Initial RC drilling expands high-grade gold mineralisation
Released
Released
Announcement PDF
15 July 2025
Initial RC Drilling Expands High-Grade Gold Mineralisation at
Martin Prospect, Christmas Creek Gold Project
Strong start to 2025 drill program with high-grade hits in multiple RC drill-holes at Martin
Highlights
•
•
•
•
•
High-grade gold assays returned from initial Reverse Circulation (RC) drilling at the Martin
Prospect, the first of multiple large-scale targets being tested at the Christmas Creek Project:
o 4m @ 14.18g/t Au from 43m in hole 25XCRC001, including 2m @ 27.95g/t Au,
o 3m @ 6.17g/t Au from 94m in hole 25XCRC005, including 2m @ 9.20g/t Au,
o 3m @ 2.15g/t Au from 78m in hole 25XCRC003
Results extend the zone of high-grade mineralisation intersected last year:
o 10m at 12.66g/t Au from 59m and 10m at 7.34g/t Au in hole 24XCRC097
Four of the five initial step-out holes intersected gold, confirming the potential at Martin.
RC drilling is continuing at Christmas Creek, with numerous targets to be tested in the coming
weeks including Martin, Turner, Zahn and Coogan-Brockhurst.
Diamond drilling has also now commenced at Martin (see Figure 1), targeting RC intercepts to
obtain detailed structural information on the orientation and controls on the mineralisation,
assisting with optimising follow-up drilling.
Figure 1. DDH1 Drilling’s diamond rig on-site at Trek’s Christmas Creek Project.
Trek Metals Limited (ASX: TKM) (“Trek” or the “Company”) is pleased to advise that it has made a
strong start to the Reverse Circulation (RC) drill program at its 100%-owned Christmas Creek Gold
Project in the Kimberley region of WA, with initial drilling extending the high-grade mineralisation
discovered last year at the Martin Prospect.
Preliminary assays have been returned for the first five RC holes of the ongoing program at Christmas
Creek, which were drilled around the intercepts reported last year in hole 24XCRC097 (10m at
12.66g/t Au from 59m and 10m at 7.34g/t Au from 94m).
Four of the five holes intersected significant gold mineralisation, with the new results shown in plan
view (Figure 2) and cross-section (Figure 3) below, relative to the 2024 drill intercept:
o
o
o
o
4m @ 14.18g/t Au from 43m in hole 25XCRC001, including 2m @ 27.95g/t Au,
3m @ 6.17g/t Au from 94m in hole 25XCRC005, including 2m @ 9.20g/t Au,
3m @ 2.15g/t Au from 78m in hole 25XCRC003
1m @ 1.5g/t from 106m in hole 25XCRC004
Figure 2. Plan view of new RC drill-holes completed around the high-grade intercept returned last year in 24XCRC097,
highlighting the interpreted dominant stacked vein orientation of SW-NE in solid blue lines, with high-grade gold intersected
in four of the five initial step-out holes drilled in the 2025 field season. An interpreted fault is included as a dashed line.
Section line referring to Figure 3 shown as A-A’.
2
These initial five RC drill holes were designed as 20m step-outs from 24XCRC097. The results correlate
well with the interpretation from down-hole televiewer surveys completed late last year that the highgrade mineralisation at Martin is hosted in a stacked vein array in a southwest-northeast orientation
(refer Figure 2 above and previous announcement ASX: TKM 19th Feb 2025). This also matches the
~1km NE trend identified in drilling to date at Martin (Figure 4).
Figure 3. Cross-section view to the NE (clip +/-40m) of RC drill-holes around the high-grade intercept returned last year in
24XCRC097, highlighting the interpreted dominant stacked vein being sub-vertical (interpreted to be steeply dipping to the
SE), with high-grade gold intersected in four of the five initial step out holes drilled in the 2025 field season. Refer to Figure
2 for section line shown as A-A’.
The veins are interpreted to be in a sub-vertical orientation based on the gold intercepts in the recent
RC drilling, which confirms the interpretation from the televiewer data in hole 24XCRC097. However,
the new results suggest that the high-grade mineralisation dips steeply to the south-east, rather than
the north-west as previously thought (Figure 3).
These initial holes totalled 830m of drilling (25XCRC001 to 005) and were completed at the Martin
Prospect (Figures 4 & 6 and Table 1). Trek would like to acknowledge the support of the West
Australian State Government’s Exploration Incentive Scheme (EIS) as co-contributors towards the
3
current drill program at Christmas Creek. The WA Government’s support of the junior minerals
industry is greatly appreciated, helping to support frontier exploration initiatives such as this with the
potential to unlock major new gold discoveries.
