Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
December 2025 Quarterly Activities Report
Trek makes exceptionally high-grade manganese discovery at Christmas Creek, with follow-up
exploration underway and initial drilling to be undertaken as soon as possible.
Highlights
Christmas Creek Project, WA
• Exceptionally high-grade manganese discovery at the newly-named Kuro Prospect, with
rock chip assays of up to 60.1% Mn (approaching the theoretical maximum manganese
content of ~63% in pure manganese oxide):
o High-grade outcropping manganese mineralisation defined over a current strike
extent of 750m.
o No previous drilling has been undertaken to test the manganese mineralisation.
• Significant untested gravity high anomalies identified along strike and down the
interpreted dip direction of the high-grade manganese mineralisation at surface.
• Major manganese-focused drilling program set to commence in early 2026, subject to
obtaining heritage clearances and site access.
• High-grade gold assays returned from the final diamond drill-holes of the 2025 drilling
program at the Martin Prospect, with this data feeding into a detailed structural review
of diamond drill core to aid future drill targeting.
Corporate
• $1.0M share placement completed to fast-track manganese exploration, including
ground and airborne geophysics, follow-up field programs and drill preparations.
• Highly experienced Queensland-based business executive Mr Andrew Reece appointed
to the board as a Non-Executive Director, bringing extensive commercial and executive
leadership experience.
• Advanced Energy exercises option to acquire Trek’s Non-Core Hendeka Project
• Cash position at 31 December 2025 of $2.59 million.
Overview
Trek Metals’ CEO Derek Marshall said the December Quarter marked a potentially transformational
period for the Company, headlined by the exceptionally high-grade manganese discovery made by
Trek’s field team at the Christmas Creek Project in WA’s Kimberley region.
2
Mr Marshall said: “Our fieldwork programs during the December Quarter delivered outstanding
results, with exceptionally high-grade manganese mineralisation discovered in outcrop. Rock chip
sampling of these outcrops delivered absolutely outstanding grades, with the 36 samples collected to
date returning an exceptional average grade of 50% manganese.
“The manganese outcrops have currently been defined over a strike length of 750 metres, with a
follow-up high-resolution ground gravity survey indicating the potential for a much larger mineralised
system concealed below shallow sand cover. This area has never previously been drilled for
manganese mineralisation, making it an exceptional target for follow-up exploration. We are now
advancing these targets towards drill testing as soon as possible.
“To help accelerate these exploration programs, Trek undertook a share placement during the Quarter
to raise $1 million. This placement included a $500,000 strategic investment from existing shareholder
Andrew Reece, who has also joined the Trek board as a Non-Executive Director.
“Manganese is a strategic and valuable mineral that is crucial for steelmaking, enhancing strength
and workability. Increasingly, it is becoming a key battery metal, supporting the fast-growing electric
vehicle and energy storage markets through its use in lithium-ion battery cathodes. Manganese also
has a broad range of applications across health, glass, ceramics, fertilisers and chemical industries. A
discovery of any commercial scale could have significant implications for Trek and our shareholders.”
Christmas Creek Project (Kimberley, Western Australia)
Located south-west of Halls Creek, the Christmas Creek Project comprises a previously unexplored,
largely concealed district-scale exploration opportunity in the Kimberley region of WA associated with
major continental-scale tectonic lineament intersections (Figure 1).
Figure 1: Continental-scale context and location map for the Christmas Creek Project, located at the intersection of G3 and G5
metallogenic lineament corridors, potentially representing the intersection of the Granites-Tanami Orogen & the Halls Creek
Orogen.
3
Trek completed the acquisition of the Christmas Creek Project which was previously part of Newmont
Exploration Pty Ltd’s (Newmont) global exploration portfolio in the December 2023 Quarter. The
Company has also secured additional tenement applications to add to this district-scale greenfields gold,
manganese and rare earths exploration project.
During the Quarter, Trek made a potentially significant high-grade manganese discovery at Christmas
Creek, with assays from rock chipping undertaken at a recently discovered cluster of very high-grade
manganese outcrops returning exceptionally high manganese grades.
Manganese rock chip sampling program
During the Quarter, the Company reported assays from rock chipping undertaken at a cluster of very
high-grade manganese outcrops (Figure 2), with exceptionally high manganese grades confirming the
commercial potential and significance of the find.
This discovery has now been named the “Kuro Prospect”.
