Half Yearly Report and Accounts
Released
Released
Announcement PDF
CONSOLIDATED
FINANCIAL REPORT
FOR THE HALF-YEAR ENDED 30
SEPTEMBER 2024
ABN 18 124 462 826
ASX TKM
CONTENTS
CORPORATE DIRECTORY
2
DIRECTOR’S REPORT
3
REVIEW OF OPERATIONS
4
AUDITORS’ INDEPENDENCE DECLARATION
16
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS
17
CONDENSED CONSOLIDATED STATEMENT OF OTHER COMPREHENSIVE INCOME
18
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION
19
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
20
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS
22
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS
23
DIRECTORS’ DECLARATION
41
INDEPENDENT AUDITOR’S REPORT
42
ASX TKM
CORPORATE DIRECTORY
DIRECTORS
Tony Leibowitz
John Young
Neil Biddle
Valerie Hodgins
Non-Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
EXECUTIVE
Derek Marshall
Chief Executive Officer
COMPANY SECRETARY
Bermuda
Apex Corporate Services Ltd.
Vallis Building, 4th Floor
58 Par-la-Ville Road
Hamilton HM 11
Bermuda
Australia
(Local Agent and Joint Company Secretary)
Russell Hardwick
SHARE REGISTRY
Automic
GPO Box 5193
Sydney NSW 2001
AUSTRALIA
Tel: +61 2 9698 5414
AUDITORS
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Road
Subiaco
WA 6008
WEBSITE
www.trekmetals.com.au
REGISTERED OFFICE OF INCORPORATION
Trinity Hall
43 Cedar Avenue
Hamilton HM 12
Bermuda
REGISTERED OFFICE - AUSTRALIA
Suite 5, 2 Centro Avenue
Subiaco WA 6008
AUSTRALIA
Tel: +61 8 6383 7844
POSTAL ADDRESS
PO Box 8209
Subiaco East WA 6008
Australia
TREK METALS LIMITED | INTERIM REPORT
2
ASX TKM
DIRECTOR’S REPORT
The Directors are pleased to submit the report of Trek Metals Limited (“TKM”, “Trek” or the
“Company Company”) and its controlled entities (“Consolidated Entity” or “Group”) for the half
year ended 30 September 2024.
PRINCIPAL ACTIVITIES
The principal activities of the Company and its subsidiaries (“the Group”) is the identification
and exploration for mineral resources.
RESULTS AND DIVIDEND
The loss for the Group for the half-year ended 30 September 2024 was $3,250,685 which
includes impairment of Exploration and expenditure of $2,568,235 (2023: loss $883,952). The
Directors do not recommend the payment of a dividend.
DIRECTORS
The names of the Company’s directors in office during the half year and until the date of this
report are as below. Directors were in office for the entire period unless otherwise stated.
Tony Leibowitz (Non-Executive Chairman)
Neil Biddle (Non-Executive Director)
John Young (Non-Executive Director)
Valerie Hodgins (Non-Executive Director)
TREK METALS LIMITED | INTERIM REPORT
3
ASX TKM
REVIEW OF OPERATIONS
CHRISTMAS CREEK PROJECT (KIMBERLEY, WESTERN AUSTRALIA)
Located south-west of Halls Creek, the Christmas Creek Project comprises a previously
unexplored, largely concealed district-scale gold and rare earths exploration opportunity in
the Kimberley region of WA associated with major continental-scale tectonic lineament
intersections (Figure 1).
Trek completed the acquisition of the Christmas Creek Project, which was previously part of
Newmont Exploration Pty Ltd’s (Newmont) global exploration portfolio, in the December 2023
Quarter. The Company has also secured additional tenement applications to add to this
district-scale greenfields gold and rare earths exploration project.
Figure 1: Continental scale context and location map for the Christmas Creek Project, located at the
intersection of G3 and G5 metallogenic lineament corridors, potentially representing the intersection of
the Granites-Tanami Orogen & the Halls Creek Orogen.
TREK METALS LIMITED | INTERIM REPORT
4
ASX TKM
Fieldwork programs commenced at the Christmas Creek Project in July, initially comprising soil
sampling and heritage surveys.
