Half Yearly Report and Accounts
Released
Released
Announcement PDF
Consolidated
Financial Report
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
ASX TKM
CONTENTS
CORPORATE DIRECTORY 2
DIRECTOR’S REPORT 3
REVIEW OF OPERATIONS 4
AUDITORS’ INDEPENDENCE DECLARATION 19
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS 20
CONDENSED CONSOLIDATED STATEMENT OF OTHER COMPREHENSIVE INCOME 21
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION 22
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY 23
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS 25
NOTES TO THE CONDENSED CONSOLIDATED FINANCIAL STATEMENTS 26
DIRECTORS’ DECLARATION 44
INDEPENDENT AUDITOR’S REPORT 45
ASX TKM
2
TREK METALS LIMITED | INTERIM REPORT
CORPORATE DIRECTORY
DIRECTORS
Tony Leibowitz
John Young
Neil Biddle
Andrew Reece
Non-Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
SHARE REGISTRY
Automic
GPO Box 5193
Sydney NSW 2001
AUSTRALIA
Tel: +61 2 9698 5414
EXECUTIVE
Derek Marshall Chief Executive Officer
COMPANY SECRETARY
Bermuda
Apex Corporate Services Ltd.
Vallis Building, 4th Floor
58 Par-la-Ville Road
Hamilton HM 11
Bermuda
Australia
(Local Agent and Joint Company Secretary)
Russell Hardwick
AUDITORS
Hall Chadwick WA Audit Pty Ltd
283 Rokeby Road
Subiaco
WA 6008
WEBSITE
www.trekmetals.com.au
REGISTERED OFFICE OF INCORPORATION
Trinity Hall
43 Cedar Avenue
Hamilton HM 12
Bermuda
REGISTERED OFFICE - AUSTRALIA
Suite 5, 2 Centro Avenue
Subiaco WA 6008
AUSTRALIA
Tel: +61 8 6383 7844
POSTAL ADDRESS
PO Box 8209
Subiaco East WA 6008
Australia
ASX TKM
3
TREK METALS LIMITED | INTERIM REPORT
DIRECTOR’S REPORT
The Directors are pleased to submit the report of Trek Metals Limited (“TKM”, “Trek” or the
“Company Company”) and its controlled entities (“Consolidated Entity” or “Group”) for the half
year ended 30 September 2025.
PRINCIPAL ACTIVITIES
The principal activities of the Company and its subsidiaries (“the Group”) is the identification
and exploration for mineral resources.
RESULTS AND DIVIDEND
The loss for the Group for the half-year ended 30 September 2025 was $4,902,690 which
includes impairment of Exploration and expenditure of $3,907,035 (2024: loss $3,250,685). The
Directors do not recommend the payment of a dividend.
DIRECTORS
The names of the Company’s directors in office during the half year and until the date of this
report are as below. Directors were in office for the entire period unless otherwise stated.
Tony Leibowitz (Non-Executive Chairman)
Neil Biddle (Non-Executive Director)
John Young (Non-Executive Director)
Andrew Reece (Non-Executive Director) appointed 2 December 2025
ASX TKM
4
TREK METALS LIMITED | INTERIM REPORT
REVIEW OF OPERATIONS
The six months to 30 September 2025 have marked one of the busiest periods of exploration
activity in Trek Metals Limited’s (“Trek” or “the Company”) recent history, with the completion of
diamond and reverse circulation drilling at the Christmas Creek Project, located in the
Kimberley region of Western Australia, to follow-up the potential for a major gold discovery.
The Christmas Creek Project, which was acquired by Trek in October 2023, represents a district-
scale exploration opportunity, associated with a major continental-scale tectonic lineament
intersection. The Project previously formed part of Newmont’s suite of exploration assets, with
the tenements thought to represent a potential extension of the prolific Granites-Tanami
Orogen, with metasediments in the area showing a correlation to the geological sequences
that host Newmont’s globally significant Tanami Gold Mine.
During the reporting period, Trek completed an expanded Phase 2 Reverse Circulation and
diamond drilling program at Christmas Creek, with a total of 10,169.4m drilled across 75 holes.
The drilling tested multiple large-scale targets for different mineralisation styles, including
orogenic gold at the Martin, Zahn and Turner targets, and intrusion-related copper-gold at
Coogan, Brockhurst and Jobs.
Assays for the first five RC holes at the Martin Prospect successfully extended the mineralisation
identified in 2024 drilling, with four of the five holes intersecting significant gold mineralisation.