Figure 2. All rock chips to date at Kuro displayed as dots coloured by Mn grade, with yellow callouts for new Mn results over
55% Mn, highlighting the extensive occurrence of high-grade Mn. Underlying coloured image of residual filtered gravity
anomaly (0.02 mGal contours) across the Christmas Creek manganese (Mn) discovery zone – Kuro Prospect, showing strong
positive anomaly responses coincident with high-grade Mn mineralised outcrops. Grey dashed zones are areas identified from
drone imagery that appear to have surface expression of the geology.
Results to date demonstrate the presence of consistent, laterally extensive high-grade manganese
mineralisation at surface over a strike extent of more than 750 metres along the main outcropping
trend. The surface mineralisation occurs within a broader corridor up to approximately 400 metres wide,
defined by multiple sub-parallel discrete outcrops with intervening areas of untested shallow cover.
4
Importantly, the surface mineralisation occurs within a much larger gravity-defined anomaly that
extends well beyond the mapped outcrop limits. The new rock chip results returned an exceptional
average grade of 50.7% Mn from 36 samples (29.9% - 60.1% Mn, 10% cut-off) collected to date at the
Kuro Prospect.
Interpretation has been further advanced through the use of high-resolution drone imagery, providing
detailed surface coverage to help identify areas of outcrop that may have been missed during
helicopter-supported and on-foot reconnaissance. Multiple areas have been identified that are
consistent with the main outcropping trend and are yet to be visited, with many of these coinciding with
significant gravity high anomalies (refer Figure 2). These areas will be investigated once the project area
becomes accessible in the upcoming field season.
The gravity anomaly trends and discrete highs are interpreted to reflect dense manganese
mineralisation beneath and along the same mineralised corridor defined by surface outcrops, with
potential extensions along two interpreted structural corridors and beneath intervening areas of
shallow cover.
The coincidence of extensive high-grade surface mineralisation with strong gravity responses suggests
the presence of a substantially larger hydrothermal manganese system concealed at depth, supporting
planned upcoming drill testing of priority targets.
Ground Gravity Survey
Trek completed a high-resolution ground gravity survey over this new high-grade manganese (Mn)
discovery. The tightly spaced ground gravity survey station spacing of 40m x 40m was completed by
Atlas Geophysics, with data processing and interpretation carried out by Resource Potentials Pty Ltd.
Processing and interpretation of the ground gravity data has outlined strong, coherent residual gravity
anomalies directly coincident with the mapped high-grade Mn outcrops. This validates earlier
petrophysical work, confirming that the exceptionally dense Mn oxide minerals observed at surface
(likely cryptomelane and psilomelane) may produce a clear and measurable positive gravity anomaly
response directly below and to the west, indicating a potential westward dip to a Mn target system
(Figure 2).
The Company has submitted additional samples for ongoing petrophysical work to test the geophysical
properties of rock samples for deciding which survey methods have the best potential, and to then
analyse their mineralogy and geochemistry to better understand the mineralisation process in this new
discovery area.
Importantly, the gravity anomaly contours define two, high-density body trends extending beneath the
two main Mn outcrop clusters, and these anomaly trends are interpreted as forming substantial
accumulations of manganiferous material at depth and represent high-priority drill targets.
The geometry of the gravity anomalies also reveals two distinct structurally controlled corridors forming
interpreted fault zones in a possible folded sequence of dolomite under the sand cover, suggesting that
structural pathways have potentially played a key role in localising Mn mineralisation, a feature that
provides valuable context for future drill targeting and supports Trek’s initial hydrothermal model for
the genesis of the Mn mineralisation.
In addition, the gravity anomalism extends significantly beyond the limits of the exposed Mn
mineralisation, with two separate anomaly zone trends interpreted to exceed 1km each. This indicates
5
that the potential manganese system at Christmas Creek may be considerably larger than the 750
metres of currently mapped high-grade outcrops.
Collectively, these outcomes represent a major advancement in defining high-priority drill targets and
significantly enhance the scale potential of the new manganese discovery.
Final Gold Diamond Drill Results
Two diamond holes (Figure 4) were completed as part of the 2025 drilling campaign as twins to two
previously drilled Reverse Circulation (RC) drill-holes 24XCRC097 (ASX: TKM 31st October 2024
https://trekmetals.com.au/announcements/6605930) and NEWXCRC015 (ASX: TKM 11th October
2023, https://trekmetals.com.au/announcements/4421568) at the Martin Prospect.
