manganese mineralisation is not
representative of the entire Kuro Prospect, with drilling currently on-going to further assess the distribution of manganese. Representative drill samples are being routinely collected from the drill rig and will be
analysed at ALS laboratories and reported in due course (laboratory assay results are expected progressively). Refer TKM ASX announcement 23/07/2026 for additional detailed information regarding visual
estimates.
For Additional Information refer TKM ASX Announcements
https://trekmetals.com.au/announcements
Approved for Release by the Board
Share your feedback
Discover