Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Registered Offices – Trek Metals Limited – ARBN 124 462 826
Australia
Suite 5/2 Centro Avenue
Subiaco Western
Australia 6008
Bermuda
Vallis Building, 4th Floor
58 Par-la-Ville Road
Hamilton HM 11
Postal
PO Box 1696
Subiaco
WA 6904
Phone
08 6383 7844
Email
info@trekmetals.com.au
+
June 2026 Quarterly Activities Report
Maiden manganese drilling program commences at the Kuro discovery, with visual manganese*
logged across multiple locations – initial assays expected by early August
Highlights
Christmas Creek Manganese, Gold & Rare Earths Project, WA
• Maiden RC drill program commenced at the Kuro Manganese Discovery.
• Visual manganese* logged in 63 of the 72 holes completed in the initial phase of drilling.
• Drill samples dispatched for laboratory analysis, with initial results expected early August.
• Logging shows strong visual manganese mineralisation associated with Induced
Polarisation (IP) targets, validating IP as a highly effective targeting methodology.
• Given the strong positive correlation between IP chargeability anomalism and visual
manganese intercepts, the Company re-mobilised the IP crew to site to undertake
additional surveying to the south-east, east and west of existing drilling.
• RC drill rig currently testing prospective gold, copper-gold and REE (rare earth element)
soil anomalies before moving to the Coogan target. It will be redeployed to Kuro once
initial assays and further IP survey data are received.
Corporate
• Trek awarded two co-funded geophysical survey grants as part of the Western Australian
Government’s Exploration Incentive Scheme (EIS) for exploration at Christmas Creek:
o Ground gravity, primarily used to identify buried manganese mineralisation, will
extend the survey completed last year that defined large density features at the
Kuro Manganese Discovery.
o Sub-audio magnetics to define major structures controlling gold mineralisation at
the Martin Prospect, where drilling has intersected high-grade gold.
• Mr Tony Leibowitz retired as Chair and Director, succeeded by Mr Andrew Reece, a
significant shareholder who joined the Board in 2025 as part of a planned board succession
process.
• Cash position at 30 June 2026 of $14.32 million.
Cautionary Statement: * Visual estimates of mineral abundance should never be considered a
proxy or substitute for laboratory analyses where concentrations or grades are the factor of
principal economic interest. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations.
2
The visually observed manganese mineralisation is not representative of the entire Kuro
Prospect, with drilling currently on-going to further assess the distribution of manganese.
Representative drill samples are being routinely collected from the drill rig and will be analysed
at ALS laboratories and reported in due course (laboratory assay results are expected
progressively, with the first batch expected in 1-2 weeks, the second batch in 3-5 weeks and
the final Phase 1 batch in 4-6 weeks).
Overview
Trek Metals’ CEO Derek Marshall said the June Quarter marked a pivotal period for the Company, with
the commencement of the Company’s inaugural drilling program at the Kuro manganese discovery
within the Christmas Creek Project in the Kimberley region of Western Australia.
“It’s been a very busy and exciting period for Trek Metals, with our initial phase of RC drilling at Kuro
providing plenty of encouragement for the potential discovery of a new Woodie Woodie-style
manganese district in the Kimberley.
“While assay results are still awaited, visual analysis of the drill chips indicates broad zones of
manganese mineralisation across multiple areas, with this visual mineralisation showing a strong
correlation with chargeability anomalies generated by recent IP surveys. Most of the mineralisation
has been returned from under shallow cover, making IP surveys a highly effective tool for delineating
prospective zones.
“Initial assay results are expected in the next few weeks, and in the interim, we have remobilised the
IP survey crew to site to extend coverage to the southeast, east and west of existing drilling.
“The drill rig has now moved to test other targets, including a high-priority IP target at Coogan, and
will return to Kuro for further drilling as soon as all assay and IP results have been received and
interpreted.
“On the corporate front, Tony Leibowitz stepped down as Chair and Director of the Company during
the Quarter as part of a planned board succession process, with Tony succeeded by Andrew Reece.
Tony has made a strong contribution to the Company over the past six years, and we wish him all the
best for the future. I would also like to acknowledge the outstanding support I have received from
Andrew since becoming Chairman. Andrew spent the first two weeks of our drill campaign on site
working alongside and supporting the team, and along with the rest of the board has provided
excellent advice and encouragement during this pivotal first phase of drilling.”
