June 2025 Quarterly Activities Report
Expanded drilling program underway at Christmas Creek, comprising both diamond and RC
drilling; Initial assays expand gold mineralisation at Martin, with high-grade hits in multiple holes
Highlights
Christmas Creek Gold & Rare Earths Project, WA
•
•
High-impact drill program commenced in early June, initially comprising RC drilling at the
Martin prospect to target extensions to previously reported high-grade intervals in drillhole 24XRC097, including:
o
10m @ 12.66g/t Au from 59m; and
o
10m @ 7.34g/t Au from 94m
Initial batch of RC assays reported in mid-July, with assays extending the zone of high-grade
mineralisation intersected last year. Assays include:
o
4m @ 14.18g/t Au from 43m in hole 25XCRC001, including 2m @ 27.95g/t Au;
o
3m @ 6.17g/t Au from 94m in hole 25XCRC005, including 2m @ 9.20g/t Au; and
o
3m @ 2.15g/t Au from 78m in hole 25XCRC003
•
Heritage surveying recently completed, paving the way to test additional targets during the
current drilling program including Turner, Zahn and Coogan-Brockhurst.
•
Drilling program subsequently expanded to include diamond drilling to allow for deeper
exploration targeting and to obtain detailed structural information to better understand
the controls on the gold mineralisation at Christmas Creek.
•
The diamond rig arrived on site in early July, with drilling now underway at Martin.
•
Extensive gold nugget field discovered at the Turner Prospect, with nuggets discovered at
surface within a 600m x 200m area.
Corporate
•
Successful $3.5M share placement completed to fast-track drilling at Christmas Creek.
•
Co-funding grant of up to $180,000 secured through the WA Government’s Exploration
Incentive Scheme (“EIS”) for drilling at the Martin and Zahn Prospects at Christmas Creek.
•
Cash position at 30 June 2025 of $3.77 million.
Overview
Trek Metals’ CEO Derek Marshall said the June Quarter had been an extremely busy and exciting period
for the Company, marked by the start of a major new drilling program at the Christmas Creek Project:
“It’s been another very active quarter for Trek, with our exploration team mobilising to site in May
to undertake detailed ground gravity, passive seismic and drone magnetics surveys, before kicking
off a major new round of drilling last month.
“The surveys were designed to provide us with a comprehensive dataset to help build our
understanding of the structure of the geology and the distribution of the gold-bearing veins to
assist with exploration planning and future drill targeting.
“The Reverse Circulation rig commenced drilling in early June, with an initial focus on the highpriority Martin prospect to test for extensions to the high-grade intervals received from our maiden
drilling program in late 2024, which included 10m @ 12.66g/t Au from 59m and 10m @ 7.34g/t
Au from 94m.
“Initial assays from this drilling were reported in mid-July, with high-grade gold hits recorded in
four of the first five holes. This represents a tremendous start to the drilling program and confirms
we are in a fertile gold environment.
“We also made the decision to expand the drilling program to include diamond drilling in parallel
with the planned RC holes, with our diamond drilling contractor, DDH1, arriving on site in early
July. Diamond drilling will enable us to target deeper mineralisation and will also provide important
structural information to continue building our knowledge of the controls to gold mineralisation.
“Following the completion of drilling at Martin, the current program will also test the Turner, Zahn
and Coogan-Brockhurst targets. The Turner target has emerged as an exciting new target during
the Quarter, with the delineation of a gold nugget field extending over an area of 600 metres by
200 metres.
“The ongoing drilling program is well funded following the completion of a well-supported $3.5
million share placement during the Quarter, as well as a successful application for drilling cofunding under the WA Government’s Exploration Incentive Scheme.
“We look forward to rapidly unlocking the potential of the emerging discovery at the Christmas
Creek Project over the coming months.”
Christmas Creek Project (Kimberley, Western Australia)
Located south-west of Halls Creek, the Christmas Creek Project comprises a previously unexplored,
largely concealed district-scale gold and rare earths exploration opportunity in the Kimberley region of
WA associated with major continental-scale tectonic lineament intersections (Figure 1).
Trek completed the acquisition of the Christmas Creek Project which was previously part of Newmont
Exploration Pty Ltd’s (Newmont) global exploration portfolio in the December 2023 Quarter. The
Company has also secured additional tenement applications to add to this district-scale greenfields gold
and rare earths exploration project.