Additional RC assays and visual analysis of diamond core was reported subsequent to the end
of the reporting period (Refer ASX Release 21st
October 2025).
The results returned to date indicate that the Christmas Creek Project is highly prospective for
large-scale gold and copper-gold deposits, with the Company’s understanding of the
geological, geochemical and geophysical picture of the predominantly undercover bedrock
geology being enhanced through each exploration activity.
ASX TKM
5
TREK METALS LIMITED | INTERIM REPORT
CHRISTMAS CREEK PROJECT (KIMBERLEY, WESTERN AUSTRALIA)
Figure 1: Continental scale context and location map for the Christmas Creek Project, located at the intersection of G3 and
G5 metallogenic lineament corridors, potentially representing the intersection of the Granites-Tanami Orogen & the Halls
Creek Orogen.
Located south-west of Halls Creek, the Christmas Creek Project comprises a previously
unexplored, largely concealed district-scale gold and rare earths exploration opportunity in
the Kimberley region of WA associated with major continental-scale tectonic lineament
intersections (Figure 1). During the reporting period, Trek undertook ground gravity, passive
seismic and drone magnetic surveys at the Christmas Creek Project, before commencing a
major Phase 2 drilling program at the Project in June.
PHASE 2 DRILLING PROGRAM
Trek completed an expanded Phase 2 Reverse Circulation and diamond drilling program at
Christmas Creek during the reporting period, with a total of 10,169.4m drilled across 75 holes.
ASX TKM
6
TREK METALS LIMITED | INTERIM REPORT
The drilling tested multiple large-scale targets for different mineralisation styles, including
orogenic gold at the Martin, Zahn and Turner targets, and intrusion-related copper-gold at
Coogan, Brockhurst and Jobs.
Martin
Martin continues to show all the hallmarks of a classic, large-scale orogenic gold system, with
diamond core identifying two distinct mineralisation styles – interpreted high-grade stacked
quartz vein style and a broader style with fracture-controlled wall rock alteration.
Two diamond holes (Figure 4) were completed as part of the 2025 drilling campaign as twins
to two previously drilled Reverse Circulation (RC) drill-holes 24XCRC097 (ASX:TKM 31st
October
2024 https://trekmetals.com.au/announcements/6605930) and NEWXCRC015 (ASX:TKM 11th
October 2023, https://trekmetals.com.au/announcements/4421568) at the Martin Prospect.
These previously reported RC holes returned the following intercepts:
• 10m at 12.66g/t Au from 59m and 10m at 7.34g/t Au from 94m in hole 24XCRC097
• 4m @ 1.22g/t Au from 8m, 27m @ 0.26g/t Au from 87m, and 3m @ 2.03g/t Au from 137m
in hole NEWXCRC015
Assay results have been received from sampling of the two twin holes with a full list of
significant intercepts included in the Company’s ASX Announcement dated 17 November 2025.
Highlights include:
• 0.3m @ 34.5g/t Au from 45.9m in hole 25XCDD001
• 4.9m @ 1.57g/t Au from 89.1m in hole 25XCDD001
• 5.3m @ 2.12g/t Au from 96.0m in hole 25XCDD001, inc. 3.1m @ 3.53g/t Au from 97m
• 9.3m @ 1.95g/t Au from 41.6m in hole 25XCDD002, inc. 0.9m @ 12.85g/t Au from 41.6m
• 1.5m @ 4.02g/t Au from 149m in hole 25XCDD002, inc. 0.5m @ 11.3g/t Au from 150m
• 2.3m @ 2.95g/t Au from 155.2m in hole 25XCDD002
These results provide a high level of detail as to which veins are mineralised and will allow for
a fully informed structural interpretation of the diamond drill core to be undertaken.
A detailed structural review is scheduled to commence in the coming weeks with an expert
consultant. The outcome of this work will inform the 3D interpretation of the mineralised vein
arrays and assist with drill targeting for the next round of exploration drilling at Christmas Creek.
ASX TKM
7
TREK METALS LIMITED | INTERIM REPORT
Figure 2. Cross-section oriented North-South (view West, refer Figure 5 for section line) showing previous and new significant
intercepts (in yellow) and interpreted gold bearing vein network.The gold system is interpreted to be open at depth and along strike,
with significant upside potential.
