29 June 2026
Multiple Mineralised Zones Intersected at the Kuro
Manganese Discovery as Drill Program Expands
Visual manganese* intersected in all holes completed to date, including up to 17 metres of semi-
massive manganese, with drilling expanded to test newly identified high-priority targets
Highlights
• 15 Reverse Circulation (RC) drill holes completed to date for 1,164 metres.
• Visual manganese mineralisation* intersected in all holes, including:
o 17 metres of visual semi-massive manganese from 9m down-hole in drill-hole
26XCRC014, within a broader zone of 27 metres from 2m down-hole.
o 9 metres of visual massive manganese from 24m down-hole in drill-hole 26XCRC015,
within a broader zone of 18 metres from 19m down-hole.
o 6 metres of visual massive manganese from surface in drill-hole 26XCRC006, within a
broader zone of 25 metres from surface.
• First batch of drill samples to be dispatched this week for laboratory analysis, with results
expected in 4-6 weeks.
• Multiple new high-priority drill targets identified in Induced Polarisation surveying, including
recent holes 26XCRC014 & 015 – which were designed to target a chargeability high – delivering
significant manganese intercepts.
• Additional drill pad earthworks completed over the weekend under the supervision of
Traditional Owner monitors to allow drill testing of additional chargeability anomalies.
Trek Metals Limited (ASX: TKM) (“Trek” or the “Company”) is pleased to provide an update on its
recently commenced maiden Reverse Circulation (RC) drilling program at the Kuro manganese
discovery, within its 100%-owned Christmas Creek Manganese and Gold Project in WA’s Kimberley
region.
A total of 15 RC holes have been completed to date (Figure 1 & Table 1) with multiple shallow zones
of visual manganese intersected in all holes, including a best intercept of 17 metres down-hole in drill-
hole 26XCR014 (Table 2). The manganese mineralisation observed to date is consistent with the
previously announced interpretation of a hydrothermal “Woodie Woodie” style genesis, which
typically occurs in multiple discrete ‘pods’ across an extensive area.
Cautionary Statement: * Visual estimates of mineral abundance should never be considered a
proxy or substitute for laboratory analyses where concentrations or grades are the factor of
principal economic interest. Visual estimates also potentially provide no information regarding
impurities or deleterious physical properties relevant to valuations.
2
The visually observed manganese mineralisation is not representative of the entire Kuro Prospect,
with drilling currently on-going to further assess the distribution of manganese. Representative
drill samples are being routinely collected from the drill rig and will be analysed at ALS
laboratories and reported in due course (expected 4-6 week turn around).
The Company’s geological interpretation has evolved following integration of drilling and geophysical
data. The large-scale gravity feature is now interpreted to represent basement highs within the
Paleoproterozoic Lamboo Formation rather than direct extensions of the manganese outcrop. Drilling
to date indicates that manganese mineralisation is likely hosted within younger Neoproterozoic basin
rocks overlying the Paleoproterozoic basement. Again, these sedimentary basin host-rocks are
consistent with the geological setting at the Woodie Woodie manganese mineralised district.
Recent ground-based Induced Polarisation surveying has identified several large discrete chargeability
anomalies that appear to correlate to manganese mineralisation, as seen in hole 26XCRC014, which
successfully tested one such anomaly and intersected 17 metres of semi-massive manganese
mineralisation (refer Table 2 for detailed visual estimate information and Figure 1 below).
Figure 1. Plan view of Kuro, Gradient Array Induced Polarisation (GAIP) Chargeability anomalism shown as full-colour
background with contour lines (white-red hot indicative of highly chargeable zones), manganese outcrop as grey polygons
with black outlines, and completed Reverse Circulation drill-holes as black dots with hole ID labelled.
This provides encouragement that the remaining untested IP anomalies may represent additional
mineralised zones. Drilling will continue to systematically test these IP anomalies as a priority with
additional drill pads cleared and prepared.
A total of 77 drill pads have been prepared, with the current drill program only approximately 20 per
cent complete.