2
Figure 1: Continental-scale context and location map for the Christmas Creek Project, located at the intersection of G3 and G5
metallogenic lineament corridors, potentially representing the intersection of the Granites-Tanami Orogen & the Halls Creek
Orogen.
During the Quarter, Trek undertook ground gravity, passive seismic and drone magnetic surveys at the
Christmas Creek Project, before commencing a major drilling program at the Project in early June.
The surveys were conducted to provide a comprehensive set of data to build the sub-surface geological
framework that will be critical to understanding the location and distribution of gold-bearing veins.
RC Drilling Program
Following the completion of pre-drilling heritage and earthworks, the drill contractor, Precision
Exploration, arrived on site in early June to undertake Reverse Circulation (RC) drilling.
The drilling will initially target extensions to the previously reported high-grade intervals at the Martin
target in drill-hole 24XRC097, including:
•
•
10m @ 12.66g/t Au from 59m; and
10m @ 7.34g/t Au from 94m
RC drilling will also target mineralisation at the Zahn and Coogan targets, following up on encouraging
results from the 2024 drilling with intercepts including:
•
•
28m @ 0.18g/t Au from 20m in 24XCRC074, including:
7m @ 0.35g/t Au from 26m, with 1m @ 0.65g/t Au from 29m
3
Preliminary assays were reported for the first five RC holes subsequent to the end of the Quarter, with
four of the five holes intersecting significant gold mineralisation. The initial results are shown in plan
view (Figure 2) and cross-section (Figure 3) below, relative to the 2024 drill intercept, with highlights
from the assay results including:
•
•
•
•
4m @ 14.18g/t Au from 43m in hole 25XCRC001, including 2m @ 27.95g/t Au,
3m @ 6.17g/t Au from 94m in hole 25XCRC005, including 2m @ 9.20g/t Au,
3m @ 2.15g/t Au from 78m in hole 25XCRC003
1m @ 1.5g/t from 106m in hole 25XCRC004
Figure 2: Plan view of new RC drill-holes completed around the high-grade intercept returned last year in 24XCRC097,
highlighting the interpreted dominant stacked vein orientation of SW-NE in solid blue lines, with high-grade gold intersected
in four of the five initial step-out holes drilled in the 2025 field season. An interpreted fault is included as a dashed line. Section
line referring to Figure 3 shown as A-A’.
These initial five RC drill holes were designed as 20 metre step-outs from 24XCRC097. The results
correlate well with the interpretation from down-hole televiewer surveys completed late last year that
the high-grade mineralisation at Martin is hosted in a stacked vein array in a southwest-northeast
orientation (refer Figure 2 above and previous announcement ASX: TKM 19th Feb 2025).
4
This also matches the ~1km NE trend identified in drilling to date at Martin (Figure 4).
Figure 3: Cross-section view to the NE (clip +/-40m) of RC drill-holes around the high-grade intercept returned last year in
24XCRC097, highlighting the interpreted dominant stacked vein being sub-vertical (interpreted to be steeply dipping to the
SE), with high-grade gold intersected in four of the five initial step out holes drilled in the 2025 field season. Refer to Figure 2
for section line shown as A-A’.
The veins are interpreted to be in a sub-vertical orientation based on the gold intercepts in the recent
RC drilling, which confirms the interpretation from the televiewer data in hole 24XCRC097.
However, the new results suggest that the high-grade mineralisation dips steeply to the south-east,
rather than the north-west as previously thought (Figure 3).
These initial holes totalled 830m of drilling (25XCRC001 to 005) and were completed at the Martin
Prospect. Trek would like to acknowledge the support of the West Australian State Government’s
Exploration Incentive Scheme (EIS) as co-contributors towards the current drill program at Christmas
Creek.
The WA Government’s support of the junior minerals industry is greatly appreciated, helping to support
frontier exploration initiatives such as this with the potential to unlock major new gold discoveries.
5
Figure 4: Martin Prospect gold in drilling results, highlighting the two emerging gold trends.
Diamond Drilling
The drilling program at Christmas Creek was subsequently extended to include diamond drilling, with
drill contractor DDH1 engaged to undertake diamond core drilling to allow for deeper exploration
targeting and to obtain detailed structural information relating to gold mineralisation.
The diamond rig arrived on site in mid-July and will initially target the Martin area (Figure 1). The
diamond drilling will be undertaken in parallel with the RC program outlined above.
Figure 5. DDH1 Drilling’s diamond rig on-site at Trek’s Christmas Creek Project.