Following the completion of these programs, 8,437m of drilling was completed at the
Christmas Creek Project in August and September 2024. The drilling focused on four gold
prospects – Martin, Coogan, Zahn and Willis – which were identified through the integration
and analysis of legacy exploration data, re-processing of geophysical data sets, and the
completion of a targeted soil sampling campaign.
Martin
Historical drilling at the Martin Prospect initially targeted a very large, 4km diameter gold-insoil anomaly under thin cover. Exploration at Martin by previous owner, Newmont, was
restricted to Air Core (AC) drilling and three Reverse Circulation (RC) sections in the central
part of the soil anomaly.
Significant mineralisation was intersected on each RC section, including 7m at 4.9g/t Au
(including 1m at 29.6g/t Au) from 24m in hole NEWXCAC196, 2m @ 9.65g/t Au from 72m in
NEWXCRC012 and 4m @ 1.22g/t from 8m and 3m @ 2.03g/t Au from 137m in NEWXCRC015 1.
Recent assay results from Trek’s maiden drilling have returned two significant high-grade
intercepts in hole 24XCRC097 comprising:
•
•
10m @ 12.66g/t Au from 59m, including:
o 1m @ 32.6g/t Au; and
o 3m @ 29.8g/t Au.
10m @ 7.34g/t Au from 94m, including:
o 2m @ 31.1g/t Au; and
o 1m @ 7.85g/t Au.
Trek’s hole 24XCRC097 was designed to follow up the high-grade intercept of 2m @ 9.65g/t Au
in NEWXCRC012. NEWXCRC012 was the southernmost hole of its drill section and was
unconstrained. 24XCRC097 was drilled as a scissor due to the vein orientation identified in
NEWXCRC012 by down-hole televiewer data (Figure 2). For full result refer ASX Release 31
October 2024 “High grade gold intercepts at Christmas Creek”.
1 Previously announced signi�icant intercepts and collar tables from historical work at Christmas Creek can be found in
Trek’s project acquisition announcement via https://investorhub.trekmetals.com.au/announcements/4421568
TREK METALS LIMITED | INTERIM REPORT
5
ASX TKM
Figure 2 – Cross-section at Martin, highlighting the two significant recent gold intercepts in yellow, the
vein orientation in NEWXCRC012, and an interpreted anticline with an untested associated target zone
below.
The upper zone of mineralisation in 24XCRC097 aligns well with that seen in NEWXCRC012, with
logging of strong silica-sericite alteration, disseminated potassic alteration and millimetrescale veinlets observed in chips from both holes.
Analysis of the drill chips from 24XCRC097 and NEWXCRC012, together with down-hole
televiewer data from hole NEWXCRC012, indicates that a favourable structural position for an
orogenic gold target at Martin sits below the extent of the drilling completed to date and has
not yet been successfully tested. Follow-up exploration is now being planned at Martin,
including down-hole televiewer and petrographic analysis of 24XCRC097 to assist with
structural interpretation ahead of follow-up drilling.
The gold in drilling data from the Martin Prospect suggests there are two dominant mineralised
trends, with one orientated NE-SW and another SE-NW (Figure 3). This, coupled with the large
gold-in-soil anomaly (Figure 4), suggests that there could be a significant orogenic gold
system at Martin.
TREK METALS LIMITED | INTERIM REPORT
6
ASX TKM
Figure 3 – Martin Prospect gold in drilling results highlighting the two emerging gold trends.
Figure 4. Martin Prospect with coloured contoured surface geochemistry over magnetics, showing
recent and legacy drilling highlights. Section markers A & A’ relating to Figure 2 are also shown.
TREK METALS LIMITED | INTERIM REPORT
7
ASX TKM
Zahn
Zahn is a large (>2km across) surface DSG Au anomaly in an area of thin cover. It has the
strongest amplitude of any DSG gold anomaly in the project area but remained unexplained
by limited broad-spaced drill testing when Trek acquired the project.
Assay results from recent drilling at Zahn returned broad intercepts of anomalous gold
mineralisation, with four-metre composite assays including 20m @ 0.21g/t Au from 24m
(24XCRC074) and 8m @ 0.13g/t Au from 52m (24XCRC067). One-metre individual samples will
now be submitted for assay, with representative drill chips from the recent drilling to be sent
for petrographic analysis.
This newly identified zone of gold mineralisation at Zahn will be a key target for the Company’s
next round of drilling.