ASX TKM
8
TREK METALS LIMITED | INTERIM REPORT
Figure 3. Martin Prospect plan view showing drill collars, traces, significant intercepts (with newly reported in yellow), and drill
cluster around previously reported high grade results in 24XCRC097 and NEWXCRC015. The section line and clip for the section
provided as Figure 4 is also highlighted.
High-grade gold intercepts were also returned from initial step-out holes around 24XCRC097
(ASX:TKM 15th
July 2025, https://trekmetals.com.au/announcements/7054793), with four of the
five step-out holes intersecting gold, including:
• 4m @ 14.18g/t Au from 43m in hole 25XCRC001, including 2m @ 27.95g/t Au
• 3m @ 6.17g/t Au from 94m in hole 25XCRC005, including 2m @ 9.20g/t Au
• 3m @ 2.15g/t Au from 78m in hole 25XCRC003
• 1m @ 1.5g/t from 106m in hole 25XCRC004
Multiple additional holes were subsequently completed in the vicinity of these intercepts
(Figure 4), with new results including:
ASX TKM
9
TREK METALS LIMITED | INTERIM REPORT
• 1m @ 1.54g/t Au from 56m and 4m @ 0.29g/t Au from 144m in hole 25XCRC010
• 8m @ 0.26g/t Au from 64m in 25XCRC017
• 4m @ 0.55g/t Au from 32m and 3m @ 0.35g/t Au from 48m and 1m @ 1.35g/t Au from
55m in 25XCRC040
Importantly, 25XCRC040 was drilled approximately 200m to the north-east from the main drill
cluster around 24XCRC097 (Figure 3) to test the interpretation that the mineralisation has been
displaced by a late-stage fault. This hypothesis was based on the mineralisation abruptly
stopping to the south-west and with multiple intersections, including 4m @ 0.55g/t Au from
32m and 3m @ 0.35g/t Au from 48m and 1m @ 1.35g/t Au from 55m, appears to support this
hypothesis.
Additional drilling will be required to test whether this is an extension to the known zone that
hosts the multiple stacked high-grade veins observed in 24XCRC097 and more recently in
25XCDD002. This trend remains poorly tested over a strike length of ~1.5km (Figure 4).
Figure 4. Martin Prospect gold in drilling results highlighting the two emerging gold trends.
ASX TKM
10
TREK METALS LIMITED | INTERIM REPORT
Wide-spaced RC drill holes were also completed at Martin to expand open trends with step-
out holes drilled on 250m line spacing in the interpreted NW-SE trend and two holes to the
south of the main drill area within a zone of complex magnetics.
Zahn
Zahn represents the largest and most intense gold-in-soil anomaly at the Christmas Creek
Project and, prior to the intersection reported last year in 24XCRC074 (which returned 28m @
0.18g/t Au from 20m, including 7m @ 0.35g/t Au from 26m, with 1m @ 0.65g/t Au from 29m, refer
ASX:TKM 10 March 2025, https://trekmetals.com.au/announcements/6854541), the anomalism
remained largely unexplained.
The intersection in 24XCRC074 provided evidence as to the source of the large gold-in-soil
anomaly and is interpreted to belong to a mineralised folded dolerite contact adjacent to a
major fault. This is a classic orogenic pathway and gold trap site setting, with the length of the
contacts over 4km (Figure 5). Most importantly, these contacts remain largely untested. Two
recent RC holes targeted either side of hole 24XCRC074 and one north-south RC drill traverse
was drilled 250m to the east (Figure 5).
ASX TKM
11
TREK METALS LIMITED | INTERIM REPORT
Figure 5. Plan view of the Zahn Prospect area, showing target zones, drilling with significant intercept callouts and selected soil
samples above 5ppb Au. The background image is magnetics (TMI RTP 1VD) and shows an interpreted early high-mag intrusive
that has been folded, providing syn- and anti-formal structures adjacent to a demagnetised structural corridor/major structure.
The interpreted dolerite contacts (in solid black) represent high-priority drill targets.