These previously reported RC holes returned the following intercepts:
• 10m at 12.66g/t Au from 59m and 10m at 7.34g/t Au from 94m in hole 24XCRC097
• 4m @ 1.22g/t Au from 8m, 27m @ 0.26g/t Au from 87m, and 3m @ 2.03g/t Au from 137m in
hole NEWXCRC015
Assay results have been received from sampling of the two twin holes. Highlights include:
• 0.3m @ 34.5g/t Au from 45.9m in hole 25XCDD001
• 4.9m @ 1.57g/t Au from 89.1m in hole 25XCDD001
• 5.3m @ 2.12g/t Au from 96.0m in hole 25XCDD001, inc. 3.1m @ 3.53g/t Au from 97m
• 9.3m @ 1.95g/t Au from 41.6m in hole 25XCDD002, inc. 0.9m @ 12.85g/t Au from 41.6m
• 1.5m @ 4.02g/t Au from 149m in hole 25XCDD002, inc. 0.5m @ 11.3g/t Au from 150m
• 2.3m @ 2.95g/t Au from 155.2m in hole 25XCDD002
These results provide a high level of detail as to which veins are mineralised and will allow for a fully
informed structural interpretation of the diamond drill core to be undertaken.
A detailed structural review is currently underway with an expert consultant. The outcome of this work
will inform the 3D interpretation of the mineralised vein arrays and assist with drill targeting for the next
round of exploration drilling at Christmas Creek.
6
Figure 3: Cross-section oriented North-South (view West, refer Figure 4 for section line) showing previous and new significant
intercepts (in yellow) and interpreted gold bearing vein network. The gold system is interpreted to be open at depth and along
strike, with significant upside potential.
Figure 4: Martin Prospect plan view showing drill collars, traces, significant intercepts (with newly reported in yellow), and
drill cluster around previously reported high grade results in 24XCRC097 and NEWXCRC015. The section line and clip for the
section provided as Figure 3 is also highlighted.
7
Next Steps
• Integration of gravity and ExciteTM
helicopter electromagnetic and magnetic data, once data
from the recently completed ExciteTM
survey has been final processed and interpreted.
• Petrophysical test work is ongoing, with analysed samples to be submitted to an assay
laboratory for mineral and geochemical testing.
• Refined Mn drill targeting once final geophysical survey data are received and detailed inversion
modelling is completed.
• Drill permitting to commence immediately, with heritage requests submitted for consideration
with the YMN traditional owners.
• Ongoing structural, geological and petrophysical interpretation to further characterise of the
Mn mineralised system geometry and scale.
• Ongoing gold and base metal exploration within the broader Christmas Creek project area.
McEwen Hills Niobium Project (West Arunta, Northern Territory)
Trek secured the highly prospective McEwen Hills Niobium Project during the September 2023 Quarter,
located in the heart of the West Arunta Critical Minerals Province. The continued success of WA1
Resources in defining the scale of their Luni Niobium discovery along strike from Trek’s McEwen Hills
Project highlights the potential of the province, and more recently Encounter Resources have also been
having exploration success in the region.
Figure 5: Magnetic imagery highlighting the continuity of the geology across the state border, with the Luni & Crean Nb
carbonatite discoveries of WA1 & ENR on the Western Australian side, and Trek’s McEwen Hills Project (ELA33191) on the
Northern Territory side, of the West Arunta Critical Minerals Province.
The tenement application area is located within freehold aboriginal lands of the Lake MacKay Aboriginal
Land Trust and is administered by the Central Land Council. Access and exploration for gold has
previously been completed by Tanami Gold NL, Normandy Gold Exploration (later Newmont) and ABM
Resources, so there is a precedent for access to the land.
Trek attended an on-country meeting with the Traditional Owners of the land underlaying its tenement
application ELA33191 in May 2024. Meeting members of the Lake MacKay Aboriginal Land Trust in
Nyirripi, Northern Territory, represents an important step in the negotiation process and is essential for
the grant of the tenement to occur. The Company is negotiating a draft access agreement with the
Central Land Council.