Coogan
Coogan is a gold-rich mineral system with the central drill target for 2024 defined over >1 km
of strike. Unlike other prospects within the Project, Coogan is in an area of exposed
Paleoproterozoic rocks. Coogan has both a surface geochemical anomaly and locally
outcropping quartz veining where rock chip sampling returned values of up to 3.46g/t Au1.
RC drilling at Coogan intercepted a fertile shear zone with evidence of a hydrothermal gold
system. The interpreted extension of this large shear zone has also recently been tested with
soil sampling, with assay results being interpreted. The shear zone that hosts Coogan, and its
extensions, is clearly a very large and fertile structure. Trek plans to continue targeting along
this structure.
Other Prospects
Willis was defined as a large coherent gold geochemical anomaly in an area of thin cover of a
monotonous sand plain. In-fill DSG sampling completed in 2022 confirmed a large 3 x 1.5km
anomaly, with a central coherent core of 1.5km length. A line of drilling at Willis through the
strongest part of the anomaly did not return any significant results.
A coherent anomaly of a limited REE assay suite has been identified to the south of the Zahn
gold target, 13km west of RareX’s (ASX: REE) Cummins Range REE deposit. Comprising elevated
Ce + La + Y, the Zahn South target is a large (2.7km x 900m) elongate ENE trending geochemical
anomaly. A single line of drilling across the Zahn South REE target did not return any significant
results.
TREK METALS LIMITED | INTERIM REPORT
8
Next Steps
ASX TKM
The focus is now to determine the controls on the distribution of high-grade gold mineralisation
at Martin and generate/refine robust drill targets across the Christmas Creek Project. Of
immediate importance is:
•
•
•
•
•
•
Down-hole televiewer and structural interpretation.
Geochemical analysis of 1m split samples from anomalous 4m composite samples.
Petrology on mineralised samples and host rocks.
Full geochemical review and interpretation.
Petrophysical/geochemical back calculations to determine whether Induced
Polarisation could be an effective technique for detecting significant quantities of gold
mineralisation.
Finalise interpretation of the recently received composite soil sampling data, including
submitting primary samples for assay based on highly anomalous composite samples.
This next round of work is designed to further enhance the Company’s understanding of the
structure and controls over the mineralisation at the Christmas Creek Project, with this
information to support planning for a Phase 2 drilling program targeting a major discovery.
MCEWEN HILLS NIOBIUM PROJECT (WEST ARUNTA, NORTHERN
TERRITORY)
Trek secured the highly prospective McEwen Hills Niobium Project application during the
September 2023 Quarter, located in the heart of the West Arunta Critical Minerals Province. The
continued success of WA1 Resources in defining the scale of their Luni Niobium discovery along
strike from Trek’s McEwen Hills Project highlights the potential of the province.
Trek attended an on-country meeting with the Traditional Owners of the land underlaying its
tenement application ELA33191 in May. Meeting members of the Lake MacKay Aboriginal Land
Trust in Nyirripi, Northern Territory, represents an important step in the negotiation process and
is essential for the grant of the tenement to occur. As part of this application process, the
Company has now commenced negotiations with the Central Land Council over an amended
application area detailed below (Figure 5). A high-resolution magnetic-radiometric survey
was completed by Thomsonair over this area with the data currently being processed prior to
full interrogation and target generation / additional geophysical survey planning. The
combination of gravity and magnetic geophysical data are two of the key datasets used to
target intrusion-related deposits (e.g., IOCG and carbonatite-related mineralisation).
TREK METALS LIMITED | INTERIM REPORT
9
ASX TKM
Figure 5: Magnetic imagery highlighting the continuity of the geology across the state border, with the
Luni & Crean Nb carbonatite discoveries of WA1 & ENR on the Western Australian side, and Trek’s
McEwen Hills Project application (ELA33191) on the Northern Territory side, of the West Arunta Mineral
Province.
PINCUNAH PROJECT (PILBARA, WESTERN AUSTRALIA)
The Pincunah Project, which includes the Valley of the Gossans (VOG) & Champagne Pool
Prospects, (E45/4909 & E45/4917) is located 100km south of Port Hedland and proximal to
numerous operating mines, including Pilgangoora (Pilbara Minerals), Iron Bridge (FMG) and
Abydos (Atlas).