Christmas Creek Project (Kimberley, Western Australia)
Located south-west of Halls Creek, the Christmas Creek Project comprises a previously unexplored,
largely concealed district-scale exploration opportunity in the Kimberley region of WA associated with
major continental-scale tectonic lineament intersections (Figure 1). Trek completed the acquisition of
the Christmas Creek Project which was previously part of Newmont Exploration Pty Ltd’s (Newmont)
global exploration portfolio in late 2023 and has since secured additional tenement applications to
expand its tenure.
Exploration at the Christmas Creek Project has identified manganese mineralisation at surface at the
Kuro Prospect, with maiden RC drilling now confirming the presence of visual manganese mineralisation
across multiple locations and assay results pending. The broader Project also offers outstanding
prospectivity for gold, base metals and rare earth mineralisation.
3
Figure 1: Continental-scale context and location map for the Christmas Creek Project, located at the intersection of G3 and G5
metallogenic lineament corridors, potentially representing the intersection of the Granites-Tanami Orogen & the Halls Creek
Orogen.
During the Quarter, Trek continued to unlock a potentially significant manganese discovery at the Kuro
Prospect at Christmas Creek.
Geophysical Surveys
Geophysical surveys were undertaken across the Kuro area during the Quarter, comprising Induced
Polarisation surveying by Moombarriga Geoscience and extensional ground gravity surveying by Atlas
Geophysics.
Maiden Drilling Program
Trek Metals commenced its maiden manganese-focused drilling campaign at the Kuro discovery in mid-
June, with the 72-hole Reverse Circulation (RC) program completed subsequent to Quarter-end.
Visual manganese* mineralisation (with ≥10% observed interpreted Mn) was logged in 63 holes out of
the 72 holes drilled to date across multiple locations, with initial assay results expected in early August.
Throughout the drilling program, visual analysis of the drill chips has indicated a positive correlation
between the recently acquired IP chargeability anomalism and visual manganese intercepts. This
demonstrates that IP can locate concealed manganese beneath cover at Kuro, opening the way to
systematically explore a much larger prospective basin.
Significant visual manganese mineralisation* intersected in the drilling includes:
• 18 metres of visual massive and semi-massive manganese from 19m down-hole in drill-hole
26XCRC015.
4
• 17 metres of visual massive and semi-massive manganese from 9m down-hole in drill-hole
26XCRC014, within a broader zone of 27 metres from 2m down-hole.
• 16 metres of visual massive and semi-massive manganese from 13m down-hole in drill-hole
26XCRC020, within a broader zone of 17 metres from 12m down-hole.
• 15 metres of visual massive and semi-massive manganese from 11m down-hole in drill-hole
26XCRC051, within a broader zone of 21 metres from 10m down-hole.
• 14 metres of visual massive and semi-massive manganese from 6m down-hole in drill-hole
26XCRC059.
• 11 metres of visual massive manganese from 5m down-hole in drill-hole 26XCRC018, within a
broader zone of 17 metres from 3m down-hole.
• 11 metres of visual semi-massive manganese from 17m down-hole in drill-hole 26XCRC039, within
a broader zone of 14 metres from 14m down-hole.
• 10 metres of visual massive and semi-massive manganese from 2m down-hole in drill-hole
26XCRC064, within a broader zone of 16 metres from 2m down-hole.
• 8 metres of visual massive and semi-massive manganese from 7m down-hole in drill-hole
26XCRC026, within a broader zone of 15 metres from 6m down-hole.
• 8 metres of visual massive manganese from 8m down-hole in drill-hole 26XCRC016, within a broader
zone of 10 metres from 6m down-hole.
• 6 metres of visual massive manganese from surface in drill-hole 26XCRC006, within a broader zone
of 25 metres from surface.
• 6 metres of visual massive and semi-massive manganese from surface in drill-hole 26XCRC019, and
4 metres of visual semi-massive manganese from 36m down-hole.
• 4 metres of visual semi-massive manganese from 21m down-hole in drill-hole 26XCRC021, within a
broader zone of 14 metres from 14m down-hole
• 3 metres of visual semi-massive manganese from 9m down-hole in drill-hole 26XCRC017
Further information on the visual manganese results is available from the Company’s ASX
Announcements dated 29 June 2026, 6 July 2026 and 23 July 2026.