Encouragingly, the step-out intersections support the previous interpretation of a mineralised
dolerite contact and most importantly these contacts remain largely untested:
• 12m @ 0.47g/t Au from 32m in hole 25XCRC031, including 4m @ 0.90g/t Au from 34m
• 12m @ 0.27g/t Au from 16m in hole 25XCRC032
Another hole targeting the interpreted mineralised contact returned significant results with:
• 20m @ 0.19g/t Au from 36m in hole 25XCRC049
A diamond hole was also completed from a similar collar location to 24XCRC074 and drilled to
test the adjacent interpreted anti-formal folded dolerite to the NW. This hole was drilled with
ASX TKM
12
TREK METALS LIMITED | INTERIM REPORT
an RC pre-collar and diamond tail to a total depth 303.3m. The drill-hole only returned minor
gold mineralisation, all in the RC pre-collar in a similar location to that recorded in 24XCRC074,
25XCRC031 & 032.
The Zahn Prospect remains a compelling exploration prospect with large-scale potential and
significant lengths of untested gold-hosting geological contacts.
Coogan-Brockhurst-Jobs Prospect
The previously individually identified targets of Coogan, Brockhurst and Jobs are now
interpreted to represent elements of a single mineralising system, interpreted as a very large
intrusion-related copper-gold system (ASX: TKM 29th
July 2025,
https://trekmetals.com.au/announcements/7075982).
The combined Coogan-Brockhurst-Jobs target has been elevated to a high priority status for
Trek, with the potential to host a significant intrusion-related copper-gold deposit. Once the
regolith interpretation is taken in account, and significant areas of apparent ineffective surface
geochemistry, it appears that the system could be continuous over a vast area of >10km (Figure
6).
This significant exploration prospect has recently been drill tested, with two wide-spaced
exploration RC traverses into Jobs, two RC holes with diamond tails into Brockhurst (a discrete
gravity high sitting adjacent to Coogan and within an area of interpreted ineffective surface
geochemistry) and one RC twin diamond hole into Coogan. The data from these holes will be
interpreted by a consulting geochemist as part of a whole project review.
Alternative methods for exploration under the interpreted depositional surface geology that
appears to have been ineffectively screened with the previously surface geochemical
sampling are being investigated, as are potential geophysical targeting techniques.
ASX TKM
13
TREK METALS LIMITED | INTERIM REPORT
Figure 6. Plan view of the Coogan-Brockhurst-Jobs target area highlighting the interpreted large-scale, intrusion-related copper-
gold system, with a core of Au-Cu-Bi and halo of Pb-Zn. Regolith interpretation suggests that the lack of surface geochemical
response may be due to the ineffective sample medium due to significant recent transported cover.
ASX TKM
14
TREK METALS LIMITED | INTERIM REPORT
MANGANESE DISCOVERY
Rock chip sampling undertaken at a recently discovered cluster of very high-grade
manganese outcrops (Figure 7) returned exceptionally high manganese grades which have
confirmed the commercial potential and significance of the find.
Figure 7: High-grade manganese rock chip sample example with 58.37% Mn (sample ID TKMCCR2506) interpreted to
represent near endmember pyrolusite, a high-grade manganese oxide.
The results are highly encouraging with very high-grade manganese assays (ranging from 47-
58% Mn) and additional moderate to high iron results of >50% Fe (refer Table 1 & Figure 8). The
occurrence of both high-grade Mn and Fe in close proximity to one another is a common
feature of hydrothermal manganese deposits such as Woodie Woodie in the Pilbara region of
WA.
ASX TKM
15
TREK METALS LIMITED | INTERIM REPORT
Table 1. Manganese rock chip sample results from Christmas Creek.
Sample ID
East
GDA20
North
GDA20
Tenement Mn % Fe %
Al
%
Si % P %
TKMCCR2501 266597 7874333 E80/5427 54.11 0.85 2.29 1.72 0.11
TKMCCR2502 266596 7874334 E80/5427 54.97 3.19 1.13 0.61 0.14
TKMCCR2503 266638 7874286 E80/5427 48.44 3.58 2.17 2.69 0.12
TKMCCR2504 266631 7874341 E80/5427 4.96 51.91 0.81 2.57 0.14
TKMCCR2505 266742 7874183 E80/5427 47.11 4.19 1.53 4.71 0.05
TKMCCR2506 266498 7874391 E80/5427 58.37 0.81 0.56 0.97 0.01
TKMCCR2523 266478 7874343 E80/5427 0.70 54.12 1.00 4.49 0.45
Figure 8. Plan view of the recently identified high-grade manganese discovery outcrop area, with semi-continuous outcrop over
~750m of strike, the first batch assay results – all >47% Mn in callouts – and recently submitted second batch sample locations in
pink (assays pending – expected late December).