6
Gold Nugget Field at Turner
During the Quarter, Trek identified a new, highly prospective and undrilled prospect at the Christmas
Creek Project, with the Company’s exploration team discovering a nugget field with over 50 small gold
nuggets (most in the ~0.2-0.4g range) in a favourable geological position at the Turner Prospect, located
30km north-east of Martin.
All nuggets located are wholly within Trek’s granted Exploration Licence E80/4975.
Figure 6: A selection of gold nuggets collected recently by the Trek Metals field crew at the Turner Prospect.
Figure 7: Plan view at the Turner Prospect within E80/4975, highlighting “Nugget Flat” where numerous gold nuggets have
been discovered, location of the gold nuggets found by Trek field personnel, locations of anomalous gold in historic rock chips,
interpreted aplite unit weathering proud and location of the schematic cross-section shown in Figure .
7
Figure 8: Schematic cross-section interpretation of the undrilled Turner prospect showing location of the gold nuggets in
relation to the Aplite ridge with geological interpretation. Section markers A’ & B’ relating to Figure 7 are also shown.
Cautionary Statement: Visual estimates of mineral abundances should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual
estimates also potentially provide no information regarding impurities or deleterious physical properties relevant
to valuations.
The gold nuggets are not likely representative of the entire Turner Prospect at the Christmas Creek Project and
were found in an area of 600m x 200m located wholly within E80/4975. Nugget locations are included in Figures
5 & 6. Further details were provided in the Company’s ASX Announcement dated 3 July 2025.
The gold mineralisation reported in this announcement is in nuggety form and the mineral is visually observed as
native free gold and has not been, and will not be, assayed to confirm purity. TKM notes that the nuggets showing
this metallic colour are typically high in gold purity.
McEwen Hills Niobium Project (West Arunta, Northern Territory)
Trek secured the highly prospective McEwen Hills Niobium Project during the September 2023 Quarter,
located in the heart of the West Arunta Critical Minerals Province. The continued success of WA1
Resources in defining the scale of their Luni Niobium discovery along strike from Trek’s McEwen Hills
Project highlights the potential of the province.
Figure 9: Magnetic imagery highlighting the continuity of the geology across the state border, with the Luni & Crean Nb
carbonatite discoveries of WA1 & ENR on the Western Australian side, and Trek’s McEwen Hills Project (ELA33191) on the
Northern Territory side, of the West Arunta Critical Minerals Province.
8
The tenement application area is located within freehold aboriginal lands of the Lake MacKay Aboriginal
Land Trust and is administered by the Central Land Council. Access and exploration for gold has
previously been completed by Tanami Gold NL, Normandy Gold Exploration (later Newmont) and ABM
Resources, so there is a precedent for access to the land.
Trek attended an on-country meeting with the Traditional Owners of the land underlaying its tenement
application ELA33191 in May 2024. Meeting members of the Lake MacKay Aboriginal Land Trust in
Nyirripi, Northern Territory, represents an important step in the negotiation process and is essential for
the grant of the tenement to occur.
The Company is still awaiting a draft access agreement from the Central Land Council and will update
the market once access has been established.
South Woodie Woodie (Formerly Hendeka) Manganese Project (Pilbara,
Western Australia)
In September 2024, Trek entered into an option and acquisition agreement (“Option and Acquisition
Agreement”) with Advanced Energy Fuels, Inc. (“AEF”) over Trek’s Hendeka Manganese Project in the
Pilbara region of Western Australia.
The Option and Acquisition Agreement gives AEF an option to acquire the Hendeka Project as part of a
proposed North American listing and by making certain payments and sole funding A$2 million of
exploration and development expenditures. The parties have agreed minor amendments to the terms
of the Option and Acquisition Agreement whereby AEF issued 2,000,000 shares from the Option
consideration upfront to Trek and, in return, receive a 12- month extension to the proposed listing date
for AEF to 30 September 2026. In addition the parties agreed that the AEF listing could either be directly
through admission of AEF Shares to a financial market or indirectly through a Reverse Takeover (RTO).
Jimblebar Nickel-Copper-PGE Project (Pilbara, Western Australia)
DevEx Resources (ASX: DEV) is exploring the Jimblebar Project as part of an Earn-in Agreement with
Trek. Both parties have agreed to extend the option period of the earn-in agreement to December 2025.
The project comprises over 200km2 of granted tenements adjacent to known occurrences of copper
sulphide mineralisation at the Copper Knob prospect and chromite at the historical Coobina chromite
mine, on the northern margin of the Silvania Dome in Western Australia.