3
Trek Metals CEO, Derek Marshall, said:
“It is still early days in our maiden drill program at Kuro, which is the first targeting manganese in the
project area. The observed visual manganese mineralisation and associated host-rocks are consistent
with a hydrothermal “Woodie Woodie-style” system and continue to represent the top priority drill
target area for the Company.
“We are excited by the significant visual manganese intersection in hole 26XCRC014, which was drilled
into a recently identified zone of chargeable rocks. The Induced Polarisation survey, completed by
Moombarriga Geoscience, has identified numerous high chargeability trends which remain untested,
and we have just completed additional earthmoving to allow drill testing of these high-priority targets.
“Importantly, drilling is not only confirming the presence of manganese mineralisation in multiple
holes, but the IP survey is providing an effective targeting tool that is helping us identify additional
prospective zones. That gives us increasing confidence in the scale of the exploration opportunity we
are testing.
“We look forward to the on-going drill testing of numerous high-priority targets, with our first batch
of laboratory assays expected in 4-6 weeks’ time, and on-going geophysics helping to refine our drill
targeting and evolving exploration model.”
Figure 2. Precision Exploration Drilling’s Reverse Circulation drill rig drilling 26XCRC006 into the discovery outcrop at Kuro.
4
Figure 3. 26XCRC014 chip tray photo, showing interpreted visual manganese mineralised interval, with 17 metres of visual
semi-massive manganese from 9m down-hole, within a broader zone of 27 metres from 2m down-hole. Readers are referred
to Table 2 for detailed information regarding visual estimates. Corresponding sample IDs are: TKMRC02109 – 02137.
Readers are reminded that Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
The visually observed manganese mineralisation is not representative of the entire Kuro Prospect, with drilling currently on-
going to further assess the distribution of manganese. Representative drill samples are being routinely collected from the drill
rig and will be analysed at ALS laboratories and reported in due course (expected 4-6 week turn around).
Figure 4. 26XCRC015 chip tray photo, showing interpreted visual manganese mineralised interval, with 9 metres of visual
massive manganese from 24m down-hole, within a broader zone of 18 metres from 19m down-hole. Readers are referred to
Table 2 for detailed information regarding visual estimates. Corresponding sample IDs are: TKMRC02185 – 02204.
Readers are reminded that Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
The visually observed manganese mineralisation is not representative of the entire Kuro Prospect, with drilling currently on-
going to further assess the distribution of manganese. Representative drill samples are being routinely collected from the drill
rig and will be analysed at ALS laboratories and reported in due course (expected 4-6 week turn around).
5
Authorised by the Board of Directors
ENDS
For further information contact:
INVESTORS: MEDIA:
Derek Marshall Nicholas Read
dmarshall@trekmetals.com.au info@trekmetals.com.au 0419 929 046
JOIN TKM’S INTERACTIVE INVESTOR HUB
https://trekmetals.com.au/auth/signup
Interact with Trek Metal’s announcements and updates by asking
questions and comments which our team can respond to where possible
https://trekmetals.com.au/link/P4zE9e
COMPETENT PERSONS STATEMENT
The information in this report relating to Exploration Results is based on information compiled by the
Company’s Chief Executive Officer, Mr Derek Marshall, a Competent Person, and Member of the
Australian Institute of Geoscientists (AIG). Mr Marshall has sufficient experience relevant to the style
of mineralisation and to the type of activity described to qualify as a competent person as defined in
the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves.” Mr Marshall has disclosed that he holds fully paid Ordinary Shares and
Performance Rights in the Company. Mr Marshall consents to the inclusion in this announcement of
the matters based on his information in the form and content in which it appears.
DISCLAIMERS AND FORWARD-LOOKING STATEMENTS
This announcement contains forward looking statements. Forward looking statements are often, but
not always, identified by words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan",
"estimate", "expect" and "intend" and statements that an event or result "may", "will", "should",
"could" or "might" occur or be achieved and other similar expressions.
