Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
September 2024 Quarterly Activities Report
Maiden 8,437m Reverse Circulation / Air Core drill program completed targeting gold and rare
earths mineralisation at the Christmas Creek Project in WA’s Kimberley region – assays
awaited; Option Agreement signed to divest the Hendeka Manganese Project
Highlights
Christmas Creek Gold & Rare Earths Project, WA:
•
Maiden 8,437m combined Reverse Circulation (RC) & Air Core (AC) drill program
completed targeting gold and rare earths mineralisation, covering:
o
Four high-priority gold prospects – Coogan, Martin, Zahn and Willis; and
o
One REE/Niobium target along strike from the Cummins Range REE Deposit.
•
All drill samples from the drilling program were logged, collected and dispatched for assay
during the quarter, with results expected to be received in early November.
•
A large soil sampling program of over 1,300 samples was completed targeting extension
and infill to previously defined anomalies. Results expected in early November.
•
Heritage clearance completed at Price with the Jaru, paving the way to drill testing this
high priority carbonatite REE target.
McEwen Hills Niobium Project, NT
•
Airborne magnetic-radiometric survey completed with support from the Northern
Territory Geophysics and Drilling Collaborations (GDC) Program.
Jimblebar Ni-Cu-PGE Project, WA
•
Large ground electromagnetic survey underway via Earn-In partnership with DevEx.
Other Projects
•
Option Agreement signed to divest the Hendeka Manganese Project in WA’s Pilbara to
Advanced Energy Fuels, Inc. Transaction will allow Trek to focus on its flagship gold and
niobium projects in WA and the NT, while retaining exposure to future upside at Hendeka.
•
Strategic review of Trek’s significant project portfolio (lithium, base metals) continuing,
including joint venture arrangements and/or potential divestment.
Corporate
•
Cash position at 30 September 2024 of $2.84 million.
Overview
Trek Metals’ CEO Derek Marshall said the September Quarter had been an exceptionally busy and
exciting period for the Company, with its maiden drilling campaign successfully completed to test
multiple gold and rare earths targets at the Christmas Creek Project in WA’s Kimberley region.
“Our focus throughout the September Quarter has been squarely on Christmas Creek, where
fieldwork programs including soil sampling and heritage surveys early in the Quarter laid the
foundations for our inaugural drilling program, which commenced in early August.
“This program tested a series of high-priority gold and rare earths targets, including the Martin
prospect, where previous drilling by Newmont returned significant high-grade intercepts, and
the Coogan prospect, a large, well-defined gold mineralised system that has only previously been
tested with wide-spaced drilling.
“Assay results from this program are eagerly awaited and expected to be received in early
November. We look forward to updating the market as soon as possible.
“Post drilling, we also completed a heritage clearance survey with the Jaru over our high priority
Price target, which is interpreted to represent a rare earth (REE) mineralised carbonatite dyke in
close proximity to the Cummins Range REE Deposit. This clearance paves the way to future drill
testing of this exciting target.
“Our Earn-In Agreement partner at the Jimblebar Ni-Cu-PGE Project, DevEx Resources Limited,
are busy undertaking a large high-powered ground electromagnetic (EM) survey. This is the first
systematic EM of the belt utilising modern technology with GEM Geophysics using the lowtemperature SQUID sensor. We know this is a fertile belt with proven Ni-Cu sulphide
mineralisation and look forward to seeing the results of this work. We wish DevEx the best of
luck and remind Trek shareholders that we retain a 25% free carry position through to delivery
of a Feasibility study at Jimblebar.
“During the September Quarter, we were also pleased to secure an Option Agreement to divest
our Hendeka Manganese Project to Advanced Energy Fuels, Inc. Hendeka is a non-core asset for
Trek, and this agreement allows us to realise value for shareholders, if the option is exercised,
we will retain significant exposure to future exploration and development upside via a 20 per
cent shareholding.”
Christmas Creek Project (Kimberley, Western Australia)
Located south-west of Halls Creek, the Christmas Creek Project comprises a previously unexplored,
largely concealed district-scale gold and rare earths exploration opportunity in the Kimberley region
of WA associated with major continental-scale tectonic lineament intersections (Figure 1).