Trek has been active at the Pincunah Project since 2020 with a drilling program completed in
2021 that highlighted the potential for a large-scale base metal system (refer ASX: TKM 13th
October 2021). The drilling at VOG intersected multiple horizons of mineralisation and alteration,
with highly anomalous zinc, copper and silver, plus multiple pathfinder elements indicating an
active mineral system.
Subsequent to the drilling, Trek completed an airborne EM survey and extended surface
geochemistry to cover the EM targets, with assay results confirming coincident EM and
geochemical anomalies. The surface geochemistry results significantly upgrade the
prospectivity of airborne EM conductive target ‘A’ (refer ASX: TKM 16th November 2021) as a
compelling target along strike from the VOG discovery.
Ongoing analysis of the surface geochemistry over ‘Conductor A’ has revealed a more
compelling target with the element association consistent with a low temperature epithermal
‘cap’, with the refined target at the prospect renamed ‘Champagne Pool’.
TREK METALS LIMITED | INTERIM REPORT
10
ASX TKM
During the June 2024 Quarter, Trek completed a maiden drilling program at the Champagne
Pool target. This program comprised three drill holes to test the coincident
geochemical/geophysical anomaly that defined the Champagne Pool target. The drilling
intersected dominantly basaltic lithologies, with lenses of ultramafic rock and graphitic shale.
The third hole penetrated a shear zone that separates the basaltic lithologies from a sequence
of sandstones.
Alteration and mineralisation of pathfinder elements is strongest within the logged graphitic
shale units where porosity and permeability are proposed to have been greater than the
surrounding volcanic rocks, however there is a strong halo around the shale and lithology
boundaries indicating significant fluid flow after deposition of the various units.
Figure 6: Plan view of the Champagne Pool drill results with down-hole Hg, Te & Sb bar graphs,
confirming a bedrock source to the surface geochemical anomalism (shown as dots, refer ASX
26/03/24) and providing a vector towards a potential gold-bearing zone to the West/North-West.
Drill assay results for the pathfinder elements are significantly above the levels seen in the soil
sampling. As shown in Table 2, Mercury (Hg) peaked at 247ppm, with supporting indicator
elements Tellurium (Te) reaching 2.23ppm and Antimony (Sb) 72ppm. The crustal average
abundance of Mercury (Hg) is 0.085ppm (CRC#1) and Tellurium (Te) 0.001ppm (CRC#1), with
ten times these levels considered a significant anomaly.
TREK METALS LIMITED | INTERIM REPORT
11
ASX TKM
Evident in the geochemistry is a trend of increasing temperature and alteration towards the
west, with a plunge component also to the west as shown in Figure 6. Drill-hole 24PNRC003 is
the only hole to contain a high temperature metal association and is therefore considered the
closest to the heat and fluid source of the observed alteration.
The three completed holes and the assay data received, point strongly to an eastward flow of
mineralising fluids and suggest that future exploration should be concentrated to the west of
the drilling (refer to plan view and westward increasing temperature gradient).
OTHER PROJECTS / PARTNERSHIP STRATEGY
After taking into consideration current market conditions and investor sentiment, during the
reporting period, the Trek Board resolved to pursue alternative pathways for the following
projects, including through joint ventures, external funding arrangements or divestment:
•
•
•
•
Tambourah Lithium Project.
Hendeka Manganese Project – Option Agreement signed.
Jimblebar Ni-Cu Project – Earn-In Agreement signed.
Lawn Hill-Murphy West Uranium Project – Earn-In Agreement signed.
EARN-IN AGREEMENTS WITH DEVEX RESOURCES
During the June Quarter, Trek signed two Earn-in Agreements with subsidiaries of DevEx
Resources Limited (ASX: DEV) for an option to earn-in to the Jimblebar Nickel-Copper Project
in the Pilbara region of Western Australia and to progress the Lawn Hill-Murphy West Uranium
Project, NT.
The agreements give DevEx the option to farm-in to these high-potential projects by sole
funding exploration expenditure, bringing their considerable technical expertise and funding
capability. DevEx, which is chaired by prominent mining entrepreneur Tim Goyder, is exploring
a district-scale uranium project in the Northern Territory as well as a pipeline of rare earths,
nickel and copper projects around Australia.