ASX TKM
16
TREK METALS LIMITED | INTERIM REPORT
A selection of samples was tested for suitability to be detected by various geophysical
methods, and the results have confirmed that gravity and electromagnetics should be able to
detect the mineralisation. Following this work, the Company has engaged NRG (New Resolution
Geophysics) to undertake a high-resolution helicopter-borne electromagnetic and magnetic
survey.
The Company has also engaged Atlas Geophysics to undertake a ground gravity survey. The
gravity method is a passive, non-invasive geophysical technique involving the precise
measurement of the Earth’s gravitational field at specific locations on the Earth’s surface. Due
to the density of manganese oxides, this surveying technique should be able to detect any
significant accumulation of mineralisation at depth.
Boots-on-ground exploration is due to re-commence as a priority. Channel sampling,
mapping and rock chip sampling will be undertaken across the discovery outcrop area and
beyond.
These two geophysical techniques, along with the boots-on-ground mapping and sampling
will allow Trek to develop a robust drill plan to test this new high-grade manganese discovery.
Next Steps
With the recent completion of over 10,000m of exploration drilling across multiple large-scale
gold and copper-gold targets there is a large volume of work to review and results to interpret.
Next steps are outlined below:
• Detailed geochemical interpretation and integration with geological and geophysical
datasets, once assays have been received, looking for key alteration, zonation and
geological features to use as vectors towards gold or copper-gold mineralisation.
• Detailed structural and petrographic investigation of the diamond drill identify key
structures and mineralogy that control the gold and copper-gold mineralisation
intersected in the previously announced RC drilling.
• Target generation/refinement for the next round of exploration drilling.
• Investigation of applicable geophysical targeting techniques for the large-scale
Coogan-Brockhurst-Jobs target.
• Investigation of alternative sampling methods for the areas of interpreted ineffective
surface geochemistry across the wider project area.
This Company believes that the Christmas Creek Project is highly prospective for large-scale
gold and copper-gold and manganese deposits with the geological, geochemical and
geophysical picture of the predominantly undercover bedrock geology being enhanced
through each exploration activity.
ASX TKM
17
TREK METALS LIMITED | INTERIM REPORT
CORPORATE
Financial Summary
The net operating loss for the period was $4,902,690 (2024: $3,250,685). Key expenditure items
in the half year results included:
- Share based payments – $369,114
- Exploration and Evaluation expenditure expensed - $221,644
- Exploration and Evaluation expenditure impaired - $3,907,035
Included in investing activities were cash payments for Exploration and Evaluation expenditure
(capitalised) during the half-year of $3,106,767.
Cash Position/Expenditure
The Company held cash reserves of $2.05 million at the end of the reporting period.
Events Subsequent to reporting date
On 11th
November 2025, the Company issued 2,470,000 ordinary shares following the conversion
of vested Performance Rights.
On 2 December 2025, the Company issued 17,543,860 shares at an issue price of $0.057 to raise
$1,000,000. The proceeds of the placement will primarily be allocated to support the Company’s
accelerated exploration push at its recently announced high-grade outcropping manganese
discovery at Christmas Creek (see ASX releases, 13 and 17 November 2025).
On 2 December 2025, Mr Andrew Reece was appointed as a Non-Executive Director of the
Company.
Other than as detailed above, no other matters or circumstances have arisen since the end of
the financial year which significantly affected or may significantly affect the operations of the
Group, the results of those operations, or the state of affairs of the Group in subsequent
financial years.
ASX TKM
18
TREK METALS LIMITED | INTERIM REPORT
Auditor’s Independence Declaration
The lead Auditor’s Independence Declaration is set out on page 19 for the half year ended 30
September 2025. This report is signed in accordance with a resolution of the Board of Directors.
Competent Person Statement
The information in this report relating to Exploration Results is based on information compiled
by the Company’s Chief Executive Officer, Mr Derek Marshall, a competent person, and Member
of the Australian Institute of Geoscientists (AIG). Except where explicitly stated, this report
contains references to prior exploration results, all of which have been cross-referenced to
previous market announcements made by the Company. The Company confirms it is not
aware of any new information or data that materially affects the information included in the
relevant market announcements. Mr Marshall has sufficient experience relevant to the style of
mineralisation and to the type of activity described to qualify as a competent person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves.” Mr Marshall has disclosed that he has an interest in Shares and
Performance Rights in the Company. Mr Marshall consents to the inclusion in this
announcement of the matters based on his information in the form and content in which it
appears.