Notably, all the IP targets are under shallow sand cover with no surface manganese expression. Having
a drill targeting technique that effectively pinpoints significant manganese undercover is therefore
considered to be a pivotal moment for the Company in advancing the Kuro manganese discovery.
The Moombarriga IP crew re-mobilised to site on 3 July 2026 and has since completed additional
Gradient Array Induced Polarisation (GAIP) surveying to the south-west of the Kuro Manganese
Discovery and is now continuing this surveying to the north-west of the discovery area, before moving
on to the interpreted south-eastern extension area.
*Readers are reminded that Visual estimates of mineral abundance should never be considered a proxy
or substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
5
Figure 2: Plan view of Kuro, Gradient Array Induced Polarisation (GAIP) Chargeability anomalism shown as full-colour
background with contour lines (white-red hot indicative of highly chargeable zones), manganese outcrop as grey polygons
with black outlines, and completed Reverse Circulation drill-holes with hole ID and total visual massive and semi-massive
manganese intercepts labelled.
Figure 3: Long Section Line 1, along the main (southern) chargeability anomaly along strike from the main manganese
outcrop, showing interpreted geology, highlighting the ~400m strike of visual manganese mineralisation in black. Significant
visual intercepts (≥10m of massive to semi-massive manganese) as individual callouts. Cross-section Line 1 location also
shown. Long section line location shown in Figure 2.
6
Figure 4: Long Section Line 2, along the northern chargeability anomaly, showing interpreted geology, highlighting the ~300m
and 150m strike of visual manganese mineralisation in black. Significant visual intercepts (≥10m of massive to semi-massive
manganese) as individual callouts. Cross-section Line 1 location also shown. Long section line location shown in Figure 2.
Figure 5: Cross Section Line linking the two Long Sections (Figure 3 & Figure 4) showing interpreted geology, highlighting the
apparent ~50m widths of visual manganese mineralisation in black of the two pods. Significant visual intercepts (≥10m of
massive to semi-massive manganese) as individual callouts. Long-section Line 1 and Line 2 locations also shown. Cross section
line location shown in Figure 2.
7
Figure 6: Preliminary Merged Residual Gravity imagery showing an interpreted ~16km long prospective Neoproterozoic basin
hosting the Kuro manganese discovery outlined in white, highlighting the interpreted basin boundary and target stratigraphy
within, the existing Kuro IP and drill area in the east and the target areas for the current round of IP surveying.
Coogan Gold-Copper Prospect
The Coogan Gold-Copper Prospect is located within Trek Metals’ Christmas Creek Project, approximately
7km NW from the Kuro Manganese Prospect.
An independent soil and drill geochemistry review completed in 2025 identified Coogan as a standout
target within the Project, with both drilling and soil sampling defining a robust, coherent mineralised
footprint of more than 1km2. The geochemistry defined a core of Au-Cu-Bi-Se-Te-Mo-W, surrounded
by a halo of Pb-Zn-Ag-Cd-In (https://trekmetals.com.au/announcements/7075982).
At the completion of the first round of Induced Polarisation (IP) surveying at Kuro, the Moombarriga IP
team completed two Dipole-Dipole Induced Polarisation (DDIP) lines across the main Coogan
mineralised trend. The survey was designed to test for the presence of disseminated to semi-massive
sulphide mineralisation beneath and/or adjacent to existing drilling.
Previous Coogan drillhole NEWXCRC031 intersected a strong, persistent sulfidic (S) zone from ~100m to
end-of-hole. This is consistent with an IP chargeability anomaly driven by disseminated and/or semi-
massive sulphide at depth.
There is a standout section at 98-100m down-hole with 657 ppm Cu, 619 ppm Zn, 87.6 ppm Pb, 1.22
ppm Ag, 38.5 ppm As and 7 ppb Au, all coinciding with 6,000 ppm S. Molybdenum (Mo) exceeds 2ppm
from 96m, with a late peak of 11ppm at 202-204m.
The strongest multi-element correlations with sulphur down-hole are Te, Se and Ag, together with Fe
(consistent with pyrite/pyrrhotite) and pathfinder elements Tl and P.