Material terms of the Earn-in Agreements with DevEx Resources include:
Jimblebar Project
Green Critical Resources Pty Ltd (subsidiary of DevEx Resources Ltd) (“GCR”)
•
GCR paid Trek A$50,000 up front for an exclusive 12-month option to explore the
Jimblebar Project (Tenements E52/3605, E52/3672, E52/3983 and E52/4051);
•
GCR commits to spending a minimum of A$100,000 on the Tenements during the
option period;
TREK METALS LIMITED | INTERIM REPORT
12
ASX TKM
•
Following completion of the option period, DEV may elect to earn-in to the Jimblebar
Project for a 75% Joint Venture (“JV”) interest by sole funding exploration expenditure
of not less than A$3,000,000 on the Tenements within 5 years;
•
If DEV earns its 75% JV interest, Trek will be free-carried for its share of JV expenditure
until the completion of a Bankable Feasibility Study; and
•
Standard dilution clauses will apply upon a joint venture being formed. Should a party’s
interest dilute to below 10% it shall automatically convert to a 1.5% net smelter royalty.
Lawn Hill – Murphy West Project (Applications)
G E Resources Pty Ltd (subsidiary of DevEx Resources Ltd) “(GER”)
•
•
GER paid a non-refundable option payment of $50,000 on the commencement to TKM;
GER to manage the tenement applications (EL31752, EL31751, EL31260 and EL31261)
through to grant;
•
•
GER to make a payment of $50,000 to Trek upon the grant of the first Tenement;
Following grant of the tenements, GER has the right to earn a 80% interest in all minerals
associated with the Tenement applications, by spending $2 million on Exploration
expenditure in the four years from the grant of all tenements, after which time, TKM will
be free-carried to completion of a Bankable Feasibility Study;
•
GER to assume 100% of the existing contingent obligations to the prior owners of EL31260
and EL 31261 (Lawn Hill applications); and
•
Standard dilution clauses will apply upon a joint venture being formed. Should a party’s
interest dilute to below 10% it shall automatically convert to a 1.5% net smelter royalty.
OPTION AGREEMENT TO DIVEST THE HENDEKA MANGANESE PROJECT
During the September Quarter, Trek signed an Option Agreement to divest the Hendeka
Manganese Project in WA’s Pilbara region to Advanced Energy Fuels, Inc (AEFI). The Option and
Acquisition Agreement gives AEFI an option to acquire the Hendeka Project as part of a
proposed US listing and by making certain payments and sole funding A$2 million of
exploration expenditure.
AEFI is a private US company leveraging the transition to clean energy through the
development of critical minerals projects in Australia and the USA. The company is focused on
US battery supply chains and is planning to list within the next 12 months.
Material Terms of the Option and Acquisition Agreement include:
•
•
AEFI has paid an option fee of A$50,000 for an exclusive option to acquire the Hendeka
Project (“Option”).
If AEFI exercise the Option, it will acquire Trek subsidiaries Edge Minerals Pty Ltd and
Bellpiper Pty Ltd that hold the tenements that make up the Hendeka Project.
TREK METALS LIMITED | INTERIM REPORT
13
ASX TKM
•
•
•
•
•
•
•
AEFI can exercise the Option anytime up until 30 September 2027 (“Option Period”)
subject to meeting the payments and exploration expenditure set out below.
AEFI to pay A$450,000 on the proposed listing of AEFI on or before 30 September 2025.
Upon listing, AEFI to issue 8,000,000 Shares or that number of AEFI Shares which
represents, on the listing of AEFI, not less than 20% of the total issued capital of AEFI on
a fully-diluted basis up to a maximum value of A$4,000,000.
As part of the Option, AEFI to also spend at least A$2,000,000 on the Hendeka Project,
including meeting minimum expenditures to maintain the tenements in good standing.
AEFI shall also be the operator of the Hendeka Project for the duration of the Option
Period.
Pursuant to a separate investor rights agreement signed on the date of the Option and
Acquisition Agreement, Trek has the right but not the obligation to appoint one Director
to AEFI as well as customary participation and information rights in AEFI.
The Hendeka Project covers tenements – E46/616, E46/787, E46/835, E46/1159, E46/1160,
E46/1282, E46/1304, E46/1387, E46/1521, E46/1542 & R46/2.