A SQUID electromagnetic survey was completed subsequent to the quarter end by DevEx with the
results currently being analysed.
Other Projects
After taking into consideration current market conditions and investor sentiment, the Trek Board
resolved to pursue alternative pathways for the following projects, including through potential joint
ventures, external funding arrangements or divestment:
•
•
•
•
Tambourah Lithium Project.
Hendeka Manganese Project – Option Agreement signed.
Jimblebar Ni-Cu Project – Earn-in Agreement signed.
Lawn Hill Base Metals & Uranium Project – Earn-in Agreement signed.
9
This is consistent with Trek’s strategic focus on its high-priority Christmas Creek Gold Project in the
Kimberley region of WA and its McEwen Hills Niobium Project, located along strike from WA1’s worldclass Luni discovery.
CORPORATE
Capital Raising
During the Quarter, Trek completed a strongly supported capital raising of $3.5 million (before costs) to
accelerate exploration at Christmas Creek and for general working capital (Placement).
The Placement comprised the issue of 65 million fully-paid ordinary shares in the capital of the Company
(Shares) at an issue price of $0.05 per Share to existing and new professional and sophisticated
investors, to raise a total of $3.25 million (Tranche One). In addition, Directors Tony Leibowitz and John
Young participated for a total of $0.25 million on the same terms as Tranche One in a second tranche
that was approved by shareholders on 4 July 2025 (Tranche Two). Diversified resources group Patronus
Resources Ltd (ASX: PTN) made a cornerstone $500,000 investment as part of the Placement.
EIS Co-funding Grant
Trek Metals was successful in securing WA Government Exploration Incentive Scheme (“EIS”) co-funding
to support the drilling program currently underway at the Christmas Creek Project.
A co-funded drilling grant of up to $180,000 was secured for drilling at the Martin and Zahn Prospects
at Christmas Creek, supporting the Company’s quest to make major new undercover gold discoveries in
frontier locations.
Cash Position/Expenditure
The Company held cash reserves of $3.77 million at the end of the quarter (Refer Appendix 5B). During
the quarter key expenditure items included:
•
•
Admin & Corporate costs - $147k (including audit fees of $26k and investor relations of $28k)
and;
Staffing Costs – $108k (including Director’s fees of $35k and Corporate and administration
salaries $73k).
During the quarter, the Company made the following payments in relation to exploration activities:
Activity
$000
Drilling and associated expenses
341
Geophysical expenses
62
Exploration staff salaries and wages
210
Other Project expenses
125
Tenement rental, rates and expenses
56
Total as reported in the Appendix 5B
794
10
Payments to Related Parties (Appendix 5B)
During the Quarter, the Company made payments for non-executive directors salaries and fees of $35k.
These payments relate to existing remuneration arrangements (salaries, directors consulting fees and
superannuation). In addition the Company paid Mr Leibowitz $20k as a contribution towards travel,
capital raising expenses and investor relations activities.
Authorised by the Board of Directors
ENDS
For further information contact:
INVESTORS:
MEDIA:
Derek Marshall
Nicholas Read
dmarshall@trekmetals.com.au
info@trekmetals.com.au
0419 929 046
Competent Persons Statement
Hendeka Mineral Resource
The information in this Report contains references to Edge’s 2012 JORC Mineral Resources at the
Hendeka Project and is extracted from Trek’s ASX Release and Public Report of 6 June 2022. The
Company confirms that it is not aware of any new information or data that materially affects the
information included in the relevant market announcement. In the case of estimates of Mineral
Resources or Ore Reserves, the Company confirms that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcements continue to apply and
have not materially changed.
The information in this report relating to Exploration Results is based on information compiled by the
Company’s Chief Executive Officer, Mr Derek Marshall, a Competent Person, and Member of the
Australian Institute of Geoscientists (AIG). Mr Marshall has sufficient experience relevant to the style of
mineralisation and to the type of activity described to qualify as a competent person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves.” Mr Marshall has disclosed that he holds Performance Rights in the Company. Mr Marshall
consents to the inclusion in this announcement of the matters based on his information in the form and
content in which it appears.