8
This Te-Se-Ag-S association, combined with the Cu-Zn-Pb-Ag-As metal suite at 98-132m and the
persistent, deepening Mo enrichment, is consistent with the top of a mineralised system with a
polymetallic, sulphide-rich cap. The deepening Mo trend suggests the system may strengthen at depth
below the current hole.
Figure 7: Coogan Cu-Au DDIP (Dipole-Dipole Induced Polarization) chargeability inversion model cross section image, showing
previous drilling with downhole traces coloured by Molybdenum (Mo) and proposed drill traces in black.
The resulting chargeability inversion model (Figure 7) from the recent DDIP surveying defined a
coherent, moderate-to-strong chargeability anomaly that directly underlies and extends beyond the
mineralised and sulphide-bearing intercepts logged in previous drilling, including NEWXCRC031. The
anomaly remains open at depth and along strike.
A program of four holes for 1,480m has been planned to test the newly identified chargeability anomaly,
with priority given to holes targeting the depth extensions below the existing drilling where
molybdenum enrichment and chargeability response both suggest the system may be centred
(Figure 67, proposed drill traces).
McEwen Hills Niobium Project (West Arunta, Northern Territory)
Trek secured the highly prospective McEwen Hills Niobium Project in late 2023, located in the heart of
the West Arunta Critical Minerals Province.
The continued success of WA1 Resources in defining the scale of their Luni Niobium discovery along
strike from Trek’s McEwen Hills Project highlights the potential of the province, and more recently
Encounter Resources have also been having exploration success in the region.
9
Figure 8: Magnetic imagery highlighting the continuity of the geology across the state border, with the Luni & Crean Nb
carbonatite discoveries of WA1 & ENR on the Western Australian side, and Trek’s McEwen Hills Project (ELA33191) on the
Northern Territory side, of the West Arunta Critical Minerals Province.
The tenement application area is located within freehold aboriginal lands of the Lake MacKay Aboriginal
Land Trust and is administered by the Central Land Council. Access and exploration for gold has
previously been completed by Tanami Gold NL, Normandy Gold Exploration (later Newmont) and ABM
Resources, so there is a precedent for access to the land.
Trek attended an on-country meeting with the Traditional Owners of the land underlaying its tenement
application ELA33191 in May 2024. Meeting members of the Lake MacKay Aboriginal Land Trust in
Nyirripi, Northern Territory, represents an important step in the negotiation process and is essential for
the grant of the tenement to occur. The Company is negotiating an access agreement with the Central
Land Council.
Jimblebar Nickel-Copper-PGE Project (Pilbara, Western Australia)
DevEx Resources (ASX: DEV) (“DevEx”) is exploring the Jimblebar Project as part of an Earn-in Agreement
with Trek (Refer ASX Release 11 June 2024). DevEx subsidiary Green Critical Resources Pty Ltd (GCR) has
exercised the Earn-In option for a 75% Joint Venture (“JV”) interest by sole funding exploration
expenditure of not less than A$3,000,000 on the Tenements within 5 years. If GCR earns its 75% JV
interest, Trek will be free carried for its share of JV expenditure until the completion of a Bankable
Feasibility Study.
The project comprises over 200km2
of granted tenements adjacent to known occurrences of copper
sulphide mineralisation at the Copper Knob prospect and chromite at the historical Coobina chromite
mine, on the northern margin of the Silvania Dome in Western Australia.
CORPORATE
Chair Succession
Mr Tony Leibowitz tendered his resignation as Chairman and Director, effective 30 April 2026. Mr
Leibowitz has been succeeded by Mr Andrew Reece, a significant shareholder who joined the board as
a non-executive Director last year, as part of a planned board succession process.
Mr Leibowitz has served on the Trek Metals Board since 4 September 2020 and has made a significant
contribution to the Company’s development.
10
Mr Reece is a prominent and highly successful Queensland-based mining investor and businessman with
a strong track record of establishing and building high-performing businesses. Mr Reece brings extensive
commercial and executive leadership experience, including co-founding Inspect Real Estate and serving
as its Chief Executive Officer, leading it through to its acquisition by US private equity firm Accel-KKR.
Appointment of Exploration Manager
During the Quarter, Trek appointed highly experienced geologist, Fred Paulus, as Exploration Manager.
Mr Paulus has over 15 years’ experience across Canada and Australia, with a career spanning greenfield
exploration through to large-scale JORC Resource definition.