Diamond Drilling
A DDH1 diamond drill rig arrived on site this week and has commenced drilling at Martin Prospect to
assist with determining the structural orientation of the stratigraphy and to help identify key
structures that control the gold mineralisation intersected in the RC drilling to date. The diamond rig
will also provide the ability to test deeper into the mineralised system, beyond the capacity of the RC
rig.
Trek Metals CEO, Derek Marshall, said: “This is a tremendous start to our 2025 drilling campaign.
Intersecting significant high-grade gold mineralisation in four out of the first five RC holes gives us
confidence we are in fertile environment with the potential to host significant gold mineralisation.
“The early data from the drilling shows that there are two dominant mineralised trends, and potentially
two distinct styles of mineralisation at Martin – one oriented NE-SW and the other SE-NW, respectively
extending over ~1km and ~1.5km as shown in Figure 4. While it’s still early days in the exploration
process, this shows that the potential for a major new gold orogenic discovery is high. We just need to
do more work to understand the orientation, controls and broader context of the mineralisation.
“Diamond drilling will provide us with invaluable structural information, as well as the ability to drill
deeper below these intercepts – helping us to better understand how gold mineralisation is formed in
the Christmas Creek area. This will give us a big advantage in terms of understanding how to unlock
the broader potential of the project.
“While diamond drilling progresses, the RC rig has moved to do an initial test of the high-potential
Turner prospect, outlined in a recent announcement. We are also excited to test some of the other
high-priority prospects at Christmas Creek such as Zahn and Coogan-Brockhurst. This is an exciting
time for Trek as our drilling gains momentum and we work to uncover the potential for a large orogenic
gold discovery in the Kimberley.”
Figure 4. Martin Prospect gold in drilling results highlighting the two emerging gold trends.
4
Next Steps
The focus now is to determine the controls on the distribution of high-grade gold mineralisation at
Martin and generate/refine robust large-scale drill targets across the Christmas Creek Project.
Of immediate importance is:
•
Continued RC drilling, including:
o Turner, an undrilled prospect with gold nugget field in the northern part of the project
area identified via stream sediment catchment analysis and historically targeted by
prospectors. (TKM ASX Release, 3 July 2025) – RC drilling currently underway.
o Zahn, the largest surface geochemical target defined at the project to date and reinterpreted to represent a classic structural setting for a major orogenic gold (TKM
ASX Release, 10 March 2025) – RC drilling to commence in shortly.
o Coogan-Brockhurst, an interpreted intrusion related gold-copper system with
adjacent discrete gravity feature (TKM ASX Release, 10 March 2025) – RC drilling to
commence in the coming weeks.
•
Diamond drilling at the Martin Prospect, as outlined above – currently underway.
This next round of work is designed to further enhance the Company’s understanding of the structure
and controls over the mineralisation at the Christmas Creek Project.
Targeting Orogenic Gold via Undercover Exploration
Trek believes that the next round of major mineral discoveries are likely to come from “undercover”
where the gold-bearing host rocks are obscured by recent sand cover, meaning they have not been
subjected to the prospecting style of mineral exploration that would be expected of a belt of fertile
rocks in Western Australia.
The Christmas Creek Project is largely under shallow cover and is effectively a new search space we
are exploring in.
Orogenic gold systems offer the potential for large, high-grade and long-life gold mining operations.
They are largely the most economically important gold deposit type globally:
•
•
•
•
•
Globally significant deposit type — large, long-life gold producers (e.g., Kalgoorlie, Tanami).
Structurally controlled — associated with major crustal scale faults and commonly in adjacent
folds and subsidiary fault structures.
Large fluid systems — potential for Tier 1, multi-million-ounce discoveries.
Deep, high-grade systems — long mine life and underground development potential.
Strong economics — high-grade ore shoots remain profitable across market cycles.
The gold mineral system identified at Martin to date occurs under shallow transported sand cover and
is interpreted to represent a classic orogenic style of gold.
The mineralisation observed in recent logging on site at Christmas Creek is typical of orogenic style
gold with strong sericite-chlorite and potassic alteration, silicification, iron sulphides, quartz veins,
quartz breccias and, on occasion, visible gold (similar that announced previously on the 18th March
2025 ASX: TKM, https://trekmetals.com.au/announcements/6868012).
5
Christmas Creek Project (Kimberley, Western Australia)
Located south-west of Halls Creek, the Christmas Creek Project (Figure 5) comprises a largely
concealed district-scale gold and rare earths exploration opportunity in the Kimberley region of WA
associated with major continental-scale tectonic lineament intersections.