Trek completed the acquisition of the Christmas Creek Project, which was previously part of Newmont
Exploration Pty Ltd’s (Newmont) global exploration portfolio, in the December 2023 Quarter. The
Company has also secured additional tenement applications to add to this district-scale greenfields
gold and rare earths exploration project.
During the Quarter, Trek completed an extensive 8,437m Reverse Circulation (RC) & Air Core (AC)
drilling program at Christmas Creek, targeting gold and rare earths mineralisation (Figure 2). Assay
results from the program are expected to be received in November.
2
Figure 1: Continental scale context and location map for the Christmas Creek Project, located at the intersection of G3 and
G5 metallogenic lineament corridors, potentially representing the intersection of the Granites-Tanami Orogen & the Halls
Creek Orogen.
Figure 2: Drilling in action at the Christmas Creek Project. Impact Drilling’s slim-line RC rig at the Martin Prospect in August.
3
Since acquiring the project in late 2023, Trek has completed the acquisition and merging of all legacy
exploration data, re-processing of geophysical data sets, heritage and environmental approvals,
completed a targeted soil sampling campaign, and completed a large drilling program. The attributes
that attracted Trek to the project initially have been reinforced as the Company’s understanding of
the data and the potential of the project has grown.
The previous project operator, Newmont, used Deep Sensing Geochemistry (DSG) technology – a
highly sensitive geochemical low detection limit surface sample assay technique – which has allowed
the Company to identify buried mineralisation that may prove to be economic with drilling.
Due to the ultrafine grainsize of the assayed sample, DSG results are low in absolute terms, so it is the
relative strength of the elements and multiple-element associations that are critical. Figure 3
highlights the success of the DSG methodology, where the drilling at a limited number of targets has
demonstrated gold mineralisation at depth, and Trek’s objective for the current field season is to
demonstrate continuity of the mineralisation, locate areas of increased grade, and expand the number
of targets for future exploration.
The tenement package is a large area that is under-explored, mainly due to the geology being obscured
by recent shallow sand cover. An overview of each target for the 2024 drilling program is provided
below.
Figure 3: Gold heatmap as defined by Deep Sensing Geochemistry (DSG) surface geochemistry across the project area,
highlighting the four main prospect areas – Coogan, Martin, Zahn & Willis – all with drilling completed this year (assays
pending). Red colours outline results above 6ppb Au.
4
Coogan
Coogan is a gold-rich mineral system defined over >1 km of strike. Unlike other prospects within the
Project, Coogan is in an area of exposed Paleoproterozoic rocks.
Coogan has both a surface geochemical anomaly and locally outcropping quartz veining where rock
chip sampling has returned values of up to 3.46g/t Au.
RC drilling of two traverses located approximately 1km apart (Figure 3), at either end of the
geochemical soil anomaly, was completed by Newmont. Initial drilling has defined a coherent, steepdipping, gold-mineralised structure with intersections such as 34m @ 0.18g/t Au and 38m @ 0.16g/t
Au.
Hosting the mineralisation is a structure interpreted to represent a curvi-planar shear zone. It is
generally well understood that economic mineralisation hosted by such structures tends to occur in
discrete plunging shoots that may have relatively limited strike extent. Given the wide line spacing of
the initial drilling at Coogan, and the limited extent of drilling across the target structure, Trek believes
that there is significant scope for Coogan to host a potentially economic orebody and is therefore an
attractive target for follow-up exploration, especially given that the strongest, central part of the
anomaly is untested by drilling.
Because the two legacy drill traverses are located at either end of the geochemical anomaly, they have
not tested the central core of the prospect which has the highest values from the surface soil and rock
chip sampling. This central zone also appears to be associated with a favourable deflection in the trend
of the host structure as interpreted in geophysical datasets.
Figure 4: Coogan prospect outlined by surface geochemistry, background image is DSG Au heat map. A single long central
line was drilled with results currently pending.
5
A single line was completed to test the centre of the geochemical anomaly and extended to test the
margins of the anomaly against large scale interpreted faults (Figure 3).
The heatmap displayed in Figure 3 shows gold values derived using the DSG technique. As described
above, this assay protocol produces low absolute values relative to other sampling methods, however
the relative abundance is the important factor, and the ability to ‘see’ deeper into the sub-surface.
Red colours outline results about 6ppb Au, with the dark blue representing background at 0 – 1ppb.