Most recently, Mr Paulus held senior roles at Fortescue and Rio Tinto Iron Ore, directly contributing to
the delineation of more than one billion tonnes of iron ore resources across the Hamersley Basin. Mr
Paulus’ experience will be directly applicable to Trek’s growth ambitions following the recent discovery
of high-grade manganese at surface at Christmas Creek.
EIS Geophysical Grants
Trek was awarded two co-funded geophysical survey grants valued at up to $188,000 as part of the
Western Australian Government’s Exploration Incentive Scheme (EIS) for exploration at Christmas
Creek:
• Ground gravity, primarily used to identify buried manganese mineralisation, will extend the
survey completed last year that defined large density features at the Kuro Manganese
Discovery.
• Sub-audio magnetics has been selected to define major structures controlling gold
mineralisation at the Martin Prospect, where drilling has intersected high-grade gold.
Sale of Pincunah Project
During the quarter, the Company completed the sale of the Pincunah project to Pilbara Gold Limited
(formerly Kairos Minerals Limited) (PGL). The tenements that were sold are: E45/4640, E45/4909,
E45/4917, E45/6664 and E45/6240 (application).
On completion, Trek received:
• $100,000 in cash;
• 173,161 fully paid ordinary shares in Pilbara Gold Limited; and
• 346,322 performance rights in Pilbara Gold Limited with a five-year term, which vest upon
Pilbara Gold Limited announcing a Mineral Resource estimate, reported in accordance with
the JORC Code, of at least 50,000 ounces of gold at a grade of at least 1 g/t Au and classified
as Inferred or higher.
Cash Position/Expenditure
The Company held cash reserves of $14.32 million at the end of the quarter (Refer Appendix 5B).
During the Quarter, the Company incurred approximately $1.19 million in exploration and evaluation
expenditure, as reported in item 1.2(a) of the Appendix 5B. Expenditure primarily related to drilling,
earthworks, geological activities, geophysical surveys, assaying and heritage activities at the Christmas
Creek Project.
11
In addition, the Company made payments of $0.278 million for plant and equipment including an
exploration motor vehicle and caravan. Further details of the exploration activities undertaken during
the quarter are set out in this report.
Payments to Related Parties (Appendix 5B)
During the Quarter, the Company made payments of approximately $86,000 to related parties and their
associates, comprising non-executive Director fees, Director consulting fees and associated
superannuation, in accordance with existing remuneration arrangements
Authorised by the Board of Directors
ENDS
For further information contact:
INVESTORS: MEDIA:
Derek Marshall Nicholas Read
dmarshall@trekmetals.com.au info@trekmetals.com.au 0419 929 046
Competent Persons Statement
The information in this report relating to Exploration Results is based on information compiled by the
Company’s Chief Executive Officer, Mr Derek Marshall, a Competent Person and Member of the
Australian Institute of Geoscientists (AIG). Mr Marshall has sufficient experience relevant to the style of
mineralisation and to the type of activity described to qualify as a competent person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves.” Mr Marshall has disclosed that he holds Ordinary shares and Performance Rights in the
Company. Mr Marshall consents to the inclusion in this announcement of the matters based on his
information in the form and content in which it appears.
12
Specific Exploration results referred to in this report were originally reported in the following Company
announcements.
Title Date
IP Drilling Validates Concealed Manganese Targeting at Kuro
https://trekmetals.com.au/announcements/7646589
23 July 2026
Drilling Continues to Intersect Mineralisation at Kuro
https://trekmetals.com.au/announcements/7618301
6 July 2026
Multiple Mineralised Zones Intersected at Kuro
https://trekmetals.com.au/announcements/7604907
29 June 2026
Kuro IP Survey planned, RC Drill contract and assay results
https://trekmetals.com.au/announcements/7467887
30 March 2026
Petrophysics Confirms Geophysical Response from Kuro Rock Chips, IP Survey
Planned and RC Drill Contract Awarded
https://trekmetals.com.au/announcements/7457333
23 March 2026
Outstanding New High-Grade Manganese Rock Chip Results at the Kuro Prospect -
Christmas Creek Project, WA
https://trekmetals.com.au/announcements/7326226
19 January 2026
High-Grade Manganese Discovery at Christmas Creek Strengthened by Extensive,
Strong Gravity Anomalies
https://trekmetals.com.au/announcements/7311646
15 December 2025
Trek to accelerate exploration at new High-Grade Manganese Discovery at
Christmas Creek Project, WA
https://trekmetals.com.au/announcements/7263873
17 November 2025
Exceptionally High-Grade Manganese Discovery at Christmas Creek Project, WA
https://trekmetals.com.au/announcements/7259499
13 November 2025
Discovery focused drilling gains momentum on several fronts
https://trekmetals.com.au/announcements/7075982
29 July 2025
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original announcements and that all material assumptions and technical parameters underpinning
the exploration results continue to apply and have not materially changed.