The Option and Acquisition Agreement contains other customary terms for an
agreement of this nature including representations and warranties and termination
rights.
CORPORATE
Financial Summary
The net operating loss for the period was $3,250,685 (2023: $883,952). Key expenditure items
in the half year results included:
- Share based payments – $139,772
- Exploration and Evaluation expenditure impaired - $2,568,235
Included in investing activities were cash payments for Exploration and Evaluation
expenditure (capitalised) during the half-year of $1,874,091.
Cash Position/Expenditure
The Company held cash reserves of $2.8 million at the end of the reporting period.
Events Subsequent to reporting date
On 4 October 2024, the Company issued 20,000,000 Performance Rights to the Chief Executive
Officer, management and staff in accordance with Employee incentive plan approved by
shareholders.
Other than as detailed above, no other matters or circumstances have arisen since the end of
the financial year which significantly affected or may significantly affect the operations of the
Group, the results of those operations, or the state of affairs of the Group in subsequent
financial years.
TREK METALS LIMITED | INTERIM REPORT
14
ASX TKM
Auditor’s Independence Declaration
The lead Auditor’s Independence Declaration is set out on page 16 for the half year ended 30
September 2024. This report is signed in accordance with a resolution of the Board of Directors.
Competent Person Statement
The information in this report relating to Exploration Results is based on information compiled
by the Company’s Chief Executive Officer, Mr Derek Marshall, a competent person, and Member
of the Australian Institute of Geoscientists (AIG). Except where explicitly stated, this report
contains references to prior exploration results, all of which have been cross-referenced to
previous market announcements made by the Company. The Company confirms it is not
aware of any new information or data that materially affects the information included in the
relevant market announcements. Mr Marshall has sufficient experience relevant to the style of
mineralisation and to the type of activity described to qualify as a competent person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.” Mr Marshall has disclosed that he has an interest in Shares and
Performance Rights in the Company. Mr Marshall consents to the inclusion in this
announcement of the matters based on his information in the form and content in which it
appears.
Signed on behalf of the Board.
John Young
Director
Dated: 27 November 2024
TREK METALS LIMITED | INTERIM REPORT
15
To the Board of Directors
Auditor’s Independence Declaration
As lead audit Director for the review of the financial statements of Trek Metals Limited for the
financial period ended 30 September 2024, I declare that to the best of my knowledge and belief,
there have been no contraventions of the auditor independence requirements of any applicable
code of professional conduct in relation to the audit.
Yours faithfully,
HALL CHADWICK WA AUDIT PTY LTD
Dated at Perth this 27th day of November 2024
MARK DELAURENTIS CA
Director
ASX TKM
CONDENSED CONSOLIDATED STATEMENT OF
PROFIT OR LOSS
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2024
HALF-YEAR
ENDED
30 SEPTEMBER
2024
$
HALF-YEAR
ENDED
30 SEPTEMBER
2023
$
4
4
14
62,913
157,302
(139,772)
(104,480)
62,341
57,017
(363,516)
(25,541)
7
(2,568,235)
(8,012)
(650,401)
35,040
(9,142)
(640,151)
(3,250,685)
-
(883,952)
-
(3,250,685)
(883,952)
Cents/share
Cents/share
(0.633)
(0.633)
(0.206)
(0.206)
NOTES
Continuing Operations
Investment revenue
Other income
Share based payment expense
Exploration and Evaluation expenditure
Exploration and Evaluation expenditure
(impaired)/reversal
Finance costs
Other operating expenses
4
Profit/(loss) before tax
Income tax expense
Profit/(loss) for the period
(3,250,685)
Attributable to:
Equity holders of the Parent
Earnings/(Loss) per share for
profit/(loss) from continuing operations