Zahn
Zahn is a large (>2km across), surface DSG Au anomaly in an area of thin cover. It stands out in that
has the strongest amplitude of any DSG gold anomaly in the project area but remains unexplained by
limited broad-spaced drill testing.
After the initial drill programs, further soil sampling has been completed at Zahn. Analysis of the recent
surface results highlight an area immediately north of the drilled area with strong gold and pathfinder
element anomalism (Figure 5). Pathfinder elements have been determined by comparison between
surface geochemistry and drilling data, where the elements Au, As, and W show the strongest
correlation. The untested geochemical anomalism sits over features in the magnetic data that have a
strong visual correlation, and this coincident geochemical and magnetic feature defines the target of
drilling in the current program. The magnetic boundary also marks the edge of a gravity high, with the
interpretation of the gold sitting in a major structure at a geological domain boundary.
Figure 5: The untested new drill target area identified immediately north of previous drill area via an extensional postdrilling soil sample program is the priority target at Zahn. Coloured imagery is contoured DSG Au results over magnetics
with legacy drilling and completed 2024 drilling outlined as blue boxes.
6
Four lines of RC drilling were completed to cover the target as shown in Figure 5 above, all sitting north
of the previously defined target at Zahn.
Martin
Martin is a very large, 4km diameter DSG Au anomaly under thin cover (Figure 6).
RC drilling at Martin is restricted to three sections in the central part of the anomaly. Significant
mineralisation was intersected on each section, including 7m at 4.9g/t Au (including 1m at 29.6g/t Au)
from 24m in hole NEWXCAC196, 2m @ 9.65g/t Au from 72m in NEWXCRC012 and 4m @ 3.27g/t Au
from 136m in NEWXCRC015.
The deeper intersection of 2m @ 9.65g/t Au in NEWXCRC0121 was obtained in the southern-most
hole of its drill section and is open in all directions. In addition to the high-grade zones noted here,
other gold-anomalous intersections were obtained. Mineralisation is associated with multiple zones
of quartz veining, but there is insufficient data to form a coherent understanding of their structural
control.
In magnetic geophysical images Martin stands out by having a reduced and diffuse magnetic response,
where it is surrounded by discrete strong magnetic features. Interpretation of the subdued magnetic
response in correlation with gold anomaly is that it is due to an alteration system that is likely
responsible for the gold mineralisation.
Figure 6: Martin Prospect with contoured surface geochemistry and legacy drilling highlights. Outlined in blue are the
completed drill lines following up high-grade intercepts and extending drilled footprint of the discovered mineralisation.
7
Drilling in 2024 was planned to expand the footprint of the basement-hosted mineralisation and
provide further information to assist in the interpretation of the structural controls on the mineralised
quartz veins. Results are currently pending.
Willis
Willis is a large coherent gold geochemical anomaly in an area of thin cover of a monotonous sand
plain. In-fill DSG sampling completed in 2022 has confirmed a large 3 x 1.5 km anomaly, with a central
coherent core of 1.5km in length. Gold anomalism is higher than at Martin and Coogan, where, as
outlined above, gold mineralisation has been confirmed by drilling. Importantly, the strongest part of
the gold anomaly is also coincident with highly elevate Bi and As, as in the case of Coogan, a direct
relationship between Bi and Au was observed in the mineralised zone.
No previous drilling had been conducted at Willis. One line of RC drilling was completed (Figure 7),
with additional contingent lines planned for follow-up drilling if results warrant.
Figure 7: Willis completed drilling over contoured, coherent, DSG Au surface geochemistry.
Zahn South – Rare Earth Elements
Being located adjacent to RareX’s (ASX: REE) Cummins Range critical metals project, which has a
significant phosphorous and REE resource, the Christmas Creek Project has also been assessed for
similar carbonatite-hosted mineralisation. Within existing geochemical data, a coherent anomaly of a
limited REE assay suite has been identified to the south of the Zahn gold target, 13km west of the
Cummins Range deposit. Comprising elevated Ce + La + Y, the Zahn South target is a large (2.7km x
900m) elongate ENE trending geochemical anomaly, that requires further investigation.
8
To test the Zahn South REE anomaly, a single line of AC drilling was completed, with the samples being
subjected to an appropriate assay method to detect the full suite of REE and niobium. Six holes were
completed to cross the anomaly and provide sufficient sub-surface data to determine future steps at
this intriguing target.