The Christmas Creek Project was previously part of Newmont Exploration Pty Ltd’s (Newmont) global
exploration portfolio with Trek acquiring the project in the December 2023 Quarter. The Company
also secured additional tenement applications, adding to this district-scale greenfields gold and rare
earths exploration project.
Four main undercover prospects – Coogan, Martin, Zahn and Willis – were identified via fine fraction
soil sampling and Turner was identified by previous explorers via the occurrence of gold nuggets and
anomalous rock chip samples and stream sediment catchment analysis (Figure 6).
Significant gold intercepts1 have been returned from Martin, with encouraging anomalism identified
at both Coogan and Zahn, indicating that gold-rich fluids have passed through the structures at these
locations. The Turner Prospect is currently being drill tested. Trek is focused on identifying traps sites
with significant accumulations of gold mineralisation.
1
Previously announced significant intercepts and collar tables from historical work at Christmas Creek can be found
in Trek’s project acquisition announcement via https://investorhub.trekmetals.com.au/announcements/4421568 and
more recent high-grade intercepts drilled by Trek via https://trekmetals.com.au/announcements/6605930
Figure 5: Continental-scale context and location map for the Christmas Creek Project, located at the intersection of G3 and
G5 metallogenic lineament corridors, potentially representing the intersection of the Granites-Tanami Orogen & the Halls
Creek Orogen.
6
Figure 6: Prospect area map for the Christmas Creek Project area. Gold heatmap as defined by Deep Sensing Geochemistry
(DSG) surface geochemistry across the main (undercover) project area, highlighting three of the four current focus prospect
areas; Coogan, Martin & Zahn. Red colours outline results above 6ppb Au. In the northeastern part of the project the
coloured stream sediment catchment areas highlight the new area of focus, Turner.
7
Authorised by the Board of Directors
ENDS
For further information contact:
INVESTORS:
MEDIA:
Derek Marshall
Nicholas Read
dmarshall@trekmetals.com.au
info@trekmetals.com.au
0419 929 046
JOIN TKM’S INTERACTIVE INVESTOR HUB
https://investorhub.trekmetals.com.au/welcome
Interact with Trek Metal’s announcements and updates by
asking questions and comments which our team can respond
to where possible
https://trekmetals.com.au/link/yEMVRy
COMPETENT PERSONS STATEMENT
The information in this report relating to Exploration Results is based on information compiled by the
Company’s Chief Executive Officer, Mr Derek Marshall, a Competent Person, and Member of the
Australian Institute of Geoscientists (AIG). Mr Marshall has sufficient experience relevant to the style
of mineralisation and to the type of activity described to qualify as a competent person as defined in
the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves.” Mr Marshall has disclosed that he holds fully paid Ordinary Shares and
Performance Rights in the Company. Mr Marshall consents to the inclusion in this announcement of
the matters based on his information in the form and content in which it appears.
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
This announcement contains forward looking statements. Forward looking statements are often, but
not always, identified A words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan",
"estimate", "expect" and "intend" and statements that an event or result "may", "will", "should",
"could" or "might" occur or be achieved and other similar expressions.
The forward-looking statements in this announcement are based on current expectations, estimates,
forecasts and projections about Trek and the industry in which it operates. They do, however, relate
to future matters and are subject to various inherent risks and uncertainties. Actual events or results
may differ materially from the events or results expressed or implied by any forward-looking
statements. The past performance of Trek is no guarantee of future performance.
None of Trek’s directors, officers, employees, agents or contractors makes any representation or
warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forwardlooking statement, or any events or results expressed or implied in any forward-looking statement,
except to the extent required by law. You are cautioned not to place undue reliance on any forwardlooking statement. The forward-looking statements in this announcement reflect views held only as
at the date of this announcement.
8
Table 1. Significant intercepts >1 gram metre relating to first batch of results for 2025 RC drilling at the Martin Prospect
using a >0.1g/t Au cut-off.
Hole ID
From
(m)
To
(m)
Interval
(m)
g/t Au
Gram
Metres
Significant Intercept
Prospect
Martin
Martin
Martin
Martin
Martin
Martin
Martin
Martin
25XCRC001
incl.