Signed on behalf of the Board.
John Young
Director
Dated: 4 December 2025
To the Board of Directors
Auditor’s Independence Declaration
As lead audit Director for the review of the financial statements of Trek Metals Limited for the
financial period ended 30 September 2025, I declare that to the best of my knowledge and belief,
there have been no contraventions of the auditor independence requirements of any applicable
code of professional conduct in relation to the review.
Yours faithfully,
HALL CHADWICK WA AUDIT PTY LTD MARK DELAURENTIS CA
Director
Dated at Perth this 4th of December 2025
ASX TKM
20
TREK METALS LIMITED | INTERIM REPORT
CONDENSED CONSOLIDATED STATEMENT OF
PROFIT OR LOSS
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
NOTES
HALF-YEAR
ENDED
30 SEPTEMBER
2025
$
HALF-YEAR
ENDED
30 SEPTEMBER
2024
$
Continuing Operations
Investment revenue 4 42,609 62,913
Other income 4 150,418 157,302
Share based payment expense 14 (369,114) (139,772)
Exploration and Evaluation expenditure (221,644) (104,480)
Exploration and Evaluation expenditure
impaired 7 (3,907,035) (2,568,235)
Finance costs (2,632) (8,012)
Other operating expenses 4 (595,292) (650,401)
Profit/(loss) before tax (4,902,690) (3,250,685)
Income tax expense - -
Profit/(loss) for the period (4,902,690) (3,250,685)
Attributable to:
Equity holders of the Parent (4,902,690) (3,250,685)
Earnings/(Loss) per share for
profit/(loss) from continuing operations
attributable to the ordinary equity
holders of the Parent:
Cents/share Cents/share
Basic earnings/(loss) per share 5 (0.842) (0.633)
Diluted earnings/(loss) per share 5 (0.842) (0.633)
Notes forming part of these financial statements are included on pages 26 to 43
ASX TKM
21
TREK METALS LIMITED | INTERIM REPORT
CONDENSED CONSOLIDATED STATEMENT OF
OTHER COMPREHENSIVE INCOME
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
NOTES
HALF-YEAR ENDED
30 SEPTEMBER
2025
$
HALF-YEAR ENDED
30 SEPTEMBER
2024
$
Profit/(loss) for the period (4,902,690) (3,250,685)
Other comprehensive income
Items that may not be reclassified
to profit or loss
Changes in fair value of financial
assets through Other
Comprehensive Income (33,000) (11,026)
Total Comprehensive Loss for the
Period Attributable to Owners of
the Company (4,935,690) (3,261,711)
Notes forming part of these financial statements are included on pages 26 to 43
ASX TKM
22
TREK METALS LIMITED | INTERIM REPORT
CONDENSED CONSOLIDATED STATEMENT OF
FINANCIAL POSITION
AS AT 30 SEPTEMBER 2025
NOTES
30 SEPTEMBER
2025
$
31 MARCH
2025
$
ASSETS
Current Assets
Cash and cash equivalents 6 2,051,390 1,697,383
Trade and other receivables 277,596 86,091
Total current assets 2,328,986 1,783,474
Non-current Assets
Property, plant and equipment 300,457 318,867
Right of Use assets 22,337 34,721
Exploration and evaluation expenditure 7 11,436,001 12,430,784
Financial assets 321,000 354,000
Total non-current assets 12,079,795 13,138,372
Total Assets 14,408,781 14,921,846
LIABILITIES
Current Liabilities
Trade and other payables 9 379,910 300,257
Lease liabilities 21,106 26,427
Provision 10 83,692 64,963
Total current liabilities 484,708 391,647
Non-current Liabilities
Lease liabilities 3,460 12,018
Total non-current liabilities 3,460 12,018
Total Liabilities 488,168 403,665
NET ASSETS 13,920,613 14,518,181
Equity
Issued capital 11 40,020,748 38,436,026
Reserves 64,199,118 61,893,718
Accumulated loss (90,299,253) (85,811,563)
Total Equity 13,920,613 14,518,181
Notes forming part of these financial statements are included on pages 26 to 43
ASX TKM
23
TREK METALS LIMITED | INTERIM REPORT
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
Consolidated Note
Issued
Capital
Share Premium
Reserve
Share Based
Payments
Reserve
Asset
Revaluation
Reserve
Accumulated
Losses
Total Equity
$ $ $ $ $ $
Balance at 1 April 2025 38,436,026 60,809,251 1,170,493 (86,026) (85,811,563) 14,518,181
Loss for the year - - - - (4,902,690) (4,902,690)