Figure 8: Zahn South target based on La+Ce+Y REE assay results from DSG soil sampling, with coloured heat map of LaCeY
and completed drill line as a blue box.
Soil Sampling
During the quarter a large soil sampling program was completed by contractor OZEX Pty Ltd (Figure
9). Soil sampling is being completed to strengthen existing targets and generate additional targets for
further exploration. Targets fall into two broad categories – follow-up or in-fill sampling around
previously recorded anomalous results; and areas where no previous sampling is recorded but where
there are features of interest in the geophysical data.
Heritage Survey
A heritage clearance survey was completed during the quarter with representatives from the Jaru. The
survey covered a high priority magnetic feature (Figure 10) which is interpreted to represent a
mineralised carbonatite intrusive. Trek also completed soil sampling over this target (results currently
pending).
9
Figure 9: The OZEX crew collecting an infill soil sample at Christmas Creek during this field season.
Figure 10: CRA Exploration magnetic contour map of the Cummins Range Project from its 1980 annual exploration report,
WAMEX a10497. Note the overlapping Price base metal and B153 REE anomalies and the magnetic trend towards the
highly magnetic Cummins Range REE deposit. This area was subject to a heritage clearance survey during the quarter.
10
McEwen Hills Niobium Project (West Arunta, Northern Territory)
Trek secured the highly prospective McEwen Hills Niobium Project during the September 2023
Quarter, located in the heart of the West Arunta Critical Minerals Province (Figure 11). The continued
success of WA1 Resources in defining the scale of their Luni Niobium discovery along strike from Trek’s
McEwen Hills Project highlights the potential of the province.
Trek attended an on-country meeting with the Traditional Owners of the land underlaying its
tenement application ELA33191 in May. Meeting members of the Lake MacKay Aboriginal Land Trust
in Nyirripi, Northern Territory, represents an important step in the negotiation process and is essential
for the grant of the tenement to occur.
The tenement application area is located within freehold aboriginal lands of the Lake MacKay
Aboriginal Land Trust and is administered by the Central Land Council. Access and exploration for gold
has previously been completed by Tanami Gold NL, Normandy Gold Exploration (later Newmont) and
ABM Resources, so there is a precedent for access to the land.
Figure 11: Magnetic imagery highlighting the continuity of the geology across the state border, with the Luni & Crean Nb
carbonatite discoveries of WA1 & ENR on the Western Australian side, and Trek’s McEwen Hills Project (ELA33191) on the
Northern Territory side, of the West Arunta Critical Minerals Province.
During the Quarter, Trek was awarded a $66,000 co-funding grant as part of the Northern Territory
Geophysics and Drilling Collaborations Program. The grant will support a detailed airborne magnetic
survey designed to increase the resolution of magnetic features and fine-tune targets for follow-up
gravity geophysics. The combination of gravity and magnetic geophysical data are two of the key
datasets used to target intrusion-related deposits (e.g., IOCG and carbonatite-related mineralisation).
In addition, during the quarter a high resolution magnetic-radiometric survey was completed by
Thomsonair. The data is currently being processed prior to full interrogation and target generation /
additional geophysical survey planning.
Jimblebar Nickel-Copper-PGE Project (Pilbara, Western Australia)
DevEx (ASX:DEV) is exploring the Jimblebar Project as part of an Earn-in Agreement with Trek. The
project comprises over 200km2 of granted tenements adjacent to known occurrences of copper
sulphide mineralisation at the Copper Knob prospect and chromite at the historical Coobina chromite
mine, on the northern margin of the Silvania Dome in Western Australia (Figure 12).
A SQUID electromagnetic (EM) survey commenced during the Quarter to fully test poorly explored
Archean mafic and ultramafic greenstone stratigraphy. Any targets generated from the survey will be
geologically assessed and those determined to have potential for nickel and copper mineralisation will
be prioritised for drill testing.
11
Trek retains a 25% free carry through to the completion of a Bankable Feasibility Study, refer ASX:TKM
11th June 2024 announcement for additional details.
Figure 12. The Jimblebar Project is located on the flanks of the highly fertile Sylvania Dome area.
Other Projects / Partnership Strategy
After taking into consideration current market conditions and investor sentiment, the Trek Board
resolved to pursue alternative pathways for the following projects, including through joint ventures,
external funding arrangements or divestment:
•
•
•
•
Tambourah Lithium Project.