The forward-looking statements in this announcement are based on current expectations, estimates,
forecasts and projections about Trek and the industry in which it operates. They do, however, relate
to future matters and are subject to various inherent risks and uncertainties. Actual events or results
may differ materially from the events or results expressed or implied by any forward-looking
statements. The past performance of Trek is no guarantee of future performance.
None of Trek’s directors, officers, employees, agents or contractors makes any representation or
warranty (either express or implied) as to the accuracy or likelihood of fulfilment of any forward-
looking statement, or any events or results expressed or implied in any forward-looking statement,
except to the extent required by law. You are cautioned not to place undue reliance on any forward-
looking statement. The forward-looking statements in this announcement reflect views held only as
at the date of this announcement.
6
Table 1. Collar Table for the on-going 2026 Reverse Circulation drilling at the Christmas Creek Project, listing holes
26XCRC001 – 26XCRC015, co-ordinates listed are grid MGA2020 Z52.
Hole ID Type Depth North East RL Dip Azi Lease ID Prospect
26XCRC001 RC 84 7874448 266964 337 -60 35 E80/4975 Kuro
26XCRC002 RC 54 7874483 266996 335 -60 35 E80/4975 Kuro
26XCRC003 RC 150 7874185 266731 334 -60 35 E80/5427 Kuro
26XCRC004 RC 100 7874229 266752 335 -60 35 E80/5427 Kuro
26XCRC005 RC 150 7874160 266696 334 -60 35 E80/5427 Kuro
26XCRC006 RC 48 7874337 266601 338 -65 229 E80/5427 Kuro
26XCRC007 RC 30 7874234 266662 333 -90 0 E80/5427 Kuro
26XCRC008 RC 40 7874339 266711 336 -90 0 E80/5427 Kuro
26XCRC009 RC 78 7874006 267025 329 -90 0 E80/4975 Kuro
26XCRC010 RC 60 7874074 266740 330 -90 0 E80/5427 Kuro
26XCRC011 RC 60 7874538 266909 337 -80 200 E80/5427 Kuro
26XCRC012 RC 84 7874511 266895 338 -90 0 E80/5427 Kuro
26XCRC013 RC 100 7874418 266838 334 -90 0 E80/5427 Kuro
26XCRC014 RC 54 7873887 267248 330 -90 0 E80/4975 Kuro
26XCRC015 RC 72 7873972 267353 329 -90 0 E80/4975 Kuro
Table 2. Lithological description and visual manganese mineralisation estimate table for holes 26XCRC001 – 26XCRC015.
Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also
potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
The visually observed manganese mineralisation is not representative of the entire Kuro Prospect, with drilling currently on-
going to further assess the distribution of manganese. Representative drill samples are being routinely collected from the
drill rig and will be analysed at ALS laboratories and reported in due course (expected 4-6 week turn around).
Hole ID From To
Downhole
Length
Mineral
Occurrence
Visual Estimate
Manganese Oxide
(percentage)
Description
26XCRC001 0 2 2 Lateritic 10 Manganese (Mn) rich laterite
26XCRC001 6 12 6 Layering 5 Mn layers through siltstone
26XCRC001 12 16 4 Veins 15 Mn veins within sandstone
26XCRC002 0 1 1 Clasts 30 Supergene Mn clasts in siltstone
26XCRC002 4 8 4 Alteration 30 Dark Mn siltstone, minor hematite
26XCRC002 8 10 2 Veins 10 Minor Mn veins in gneiss
26XCRC002 10 14 4 Alteration 30
Heavily Mn altered chips in gneiss and
weathered pegmatite
26XCRC002 14 20 6 Alteration 3 Minor Mn alteration in gneiss
26XCRC002 20 23 3 Alteration 30 As above but more intense Mn alteration
26XCRC002 30 31 1 Semi-massive 70 Semi-massive chips of Mn in gneiss
26XCRC003 0 6 6 Veins 10 Mn as veins / minor brecciation in conglomerate