25XCRC002
25XCRC003
25XCRC003
25XCRC004
43
43
47
45
4
2
14.18
27.95
56.7
55.9
58
78
106
59
81
107
1
3
1
1.93
2.15
1.47
1.93
6.46
1.47
4m @ 14.18g/t Au from 43m
2m @ 27.95g/t Au from 43m
No significant intercept
1m @ 1.93g/t Au from 58m
3m @ 2.15g/t Au from 78m
1m @ 1.47g/t Au from 106m
25XCRC005
incl.
94
94
97
96
3
2
6.17
9.20
18.5
18.4
3m @ 6.17g/t Au from 94m
2m @ 9.20g/t Au from 94m
Table 2. Collar Table relating to first batch of results for 2025 RC drilling at the Christmas Creek Project
Hole ID
Type
Depth
Grid
North
East
RL
Dip
Azi
Survey
Lease ID
Prospect
25XCRC001
RC
143
MGA2020_52
7869595
272028
340
-60
180
GPS
E80/5083
Martin
25XCRC002
RC
197
MGA2020_52
7869605
272009
340
-55
180
GPS
E80/5083
Martin
25XCRC003
RC
143
MGA2020_52
7869579
271996
340
-57
180
GPS
E80/5083
Martin
25XCRC004
RC
203
MGA2020_52
7869573
272021
340
-57
175
GPS
E80/5083
Martin
25XCRC005
RC
144
MGA2020_52
7869612
272046
340
-55
180
GPS
E80/5083
Martin
9
JORC Table Section 1: Sampling Techniques and Data:
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Commentary
•
•
•
Logging
•
•
•
Sub-sampling
techniques
•
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
•
Reverse circulation (RC) drilling was used to obtain subsurface samples.
•
Drill cuttings were collected at 1m intervals down the length of each hole.
Sampling was completed from a gated cyclone over a static cone splitter into
a calico bag with a median sample weight of 2.24 kg per 1m sample. The
remainder of the drill cuttings were collected in a bucket and laid out in rows
of 20 on a sample pad beside the drill rig.
•
Individual samples were then composited from the spoil piles as described in
a subsequent section.
•
The sampling protocol is common practice for RC drilling and considered
appropriate for the stage of exploration.
•
Drill testing was undertaken by Reverse Circulation (RC) with face sampling
drill bit, drill cuttings are returned to surface via inner tubes in the drill string.
•
Drill bit diameter ranges depending on wear but is approximately 155mm.
•
Reverse Circulation drilling recoveries were good. Single metre primary
samples returned a median weight of 2.24kg.
•
Duplicate samples were collected from the rig every 50m, with duplicate pairs
being weighed to monitor the performance of the cyclone and cone splitter.
•
Sample recovery was consistent across the program with a single driller
operating the drill rig and maintaining constant drilling conditions with the
equipment, including monitoring bit wear, air return, and cyclone
performance.
•
A cone splitter was used on the drill rig which theoretically gives an even and
impartial split of the sample when operated correctly. Adjustable control gates
allow the sample size to be calibrated to suit the ground conditions and target
sample size. These measures are best practice in producing representative
samples.
•
There is no observed relationship between sample recovery and grade.
•
Chip trays have been collected for the entire length of each hole, logged,
and photographed.
•
Logging has been completed on all drill chips and is qualitative.
•
Logging covers the entire drilled length of each hole.
•
RC cuttings were collected during drilling as described above with the
primary bulk sample captured by bucket and placed in rows of 20 on the
ground immediately adjacent the drill rig.
10
Criteria
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
•
•
•
Verification of
sampling and
assaying
•
•
•
•
Location of
data points
•
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias)
and precision have been established.
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Commentary
•
All holes were sampled as 4m composites by the method described below.
•
From each primary sample pile, material for assay was collected with a
‘Fiskers nyglass potting scoop’ by rotary sampling, that is, starting at the
outside base of each pile, pushing toward the centre, then drawing up to the
peak, this ensures a representative sample is collected.
•
Field duplicates have been collected at each 50th sample interval to monitor
sample size and provide duplicate material for assay analysis and
representivity analysis.
•
The sample size and subsampling method is considered appropriate.
•
All drill samples were analysed by Australian Laboratory Services Pty Ltd
(ALS) in Western Australia for gold and multi‐element analysis (ME-MS61, &
Au-PA01).
ME-MS61 is a 4 acid, near total digest, reporting a suite of 48 elements.
Au-PA01 is a photon assay on a 500g crushed sample.
These techniques are considered appropriate for the elements of interest.
Appropriate standards were inserted at a frequency of one per 50 samples.
Duplicate samples were provided from either rig or field sampling at a rate of
every 50th sample.