13
Tenement Schedule/Movements (ASX Listing Rule 5.3.3)
Tenement Location Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
E45/4909 Western Australia ACME Pilbara Pty Ltd 100% 0%
E45/4917 Western Australia ACME Pilbara Pty Ltd 100% 0%
E45/4640 Western Australia ACME Pilbara Pty Ltd 100% 0%
E45/6240 (application) Western Australia ACME Pilbara Pty Ltd 100% 0%
E45/6664 Western Australia ACME Pilbara Pty Ltd 100% 0%
E45/7231 (application) Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/5484 Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/5839 Western Australia ACME Pilbara Pty Ltd 100% 100%
P45/3244 (application) Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/3605*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/3672*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/3983*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/4051*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E70/6000
(surrendered)
Western Australia ANAHEIM Pty Ltd
100% 0%
E70/6001 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6004 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6072 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6690 Western Australia ANAHEIM Pty Ltd 100% 100%
E80/4975 Western Australia Archer X Pty Ltd 100% 100%
E80/5082 Western Australia Archer X Pty Ltd 100% 100%
E80/5083 Western Australia Archer X Pty Ltd 100% 100%
E80/5427 Western Australia Archer X Pty Ltd 100% 100%
E80/5914 Western Australia Archer X Pty Ltd 100% 100%
E80/6007 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6010 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6011 Western Australia Archer X Pty Ltd 100% 100%
E80/6012 Western Australia Archer X Pty Ltd 100% 100%
E80/6211 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6212 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6213 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6214 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6215 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6216 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6217 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6218 (application) Western Australia Archer X Pty Ltd 100% 100%
14
Tenement Location Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
E80/6219 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6220 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6221 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6222 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6254 (application) Western Australia Archer X Pty Ltd 0% 100%
EL31260*
(application) Northern Territory TM Resources Pty Ltd 100% 100%
EL31261*
(application) Northern Territory TM Resources Pty Ltd 100% 100%
EL31751*
(application) Northern Territory TM Resources Pty Ltd 100% 100%
EL31752*
(application) Northern Territory TM Resources Pty Ltd 100% 100%
EL 33191 (application) Northern Territory ELM Resources Pty Ltd 80% 80%
EL 34052 (application) Northern Territory ELM Resources Pty Ltd 80% 80%
EL 34447 (application) Northern Territory ELM Resources Pty Ltd 0% 100%
Note: ACME Pilbara Pty Ltd, TM Resources Pty Ltd, Archer X Pty Ltd, ELM Resources Pty Ltd and Anaheim Pty
Ltd are all wholly owned subsidiaries of Trek Metals Limited.
*Subject to Earn-in agreements
Mining tenements acquired or disposed during the Quarter
Tenement applications during the Quarter
E80/6254
EL 34447
Tenements disposed of during the Quarter
E45/4909 Sold
E45/4917 Sold
E45/4640 Sold
E45/6240 (application) Sold
E45/6664 Sold
E70/6000 Surrendered
Details of Farm-in or Farm-out agreements entered into during the Quarter
- Nil
Beneficial Percentage Interests Held in Farm-In or Farm-Out Agreements at the end of the Quarter
As per the table above.
Mining Production and Development Activities
There were no mining production and development activities during the quarter.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TREK METALS LIMITED
ARBN Quarter ended (“current quarter”)
124 462 826 30 JUNE 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (164) (164)
(e) administration and corporate costs (179) (179)
1.3 Dividends received (see note 3) - -
1.4 Interest received 152 152
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material)
GST (net)
-
(26)
-
(26)
1.9 Net cash from / (used in) operating
activities
(217) (217)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements (17) (17)
(c) property, plant and equipment (278) (278)
(d) exploration & evaluation (1,193) (1,193)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements 100 100
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Divid
Share your feedback
Discover