26XCRC003 6 8 2 Fractures 5 Sandstone / gneiss with minor Mn on fractures
26XCRC003 8 15 7 Alteration 10 Minor Mn alteration in gneiss
26XCRC003 15 24 9 Semi-massive 50 Semi-massive chips of Mn in clay rich unit
26XCRC004 0 1 1 Lateritic 30 Mn rich laterite
26XCRC004 1 4 3 Alteration 10 Mn alteration in sandstone
26XCRC004 4 9 5 Semi-massive 50
Semi-massive Mn (and Fe) alteration of
sandstone unit
7
Hole ID From To
Downhole
Length
Mineral
Occurrence
Visual Estimate
Manganese Oxide
(percentage)
Description
26XCRC004 9 11 2 Alteration 10 Fe (and Mn) alteration of sandstone
26XCRC004 11 13 2 Veins 30 Mn veins in sandstone
26XCRC004 13 14 1 Alteration 2 Fe (and Mn) alteration of sandstone
26XCRC004 14 15 1 Massive 80 Massive Mn with sandstone
26XCRC004 15 22 7 Veins 20 Mn veins in sandstone
26XCRC004 22 29 7 Veins 20 Mn veins in clay rich unit
26XCRC005 13 19 6 Veins 2 Minor Mn veins in conglomerate
26XCRC005 23 45 22 Veins 2 Minor Mn veins in conglomerate
26XCRC006 0 6 6 Massive 80 Massive Mn chips with minor sandstone
26XCRC006 6 15 9 Veins 30 Mn veins in sandstone
26XCRC006 15 18 3 Alteration 5 Minor Mn alteration in sandstone
26XCRC006 18 23 5 Alteration 10 Moderate Mn alteration in clay rich zone
26XCRC006 23 25 3 Alteration 2 Minor Mn alteration in clay rich zone
26XCRC007 0 4 4 Massive 90 Massive Mn chips with minor sandstone
26XCRC007 4 12 8 Veins 15 Dendritic veins through sandstone
26XCRC007 12 19 7 Veins 3 Minor Mn veins in sandstone
26XCRC008 0 2 2 Semi-massive 70 Intense Mn (and Fe) alteration of sandstone
26XCRC008 2 7 5 Veins 10 Mn veins in sandstone
26XCRC008 7 10 3 Alteration 3 Minor Mn alteration of sandstone
26XCRC008 10 11 1 Veins 40 Moderate Mn veins in sandstone
26XCRC008 11 14 3 Alteration 3 Minor Mn alteration of sandstone
26XCRC008 14 16 2 Alteration 25 Moderate Mn in sandstone / clay
26XCRC008 22 23 1 Veins 40 Moderate Mn veins in sandstone
26XCRC009 0 4 4 Alteration 10 Moderate Mn (and Fe) alteration of sandstone
26XCRC009 4 8 4 Alteration 25 Moderate Mn (and Fe) alteration of sandstone
26XCRC009 8 15 7 Alteration 5 Minor Mn (and Fe) alteration of sandstone
26XCRC009 19 27 8 Alteration 3 Minor Mn (and Fe) alteration of sandstone
26XCRC009 27 29 2 Alteration 5 Minor Mn (and Fe) alteration of sandstone
26XCRC009 29 40 11 Alteration 5 Minor Mn (and Fe) alteration of sandstone
26XCRC009 72 78 6 Alteration 2 Minor Mn (and Fe) alteration of sandstone
26XCRC010 0 2 2 Semi-massive 40 Intense Mn (and Fe) alteration of sandstone
26XCRC010 2 11 9 Veins 2 Minor Mn veins in sandstone
26XCRC011 0 1 1 Massive 100 Massive Mn chips
26XCRC011 1 4 3 Semi-massive 50 Semi-massive Mn in sandstone
26XCRC011 4 7 3
Vein and
alteration
30 Vein and alteration Mn in gneiss
26XCRC011 7 14 7 Alteration 10 Minor Mn alteration in gneiss
26XCRC011 34 35 1 Semi-massive 60 Intense Mn alteration in gneiss
26XCRC011 35 37 2 Alteration 10 Minor Mn alteration in gneiss
26XCRC012 0 1 1 Alteration 10 Minor Mn alteration in sandstone
26XCRC012 1 7 6 Veins 5 Minor Mn veins in saprock
26XCRC012 7 8 1 Alteration 2 Minor Fe (and Mn) alteration in sandstone
26XCRC012 8 11 3 Semi-massive 60 Intense Mn (and Fe) alteration of gneiss
26XCRC012 12 16 4 Alteration 2 Minor Mn alteration of gneiss
8
Hole ID From To
Downhole
Length
Mineral
Occurrence
Visual Estimate
Manganese Oxide
(percentage)
Description
26XCRC012 16 19 3 Alteration 15 Moderate Mn alteration of gneiss
26XCRC013 0 5 5 Alteration 5 Minor Mn alteration of sandstone