11
Tenement Schedule/Movements (ASX Listing Rule 5.3.3)
Location
Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
E45/4909
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/4917
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/4640
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/6240 (application)
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/6664
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/5484
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E45/5839
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/3605
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/3672
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/3983
Western Australia
ACME Pilbara Pty Ltd
100%
100%
*
E52/4051
Western Australia
ACME Pilbara Pty Ltd
100%
100%
E70/6000
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6001
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6004
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6072
Western Australia
ANAHEIM Pty Ltd
100%
100%
E70/6690 (application)
Western Australia
ANAHEIM Pty Ltd
100%
100%
E80/4975
Western Australia
Archer X Pty Ltd
100%
100%
E80/5082
Western Australia
Archer X Pty Ltd
100%
100%
E80/5083
Western Australia
Archer X Pty Ltd
100%
100%
E80/5427
Western Australia
Archer X Pty Ltd
100%
100%
E80/5914
Western Australia
Archer X Pty Ltd
100%
100%
E80/6007 (application)
Western Australia
Archer X Pty Ltd
100%
100%
E80/6010 (application)
Western Australia
Archer X Pty Ltd
100%
100%
E80/6011
Western Australia
Archer X Pty Ltd
100%
100%
E80/6012
Western Australia
Archer X Pty Ltd
100%
100%
*
Northen Territory
TM Resources Pty Ltd
100%
100%
*
Northen Territory
TM Resources Pty Ltd
100%
100%
*
EL31751 (application)
Northen Territory
TM Resources Pty Ltd
100%
100%
EL31752* (application)
Northen Territory
TM Resources Pty Ltd
100%
100%
Tenement
EL31260 (application)
EL31261 (application)
12
Tenement
Location
Registered Holder
Last
Qtr
Interest
Current
Qtr
Interest
E46/616
Western Australia
Edge Minerals Pty Ltd
80%
80%
E46/787
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/835
Western Australia
Bellpiper Pty Ltd
100%
100%
E46/1159
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1160
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1282
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1304
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1387
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46/1521
Western Australia
Edge Minerals Pty Ltd
100%
100%
E46.1542
Western Australia
Edge Minerals Pty Ltd
100%
100%
R46/002
Western Australia
Edge Minerals Pty Ltd
80%
80%
E46/1580 - Application
Westen Australia
Edge Minerals Pty Ltd
100%
100%
M46/549 – Application
withdrawn
Western Australia
Edge Minerals Pty Ltd
80%
0%
M46/550 – Application
withdrawn
Western Australia
Edge Minerals Pty Ltd
80%
0%
EL 33191 (application)
Northern Territory
ELM Resources Pty Ltd
80%
80%
Note: ACME Pilbara Pty Ltd, TM Resources Pty Ltd, Edge Minerals Pty Ltd, Archer X Pty Ltd, Bellpiper Pty Ltd, ELM
Resources Pty Ltd are all 100% subsidiaries of Trek Metals Limited.
*Subject to Earn-in agreements
During the September 2024 Quarter, Trek signed an Option and Acquisition agreement covering the following
tenements – (E46/616, E46/787, E46/835, E46/1159, E46/1160, E46/1282, E46/1304, E46/1387, E46/1521,
E46/1542 & R46/2). For full details refer to the ASX Release dated 10 September 2024
Mining Tenements acquired or disposed during the Quarter
-
M46/549 – Application withdrawn
M46/550 – Application withdrawn
Details of Farm-in or Farm-out agreements entered into during the Quarter
-
Nil
Beneficial Percentage Interests Held in Farm-In or Farm-Out Agreements at the end of the Quarter
As per the table above.
Mining Production and Development Activities
There were no mining production and development activities during the quarter
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TREK METALS LIMITED
ARBN
Quarter ended (“current quarter”)
124 462 826
30 JUNE 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(108)
(108)
(e) administration and corporate costs
(147)
(147)
-
-
14
14
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
GST (net)
4
(51)
4
(51)
1.9
Net cash from / (used in) operating
activities
(288)
(288)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(9)
(9)
(794)
(794)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (net cash on acquisition of
subsidiary)
-
-
2.6
Net cash from / (used in) investing
activities
(803)
(803)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3,250
3,250
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(79)
(79)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
3,171
3,171
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,697
1,697
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(288)
(288)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(803)
(803)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
3,171
3,171
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
-
3,777
3,777
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
3,753
1,674
5.2
Call deposits
24
23
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,777
1,697
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
55
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Current quarter
$A'000
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(288)
8.2
(Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(794)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,082)
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,777
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
3,777
8.7
Estimated quarters of funding available (item 8.6 divided by item 8.3)
3.49
-
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2
Has the entity take