8
South Woodie Woodie (Formerly Hendeka) Project (Pilbara, Western Australia)
In September 2024, Trek entered into an option and acquisition agreement (“Option Agreement”) with
Advanced Energy Fuels, Inc. (“AEF”) over Trek’s Hendeka Manganese Project in the Pilbara region of
Western Australia. The Option Agreement gave AEF an option to acquire the Hendeka Project as part of
a proposed North American listing and by making certain payments and sole funding A$2 million of
exploration and development expenditures.
On 19 December 2025, Trek received an Option Exercise Notice from AEF, which has also completed a
reverse takeover of Cavalry Capital Corp (TSXV:CVY.P), under which Cavalry received conditional
approval for a Qualifying transaction to meet the listing requirements for a Tier-2 mining issue under
the Canadian TSX Venture Exchange. Settlement was completed on 29 December 2025 with the TSXV-
listed company renamed AE Fuels Corporation (TSXV:AEF.P). Upon settlement, Trek received
A$450,000 in cash and holds a total of 8,000,000 shares in AEF which represents approximately 19.31%
of the undiluted ordinary shares of AEF. Trek CEO Derek Marshall has also joined the board of AEF as a
Non-Executive Director.
Jimblebar Nickel-Copper-PGE Project (Pilbara, Western Australia)
DevEx Resources (ASX: DEV) (“DevEx”) is exploring the Jimblebar Project as part of an Earn-in Agreement
with Trek (Refer ASX Release 11 June 2024). During the quarter DevEx subsidiary Green Critical Resources
Pty Ltd (GCR) exercised the Earn-In option for a 75% Joint Venture (“JV”) interest by sole funding
exploration expenditure of not less than A$3,000,000 on the Tenements within 5 years. If GCR earns its
75% JV interest, Trek will be free carried for its share of JV expenditure until the completion of a Bankable
Feasibility Study.
The project comprises over 200km2 of granted tenements adjacent to known occurrences of copper
sulphide mineralisation at the Copper Knob prospect and chromite at the historical Coobina chromite
mine, on the northern margin of the Silvania Dome in Western Australia.
CORPORATE
Capital Raising
Trek completed a strategic capital raising of $1.0 million (before costs) to accelerate exploration
at the Christmas Creek Gold and Manganese Project and for general working capital purposes
(Placement). The Placement comprised the issue of approximately 17.543 million fully-paid
ordinary shares at an issue price of $0.057 per Share to existing and new professional and
sophisticated investors. The proceeds of the placement will primarily be allocated to support
the Company’s accelerated exploration push at its recently announced high-grade outcropping
manganese discovery at Christmas Creek.
Director appointment
As part of the placement outlined above, the Company entered into a Subscription Agreement
with Queensland-based mining investor and businessman Andrew Reece who made a
cornerstone $500,000 investment and has been appointed to the Trek board.
9
Mr Reece brings extensive commercial and executive leadership experience, having previously
co-founded Inspect Real Estate and served as its Chief Executive Officer. He has a proven track
record in building high-growth businesses, implementing fast-track strategic frameworks, and
guiding organisations through periods of expansion and operational transformation.
Cash Position/Expenditure
The Company held cash reserves of $2.59 million at the end of the quarter (Refer Appendix 5B). During
the quarter, the Company made the following payments in relation to exploration activities:
Activity $000
Assaying and associated project expenses 280
Geophysical expenses 112
Exploration staff salaries and wages 194
Tenement rental, rates and expenses 93
Other Project expenses 48
Total as reported in the Appendix 5B 727
The company also incurred expenditure of :-
• Admin & Corporate costs - $110k (including audit fees of $20k) and;
• Staffing Costs – $148k (including Director’s fees of $88k and Corporate and administration
salaries $60k).
Payments to Related Parties (Appendix 5B)
During the Quarter, the Company made payments for non-executive directors’ salaries and fees of $88k.
These payments relate to existing remuneration arrangements (salaries, directors consulting fees and
superannuation).
Authorised by the Board of Directors
ENDS
For further information contact:
INVESTORS: MEDIA:
Derek Marshall Nicholas Read
dmarshall@trekmetals.com.au info@trekmetals.com.au 0419 929 046
Competent Persons Statement
The information in this report relating to Exploration Results is based on information compiled by the
Company’s Chief Executive Officer, Mr Derek Marshall, a Competent Person, and Member of the
Australian Institute of Geoscientists (AIG). Mr Marshall has sufficient experience relevant to the style of
mineralisation and to the type of activity described to qualify as a competent person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves.” Mr Marshall has disclosed that he holds Ordinary shares and Performance Rights in the
Company. Mr Marshall consents to the inclusion in this announcement of the matters based on his
information in the form and content in which it appears.