26XCRC013 5 9 4 Veins 10 Minor Mn veins in sandstone
26XCRC013 9 16 7 Veins 10 Minor Mn veins in clay rich unit
26XCRC014 2 9 7 Veins 10 Minor Mn vein / breccia of saprock
26XCRC014 9 14 5 Semi-massive 70 Semi-massive Mn chips in saprock
26XCRC014 14 20 6 Massive 90 Massive Mn chips with minor clay
26XCRC014 20 22 2 Semi-massive 35 Semi-massive Mn chips in pegmatite
26XCRC014 22 26 4 Semi-massive 70 Semi-massive Mn chips in pegmatite
26XCRC014 26 29 3 Alteration 3 Minor Mn alteration of sandstone and clay
26XCRC015 19 20 1 Semi-massive 30 Semi-massive Mn chips in saprock
26XCRC015 20 24 4 Semi-massive 35 Semi-massive Mn chip in clay
26XCRC015 24 33 9 Massive 95 Massive Mn chips
26XCRC015 33 37 4 Semi-massive 60 Semi-massive Mn chips in sandstone
9
JORC Table Section 1: Sampling Techniques and Data:
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required,
such as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
• Drilling was undertaken using RC with a face sampling bit. RC cuttings
were collected at 1m intervals via a cyclone and cone splitter,
producing ~2.5kg samples, with bulk residues retained on site and
composite sampled as 4m intervals.
• Samples are being freighted for analysis at ALS Perth using:
o ME-XRF26s which consists of a Lithium Borate Fusion and X-Ray
Fluorescence Spectroscopy analysis. This method is suitable for
the determination of major and minor elements in ore samples
which require a high dilution digest such as Chromite and high
Manganese ores.
o Fire assay with AAS finish (Au-AA25, 30g), and
o Four-acid digest with ICP-MS (ME-MS61, 48 elements).
These are considered industry-standard and appropriate methods.
• Field duplicates and certified reference standards were inserted every
50 samples, with laboratory checks also applied. QA/QC results will
be assessed to ensure they are within acceptable limits. Recoveries
were high, with no observed bias between grade and recovery. Chain
of custody was maintained from site to laboratory.
• All holes completed have been included in figures within the body of
the announcement and listed in tabular formats in Tables 1 & 2.
• Visual estimates of manganese mineralisation have been estimated
by trained and experienced mineral exploration geologists on the rig
and reviewed by the Competent Person on site in chip trays. Visual
estimates are included as Table 2 in the body of the release.
The reader is reminded that Visual estimates of mineral abundance
should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties
relevant to valuations.
The visually observed manganese mineralisation is not representative
of the entire Kuro Prospect, with drilling currently on-going to further
assess the distribution of manganese. Representative drill samples
are being routinely collected from the drill rig and will be analysed at
ALS laboratories and reported in due course (expected 4-6 week turn
around).
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
• Drill testing was undertaken by Reverse Circulation (RC) with face
sampling drill bit, drill cuttings are returned to surface via inner tubes
in the drill string.
• RC drill cuttings were collected at 1m intervals down the length of each
hole. Sampling was completed from a gated cyclone over a static cone
splitter into a calico bag with an average sample weight of 2.5kg per
1m sample. The remainder of the drill cuttings were collected in green
bags and laid out in rows on a sample pad beside the drill rig.