attributable to the ordinary equity
holders of the Parent:
Basic earnings/(loss) per share
Diluted earnings/(loss) per share
5
5
(883,952)
Notes forming part of these financial statements are included on pages 23 to 40
TREK METALS LIMITED | INTERIM REPORT
17
ASX TKM
CONDENSED CONSOLIDATED STATEMENT OF
OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2024
NOTES
Profit/(loss) for the period
Other comprehensive income
Items that may not be reclassified
to profit or loss
Changes in fair value of financial
assets through Other
Comprehensive Income
Total Comprehensive Loss for the
Period Attributable to Owners of
the Company
HALF-YEAR ENDED
30 SEPTEMBER
2024
$
HALF-YEAR ENDED
30 SEPTEMBER
2023
$
(11,026)
(45,000)
(3,261,711)
(928,952)
(3,250,685)
(883,952)
Notes forming part of these financial statements are included on pages 23 to 40
TREK METALS LIMITED | INTERIM REPORT
18
ASX TKM
CONDENSED CONSOLIDATED STATEMENT OF
FINANCIAL POSITION
AS AT 30 SEPTEMBER 2024
NOTES
ASSETS
Current Assets
Cash and cash equivalents
Trade and other receivables
Other assets
6
30 SEPTEMBER
2024
$
31 MARCH
2024
$
2,838,873
151,845
111,741
5,552,999
151,531
35,545
Total current assets
3,102,459
5,740,075
Non-current Assets
Property, plant and equipment
Right of Use assets
Exploration and evaluation expenditure
Financial assets
352,119
47,105
11,824,269
75,000
255,966
59,489
12,432,208
86,026
7
Total non-current assets
Total Assets
LIABILITIES
Current Liabilities
Trade and other payables
Lease liabilities
Provision
Shares Payable
12,298,493
12,833,689
407,153
27,652
75,045
500,000
471,310
28,844
49,094
500,000
15,400,952
9
10
18,573,764
Total current liabilities
1,009,850
1,049,248
Non-current Liabilities
Lease liabilities
24,125
35,600
Total non-current liabilities
24,125
35,600
Total Liabilities
1,033,975
1,084,848
NET ASSETS
14,366,977
17,488,916
38,289,209
62,387,651
(86,309,883)
38,281,358
62,301,556
(83,093,998)
Equity
Issued capital
Reserves
Accumulated loss
11
Total Equity
14,366,977
17,488,916
Notes forming part of these financial statements are included on pages 23 to 40
TREK METALS LIMITED | INTERIM REPORT
19
ASX TKM
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2024
Consolidated
Issued
Capital
Note
Balance at 1 April 2024
Asset
Revaluation
Reserve
Accumulated
Losses
Total Equity
$
(54,000)
$
(83,093,998)
$
17,488,916
$
60,694,802
-
-
-
(11,026)
(3,250,685)
-
(3,250,685)
(11,026)
-
-
-
(11,026)
(3,250,685)
(3,261,711)
7,851
-
18,091
-
(25,942)
139,772
(34,800)
-
34,800
139,772
-
Total comprehensive income
for the year
Balance at 30 September 2024
Share Based
Payments
Reserve
$
38,281,358
Loss for the year
Other comprehensive income
Transactions with owners,
recorded directly in equity
Performance rights exercised
Share based payments
Expiry of share options
Share Premium
Reserve
14
38,289,209
60,712,893
$
1,660,754
1,739,784
(65,026)
(86,309,883)
14,366,977
Notes forming part of these financial statements are included on pages 23 to 40
TREK METALS LIMITED | INTERIM REPORT
20
ASX TKM
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2023
Consolidated
Note
Balance at 1 April 2023
Issued
Capital
Share
Premium
Reserve
$
35,897,520
$
54,668,857
$
1,851,485
-
-
-
-
-
(883,952)
(883,952)
-
-
-
-
(45,000)
-
(45,000)
-
-
-
-
(45,000)
(883,952)
(928,952)
2,399,372
5,160,628
-
-
-
-
7,560,000
79,643
-
187,557
-
(33,400)
363,516
(65,000)
-
-
65,000
233,800
363,516
-
(454,978)
-
-
(2,560,563)
-
-
2,560,563
-
(454,978)
37,921,557
60,017,042
2,116,601
-
(45,000)
(82,599,305)
17,410,895
Loss for the year
Other comprehensive
income
Total comprehensive
income for the year
Transactions with owners,
recorded directly in equity
Issue of ordinary shares
Issue of ordinary shares on
exercise of share options
Share based payments
Expiry of share options
Transfer Foreign Currency
reserve to Accumulated
Losses
Share issue expenses
Balance at 30 September
2023
14
Share Based
Payments
Reserve
Foreign
Currency
Translation
Reserve
Asse
Share your feedback
Discover