ALS laboratory also inserted standards as internal checks.
All QAQC analyses of gold results are all within two standard deviations of
the CRM standard, and therefore acceptable limits.
•
•
•
•
•
•
•
•
Significant intercepts have been verified via internal review by Trek
geologists.
•
High grade intercepts reported for hole 24XCRC097 have been visually
confirmed through identification of visible gold in drill cuttings panned on site.
•
Further verification of the gold grade has been obtained by the use on an
onsite Portable PPB DetectOre laboratory, where the results received closely
matched to those reported by ALS laboratory from fire assay and photon
assay.
•
DDH1 has commenced drilling a twin hole of 24XCRC097, however it is
anticipated that the holes will likely deviate at different rates. The hole has
just commenced at the date of publication.
•
Field data is collected and logged into ruggedised Toughbook laptop by the
supervising geologist. Field data is routinely checked for accuracy and
completeness by the geologist, with further checks once the data is forwarded
to the database manager. Any errors or omissions reported by the database
manager are verified and corrected by the geologist with the corrected data
returned to the database manager for import and safe storage.
•
Data management consultants compile the data into a relational SQL
database, hosted in a secure data centre, which enforces data integrity and
ensures that the data meets the required validation protocols. Assay
certificates are loaded directly from the laboratory supplied files to the SQL
database, to prevent data transcription errors, with routine quality control
monitoring to ensure the accurate performance of the assay data.
•
No adjustments have been made to any assay data.
•
Location of drill collars were recorded using a handheld GPS which is
considered appropriate at this stage of exploration.
•
Grid projection system has been standardised in the database to GDA2020
11
Criteria
Data spacing
and
distribution
JORC Code explanation
• Quality and adequacy of topographic control.
•
•
•
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been
applied.
Commentary
MGA zone 52
•
Surface RL data is collected using GPS, which is then projected to an SRTM
DTM to improve accuracy. This is considered appropriate for this stage of
exploration.
•
Initial follow-up step-out holes around 24XCRC097 were 20m above, below,
along interpreted strike in both directions and a further step-out to the NE.
Drillhole spacing is considered appropriate for the stage of exploration.
Further drilling is required to establish continuity that may lead to the
estimation of a Mineral Resource. This large Martin Prospect is still
dominantly drilled on North-South drill line spacing of 250m with tighter
drilling only occurring in selected areas.
Sample compositing has been applied at the sampling stage as described
above.
Sample results have been composited as reported in the intercepts
•
•
•
Orientation of
data in
relation to
geological
structure
•
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
•
At this early stage of exploration, the exact influence of geological structure is
unknown. Downhole televiewer data from previous exploration has been used
to assist with structural interpretation. The results from these holes appear to
support a sub-vertical and SW-NE striking stacked vein / gold grade
distribution.
•
The recently commenced diamond drilling is designed to aid in structural
interpretation / determining the relationship between observed mineralisation
and geology / structure.
Sample
security
•
The measures taken to ensure sample
security.
•
Chain of custody is managed by the Company. Samples are freighted
directly to the laboratory with the appropriate documentation.
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
A review of all available information regarding the sampling techniques, data
and analytical methods has been undertaken by Trek and it is considered that
industry best practice methods have been employed at all stages of
exploration to date.
Reviews of legacy results have been completed in house by the previous
operator and by Trek prior to, and further upon acquisition of the project.
Recent data has been submitted to both internal review and discussions with
external consultants.
•
•
12
JORC Table Section 2: Reporting of Exploration Results:
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
JORC Code explanation
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and environmental
settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a license to operate in the area.
•
Acknowledgment and appraisal of exploration
by other parties.
Commentary
• The Project is located ~140 km south-west of Halls Creek in northern Western
Australia and comprises granted licences E80/4975, E80/5082, E80/5083,
E80/5427, E80/5914, E80/6010, and E80/6011, and two applications,
E80/6007 & E80/6012. All tenements are held by Archer X Pty Ltd.
•
Key terms for the 100% acquisition of Archer X Pty Ltd by Trek are outlined in
the ASX:TKM release dated 11/10/2023.
•
The Licences are located on Native Title determined land belonging to the YiMartuwarra Ngurrara in the West, and the Jaru people in the East. There is
no determined Native Title claim over the Zahn prospect in the southeast of
the Project.
•
Native title, heritage protection and mineral exploration agreements have
been entered into with the Jaru and Yi-Martuwarra Ngurrara Native Title
Holders and Newmont Exploration Pty Ltd and/or Archer X Pty Ltd. All
agreements are