• Individual samples were then composited from the green bags as
described in a subsequent section. The sampling protocol is common
practice for RC drilling and considered appropriate for the stage of
exploration.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
• Whether a relationship exists between sample
• Reverse Circulation drilling recoveries have been good with
consistency between green bag (and calico split) sizes.
• Duplicate samples were collected from the rig every 50m, with
duplicate pair weights monitored to check the performance of the
10
Criteria JORC Code explanation Commentary
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
cyclone and cone splitter.
• Sample recovery was consistent across the program with the same
drill rig and mostly the same driller operating the drill rig and
maintaining constant drilling conditions with the equipment, including
monitoring bit wear, air return, and cyclone performance.
• A cone splitter was used on the drill rig which theoretically gives an
even and impartial split of the sample when operated correctly.
Adjustable control gates allow the sample size to be calibrated to suit
the ground conditions and target sample size. These measures are
best practice in producing representative samples.
• There is no observed relationship between sample recovery and
observed mineralisation.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• Chip trays have been collected for the entire length of each hole,
logged, and photographed.
• Logging has been completed on all drill chips and is qualitative.
• Logging covers the entire drilled length of each hole.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• RC cuttings were collected during drilling as described above with the
primary bulk sample captured in a green bag and placed in rows of 20
on the ground immediately adjacent the drill rig.
• All holes were sampled as a combination of 1m rig splits and 4m
composites by the method described below.
• From each primary sample pile, material for assay was collected with
a ‘Fiskers nyglass potting scoop’ by rotary sampling, that is, starting at
the outside base of each pile, pushing toward the centre, then drawing
up to the peak, this ensures a representative sample is collected.
• Field duplicates have been collected at each 50th sample interval to
monitor sample size and provide duplicate material for assay analysis
and representivity analysis.
• The sample size and subsampling method is considered appropriate.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model, reading
times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias)
and precision have been established.
• All drill samples were, or are being, analysed by Australian Laboratory
Services Pty Ltd (ALS) in Western Australia using:
o ME-XRF26s which consists of a Lithium Borate Fusion and X-Ray
Fluorescence Spectroscopy analysis. This method is suitable for
the determination of major and minor elements in ore samples
which require a high dilution digest such as Chromite and high
Manganese ores.
o Fire assay with AAS finish (Au-AA25, 30g), and
o Four-acid digest with ICP-MS (ME-MS61, 48 elements).
These are considered industry-standard and appropriate methods
• Appropriate standards were inserted at a frequency of one per 50
samples.
• Duplicate samples were provided from either rig or field sampling at a
rate of every 50th sample.
• ALS laboratory also insert standards as internal checks.
11
Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• A minimum of two experienced exploration geologists has reviewed
the visual estimates of manganese mineralisation outlined in this
announcement, including the Competent Person.
• Field data is collected and logged into ruggedised Toughbook laptop
by the supervising geologist. Field data is routinely checked for
accuracy and completeness by the geologist, with further checks once
the data is forwarded to the database manager. Any errors or
omissions reported by the database manager are verified and
corrected by the geologist with the corrected data returned to the
database manager for import and safe storage.
• Data management consultants compile the data into a relational SQL
database, hosted in a secure data centre, which enforces data integrity
and ensures that the data meets the required validation protocols.
Assay certificates are loaded directly from the laboratory supplied files
to the SQL database, to prevent data transcription errors, with routine
quality control monitoring to ensure the accurate performance of the
assay data.
Location of
data points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Location of drill collars were recorded using a handheld GPS which is
considered appropriate at this stage of exploration.
• Grid projection system has been standardised in the database to
GDA2020 MGA zone 52
• Surface RL data is collected using GPS, which is then projected to an
SRTM DTM to improve accuracy. This is considered appropriate for
this stage of exploration.
Data spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• Figures are provided within the body of the announcement that show
all collar locations and spacing. This data is also provided in a tabular
format.
• Drillhole spacing is considered appropriate for the stage of exploration.
Further drilling is required to establish continuity that may lead to the
estimation of a Mineral Resource.