10
Tenement Schedule/Movements (ASX Listing Rule 5.3.3)
Tenement Location Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
E45/4909 Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/4917 Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/4640 Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/6240 (application) Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/6664 Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/5484 Western Australia ACME Pilbara Pty Ltd 100% 100%
E45/5839 Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/3605*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/3672*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/3983*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E52/4051*
Western Australia ACME Pilbara Pty Ltd 100% 100%
E70/6000 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6001 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6004 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6072 Western Australia ANAHEIM Pty Ltd 100% 100%
E70/6690 (application) Western Australia ANAHEIM Pty Ltd 100% 100%
E80/4975 Western Australia Archer X Pty Ltd 100% 100%
E80/5082 Western Australia Archer X Pty Ltd 100% 100%
E80/5083 Western Australia Archer X Pty Ltd 100% 100%
E80/5427 Western Australia Archer X Pty Ltd 100% 100%
E80/5914 Western Australia Archer X Pty Ltd 100% 100%
E80/6007 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6010 (application) Western Australia Archer X Pty Ltd 100% 100%
E80/6011 Western Australia Archer X Pty Ltd 100% 100%
E80/6012 Western Australia Archer X Pty Ltd 100% 100%
EL31260*
(application) Northen Territory TM Resources Pty Ltd 100% 100%
EL31261*
(application) Northen Territory TM Resources Pty Ltd 100% 100%
EL31751*
(application) Northen Territory TM Resources Pty Ltd 100% 100%
EL31752*
(application) Northen Territory TM Resources Pty Ltd 100% 100%
11
Tenement Location Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
E46/787 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/835 Western Australia Bellpiper Pty Ltd 100% 0%
E46/1159 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/1160 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/1282 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/1304 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/1387 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/1521 Western Australia Edge Minerals Pty Ltd 100% 0%
E46/1542 Western Australia Edge Minerals Pty Ltd 100% 0%
R46/002 Western Australia Edge Minerals Pty Ltd 80% 0%
E46/1580 (application) Westen Australia Edge Minerals Pty Ltd 100% 0%
EL 33191 (application) Northern Territory ELM Resources Pty Ltd 80% 80%
Note: ACME Pilbara Pty Ltd, TM Resources Pty Ltd, Archer X Pty Ltd, ELM Resources Pty Ltd are all 100%
subsidiaries of Trek Metals Limited.
*Subject to Earn-in agreements
Mining Tenements acquired or disposed during the Quarter
During the September 2024 Quarter, Trek signed an Option and Acquisition agreement covering the following
tenements – (E46/616, E46/787, E46/835, E46/1159, E46/1160, E46/1282, E46/1304, E46/1387, E46/1521,
E46/1542 & R46/2). For full details refer to the ASX Release dated 10 September 2024 and 30 July 2025. On 19
December 2025, the Option was exercised with settlement completed on 29th
December 2025.
Details of Farm-in or Farm-out agreements entered into during the Quarter
Nil.
Beneficial Percentage Interests Held in Farm-In or Farm-Out Agreements at the end of the Quarter
As per the table above.
Mining Production and Development Activities
There were no mining production and development activities during the quarter.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TREK METALS LIMITED
ARBN Quarter ended (“current quarter”)
124 462 826 31 DECEMBER 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (148) (383)
(e) administration and corporate costs (110) (472)
1.3 Dividends received (see note 3) - -
1.4 Interest received 10 51
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material)
EIS co-funding
GST (net)
-
-
99
7
144
(21)
1.9 Net cash from / (used in) operating
activities
(149) (674)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (4) (13)
(d) exploration & evaluation (727) (3,691)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
2.2 Proceeds from the disposal of:
450 450
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (net cash on acquisition of
subsidiary)
- -
2.6 Net cash from / (used in) investing
activities
(281) (3,254)
3. Cash flows from financing activities
1,000 4,500
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - 436
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(23) (107)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
977 4,829
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
2,051 1,697
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(149) (674)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(281) (3,254)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
977 4,829
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
2,598 2,598
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 2,574 2,027
5.2 Call deposits 24 24
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,598 2,051
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
88
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (149)
8.2 (Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(727)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (876)
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,598
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 2,598
8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3) 2.97
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
Compl
Share your feedback
Discover