Other comprehensive income - - - (33,000) - (33,000)
Total comprehensive income
for the year - - - (33,000) (4,902,690) (4,935,690)
Transactions with owners,
recorded directly in equity
Issue of ordinary shares 1,538,347 2,074,153 - - - 3,612,500
Issue of ordinary shares on
exercise of options 105,507 330,715 - - - 436,222
Performance rights exercised 20,582 28,823 (49,405) - - -
Expiry of performance rights (415,000) 415,000 -
Share based payments 14 369,114 - - 369,114
Share issue costs (79,714) - - - - (79,714)
Balance at 30 September 2025 40,020,748 63,242,942 1,075,202 (119,026) (90,299,253) 13,920,613
Notes forming part of these financial statements are included on pages 26 to 43
ASX TKM
24
TREK METALS LIMITED | INTERIM REPORT
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
Consolidated Note
Issued
Capital
Share Premium
Reserve
Share Based
Payments
Reserve
Asset
Revaluation
Reserve
Accumulated
Losses
Total Equity
$ $ $ $ $ $
Balance at 1 April 2024 38,281,358 60,694,802 1,660,754 (54,000) (83,093,998) 17,488,916
Loss for the year - - - - (3,250,685) (3,250,685)
Other comprehensive income - - - (11,026) - (11,026)
Total comprehensive income
for the year - - - (11,026) (3,250,685) (3,261,711)
Transactions with owners,
recorded directly in equity
Performance rights exercised 7,851 18,091 (25,942) - - -
Share based payments 14 - - 139,772 - - 139,772
Expiry of share options - - (34,800) - 34,800 -
Balance at 30 September 2024 38,289,209 60,712,893 1,739,784 (65,026) (86,309,883) 14,366,977
Notes forming part of these financial statements are included on pages 26 to 43
ASX TKM
25
TREK METALS LIMITED | INTERIM REPORT
CONDENSED CONSOLIDATED STATEMENT OF
CASH FLOWS
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
NOTES
HALF-YEAR ENDED
30 SEPTEMBER
2025
$
HALF-YEAR ENDED
30 SEPTEMBER
2024
$
Cash flows from operating activities
Payments to suppliers and employees (575,154) (805,323)
Payments for exploration and
evaluation - (75,987)
Stamp duty - (161,385)
Other income received 151,487 170,532
Government grants (R&D) - 35,303
Interest received 40,998 75,210
Net cash used by operating activities (382,669) (761,650)
Cash flows from investing activities
Payments for exploration and
evaluation (3,106,767) (1,874,091)
Payments for exploration tenements - (1,300)
Proceeds from disposal of property,
plant and equipment - 59,449
Payments for property, plant and
equipment (9,105) (136,534)
Net cash used by investing activities (3,115,872) (1,952,476)
Cash flows from financing activities
Proceeds from issue of share capital 3,500,000 -
Proceeds from exercise of options 436,222 -
Payments for share issue costs (83,674) -
Net cash generated from financing
activities 3,852,548 -
Net increase/(decrease) in cash and
cash equivalents 354,007 (2,714,126)
Cash and cash equivalents at
beginning of the period 1,697,383 5,552,999
Cash and cash equivalents at the end
of the period 6 2,051,390 2,838,873
Notes forming part of these financial statements are included on pages 26 to 43
ASX TKM
26
TREK METALS LIMITED | INTERIM REPORT
NOTES TO THE CONDENSED CONSOLIDATED
FINANCIAL STATEMENTS
FOR THE HALF-YEAR ENDED 30 SEPTEMBER 2025
BASIS OF PREPARATION
NOTE 1: STATEMENT OF COMPLIANCE
The Half-Year report of Trek Metals Limited (“Trek” or “the Company”) and the subsidiaries it
controls (“Group”) is a general-purpose financial report prepared in accordance with
International Financial Accounting Standard IAS 34 ‘Interim Financial Reporting’. The Half-Year
financial report does not include notes of the type normally included in an annual financial
report and should be read in conjunction with the most recent annual financial report and any
public announcements made by Trek Metals Limited during the half-year reporting period in
accordance with its continuous disclosure obligations.
GOING CONCERN
The financial report has been prepared on the going concern basis, which assumes continuity
of no
Share your feedback
Discover