Hendeka Manganese Project – Option Agreement signed.
Jimblebar Ni-Cu Project – Earn-In Agreement signed.
Lawn Hill-Murphy West Uranium Project – Earn-In Agreement signed.
This is consistent with Trek’s strategic focus on its high-priority Christmas Creek Gold Project in the
Kimberley region of WA and its McEwen Hills Niobium Project, located along strike from WA1’s worldclass Luni discovery.
During the September Quarter, Trek signed an Option Agreement to divest the Hendeka Manganese
Project in WA’s Pilbara region to Advanced Energy Fuels, Inc (AEFI). The Option and Acquisition
Agreement gives AEFI an option to acquire the Hendeka Project as part of a proposed US listing and
by making certain payments and sole funding A$2 million of exploration expenditure.
12
AEFI is a private US company leveraging the transition to clean energy through the development of
critical minerals projects in Australia and the USA. The company is focused on US battery supply chains
and is planning to list within the next 12 months.
The agreement with AEFI follows the signing of two Earn-in Agreements during the June Quarter with
subsidiaries of DevEx Resources Limited (ASX: DEV) for an option to earn-in to the Jimblebar NickelCopper Project in the Pilbara region of Western Australia and to progress the Lawn Hill-Murphy West
Uranium Project, NT.
CORPORATE
Option Agreement to Divest the Hendeka Manganese Project
Material Terms of the Option and Acquisition Agreement include:
•
•
•
•
•
•
•
•
•
AEFI has paid an option fee of A$50,000 for an exclusive option to acquire the Hendeka
Project (“Option”).
If AEFI exercise the Option, it will acquire Trek subsidiaries Edge Minerals Pty Ltd and
Bellpiper Pty Ltd that hold the tenements that make up the Hendeka Project.
AEFI can exercise the Option anytime up until 30 September 2027 (“Option Period”) subject
to meeting the payments and exploration expenditure set out below.
AEFI to pay A$450,000 on the proposed listing of AEFI on or before 30 September 2025.
Upon listing, AEFI to issue 8,000,000 Shares or that number of AEFI Shares which represents,
on the listing of AEFI, not less than 20% of the total issued capital of AEFI on a fully-diluted
basis up to a maximum value of A$4,000,000.
As part of the Option, AEFI to also spend at least A$2,000,000 on the Hendeka Project,
including meeting minimum expenditures to maintain the tenements in good standing. AEFI
shall also be the operator of the Hendeka Project for the duration of the Option Period.
Pursuant to a separate investor rights agreement signed on the date of the Option and
Acquisition Agreement, Trek has the right but not the obligation to appoint one Director to
AEFI as well as customary participation and information rights in AEFI.
The Hendeka Project covers tenements – E46/616, E46/787, E46/835, E46/1159, E46/1160,
E46/1282, E46/1304, E46/1387, E46/1521, E46/1542 & R46/2.
The Option and Acquisition Agreement contains other customary terms for an agreement of
this nature including representations and warranties and termination rights.
Cash Position/Expenditure
The Company held cash reserves of $2.84m at the end of the quarter (Refer Appendix 5B). During the
quarter key expenditure items included:
•
•
•
Exploration and Evaluation – $1.46m (including wages of $294k, direct drilling and associated
project expenses $707k, tenement rentals and rates $238k);
Admin & Corporate costs - $297k (including annual insurances of $63k and ASX listing fees of
$37k) and;
Staffing Costs – $181k (including Director’s salaries/fees of $98k and Corporate and
administration salaries $83k).
13
Payments to Related Parties (Appendix 5B)
During the Quarter, the Company made payments of normal non-executive director’s salaries and fees
of $98k.
Authorised by the Board of Directors
ENDS
For further information contact:
INVESTORS:
MEDIA:
Derek Marshall
Nicholas Read
dmarshall@trekmetals.com.au
info@trekmetals.com.au
0419 929 046
COMPETENT PERSONS STATEMENT
The information in this report relating to Exploration Results is based on information compiled by the
Company’s Exploration Manager, Mr Chris Shaw, a Competent Person, and Member of the Australian
Institute of Geoscientists (AIG). Mr Shaw has sufficient experience relevant to the style of
mineralisation and to the type of activity described to qualify as a competent person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.” Mr Shaw has disclosed that he holds Performance Rights in the Company. Mr Shaw
consents to the inclusion in this announcement of the matters based on his information in the form
and content in which it appears.
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
This announcement contains forward looking statements. Forward looking statements are often, but
not always, identified A words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan",
"estimate", "expect" and "intend" and statements that an event or result "may", "will", "should",
"could" or "might" occur or be achieved and other similar expressions.
The forward-looking statements in this announcement are based on current expectations, estimates,
forecasts and projections about Trek and the industry in which it operates. They do, however, relate
to future matters and are subject to various inherent risks and uncertainties. Actual events or results
may differ materially from the events or results expressed or implied by any forward-looking
statements. The past performance of Trek is no guarantee of future performance.
None of Trek’s directors, officers, employees, agents or contractors makes any representation or
warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forwardlooking statement, or any events or results expressed or implied in any forward-looking statement,
except to the extent required by law. You are cautioned not to place undue reliance on any forwardlooking statement. The forward-looking statements in this announcement reflect views held only as
at the date of this announcement.
14
Tenement Schedule/Movements (ASX Listing Rule 5.3.3)
Location
Registered Holder
Last
Qtr
Interest
E45/4909
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/4917
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/4640
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/6240 (application)
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/6664 (application)
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/5484
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/5839
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/6789 (application)
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E52/3605*
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/3672
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/3983
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/4051
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E70/6000
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6001
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6004
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6072
Western Australia
ANAHEIM Pty Ltd
100%
100%
E80/4975
Western Australia
Archer X Pty Ltd
100%
100%
E80/5082
Western Australia
Archer X Pty Ltd
100%
100%
E80/5083
Western Australia
Archer X Pty Ltd
100%
100%
E80/5427
Western Australia
Archer X Pty Ltd
100%
100%
E80/5914
Western Australia
Archer X Pty Ltd
100%
100%
E80/6007 (application)
Western Australia
Archer X Pty Ltd
100%
100%
E80/6010 (application)
Western Australia
Archer X Pty Ltd
100%
100%
E80/6011 (application)
Western Australia
Archer X Pty Ltd
100%
100%
E80/6012 (application)
Western Australia
Archer X Pty Ltd
100%
100%
EL31260* (application)
Tenement
Current
Qtr
Interest
Northen Territory
TM Resources Pty Ltd
100%
100%
*
Northen Territory
TM Resources Pty Ltd
100%
100%
*
Northen Territory
TM Resources Pty Ltd
100%
100%
EL31261 (application)
EL31751 (application)
15
Location
Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
EL31752* (application)
Northen Territory
TM Resources Pty Ltd
100%
100%
E46/616
Western Australia
Edge Minerals Pty Ltd
80%
80%
E46/787
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/835
Western Australia
Bellpiper Pty Ltd
100%
100%
E46/1159
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1160
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1282
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1304
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1387
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1521 (application)
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46.1542 (application)
Western Australia
Edge Minerals Pty Ltd
100%
100%
R46/002
Western Australia
Edge Minerals Pty Ltd
80%
80%
EL 33191 (application)
Northern Territory
ELM Resources Pty Ltd
80%
80%
Tenement
Note : ACME Pilbara Pty Ltd, TM Resources Pty Ltd, Edge Minerals Pty Ltd, Archer X Pty Ltd, Bellpiper Pty Ltd,
ELM Resources Pty Ltd are all 100% subsidiaries of Trek Metals Limited.
*Subject to Earn-in agreements
During the September Quarter, Trek signed an Option and Acquisition agreement covering the following
tenements – (E46/616, E46/787, E46/835, E46/1159, E46/1160, E46/1282, E46/1304, E46/1387, E46/1521,
E46/1542 & R46/2). For full details refer to the ASX Release dated 10 September 2024
Mining Tenements acquired or disposed during the June Quarter
-
Nil
Details of Farm-in or Farm-out agreements entered into during the Quarter
-
Nil
Beneficial Percentage Interests Held in Farm-In or Farm-Out Agreements at the end of the
September 2024 Quarter
As per the table above.
16
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TREK METALS LIMITED
ARBN
Quarter ended (“current quarter”)
124 462 826
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(6 months)
$A’000
-
-
(76)
(76)
(b) development
-
-
(c) producti
Share your feedback